Tenders Are Invited For Reconstruction Of The Section Ul. Wisława Szymborska In Orzesz-Zadrótnia

Tender Detail

99496797
WZP.271.13.2025
Self-Funded
Tenders Are Invited For Reconstruction Of The Section Ul. Wisława Szymborska In Orzesz-Zadrótnia
NCB
central europe
European Union
05-08-2025

Work Detail

The Subject Of The Contract Includes: Reconstruction Of The Section Ul. Wisława Szymborska In Orzesz-Zazdrónie1) Reconstruction Of The Road Over A Length Of Approx. 216.5 M Profiling Of The Existing Foundation Structure. Equalizing The Existing Foundation With An Average Thickness Of 8 Cm. Arranging The Mineral And Bituminous Surface With An Area Approx. 827 M2. Making Absorbent Shoulders From Broken Aggregate With An Area Approx. 210.50 M2, Humus Of The Slope With A Area 200 M2. Introduction Of Target Traffic Organization. 2) Order Scope: 1. Construction Works Should Be Performed In Accordance With Documentation, Opinions And Arrangements, A Pre -Trend, Sstwior, Applicable Regulations, Norms And Principles Of Technical Knowledge, In A Way That Ensures The Safety Of People And Property2. In The Event Of Damage To The Existing Road Surface Outside The Work Area, The Abovementioned The Surface Should Be Brought To The Original State3. Work To Organize In A Way That Ensures Residents Access And Access To The Property From 16.00 To 8.00 In The Morning, As Well As The Use Of Water, Sewage, Electricity And Communication Means4. When Calculating The Price Of The Offer, Take Into Account The Possible Costs Of Industry Supervisory And Securing The Weapon Network5. At The Site Of The Existing Underground Weapon Network, Be Particularly Cautious When Performing Construction Works. Any Close -Ups Should Be Agreed With Network Gestors6. Allow Access By A Privileged Car If Necessary 7. Notify The Road Manager - The Mayor Of The City Of Orzesze, The Staroste Of The Mikołów Poviat And The Poviat Police Headquarters In Mikołów And The Residents Of Introducing Traffic Restrictions On The Time Of Work 7 Days Before The Date Of Its Introduction, As Well As About The Introduction Of The Target Organization Of Traffic8. The Front Of The Works Will Be Handed Over After The Marking Is Received For The Duration Of The Works9. The Contractor Will Ensure The As -Built Inventory Of The Rebuilt Road, And Its Implementation Will Include In The Price Calculation Of The Offer. 10. The Contractor In The Notification Of The Completion Of Works Will Submit To The Employer All Certificates And Tests And A Map Of As -Built Inventory. 11. After Completed Robots, Remove The Marking For The Duration Of The Works And Organize The Works Area And Adjacent Areas12. Until The End Of The Final Acceptance, The Contractor Shall Submit To The Ordering Party A Report On The Target Acceptance Of The Traffic Organization. 1.3. A Detailed Description Of The Subject Of The Contract Is The Design Documentation And Technical Specification Of The Execution And Acceptance Of Works (Annex No. 4 To Swz). 1.4. The Employer Allows The Use Of Materials Other Than Used In The Project, Equivalent, With Appropriate Technical And Quality Parameters. Technical And Quality Parameters For The Materials Used In The Technical Documentation Are Minimal Values. 1.5. Contractors May Submit Offers Containing Solutions Eq

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail