A. The Subject Of The Contract Consists Of Robots Such As: 1) Repairs And Repair Of Pavement Surfaces And Roadways Made Of Small -Dimensional Elements. 2) Supplementing And Replacement Of The Foundations. 3) Renovation And Repair Of Non-Compressed Surfaces. 4) Repairs And Repairs Of Road Curbs And Lawn Edges. Elements. 9) Earthworks And Cleaning Works In The Road Lane. 10) Performing Other Necessary Works Resulting From The Above Subject Of The Contract. The Concise Range Of Individual Activities Commissioned And Will Be Specified Each Time In The Report Of The Works Typing. The Subject Of The Contract Also Consists Of: 1) Comprehensive Geodetic Service Together With The As -Built Geodetic Inventory. 2) Execution Of As -Built Documentation. 3) Organization, Development And Liquidation Of The Construction Site. 4) Preparation Of A Safety And Health Protection Plan, If Separate Provisions Require Such A Plan. Within The Implemented Range Of All Foreign Elements Such As Inlets And Wells Of Rainwater And Sanitary Sewage Systems, Teletechnical Wells, Hydrants, Borders Of Basement Windows, Power Cabinets, Etc. 8) Ensuring Permanent Access And Access To The Facility During The Works. 9) Renovation And Repair Of Damaged Surfaces In The Streets And Pavements Not Covered By The Scope Of Commissioned Works. 10) Attempts And Acceptance With The Participation Of The Required State Institutions, Investor And User.11) Collecting Waste Generated In The Results Of The Subject Of The Contract And Transferring Them To Recovery, Disposal Or Storage. Waste Resulting In This Way - Including All Kinds Of Above -Ground, Underground, Inorganic And Organic Residues Such As Debris, Scrap, Trunks, Roots, Carpins, Etc. - Should Be Handed Without Undue Delay To Provide An Entrepreneur With Permission To Transport Waste In Accordance With Applicable Regulations, And If The Contractor Has Such A Permit - Transfer To The Entity To Dispose Of These Waste. Storageing In The Area Of The Construction Site In The Place Indicated By The Contracting Authority Of Dismantled Materials Suitable For Recovery Is Possible Only Until The Deadline For Completing The Subject Of The Contract. The Contractor Is Obliged To Provide The Ordering Party With Documents Confirming The Transfer Of Waste To Entities Indicated In The Second Sentence. 12) The Contracting Authority Reserves The Following Materials From The Demolition: Pavement Tiles, Paving Stones, Curbs, Pavement Edges. Therefore, It Is Necessary To Predict A Clean Way Of Dismantling Them From A Building, Enabling Them To Be Reused And They Should Not Be Utilized Or Transferred To An Entrepreneur With Permission To Transport Waste In Accordance With Applicable Regulations. 13) The Decision Will Be Made By The Inspector Immediately Before Demolition. The Materials Should Be Placed On Pallets, Secured With Tape Or Foil And Prepared For Transport. 14) Transporting Materials From Demolition And Suitable For Re-Use In The Place Of Storage Indica
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.