Demolition Work - Bkp 112 Dismantling (Without Contaminated Sites) New Building Hallenbad Oberdorf. The City Of Dübendorf Is Building A New Indoor Pool On The Existing Outdoor Pool Area At Oberdorfstrasse 23, 8600 Dübendorf. The Building Planned As A Replacement Building Comes In The Area Of The Existing Outdoor Pool Infrastructure. The Combination Of Indoor And Outdoor Pool Infrastructure At A Location Creates An Attractive Offer That Benefits The Population In Particular. At The Same Time, The New Indoor Pool Should Offer Enough Capacities For Swimming Lessons And Swimming Sport Of Schools And Clubs In The Long Term. With The Combination Of Indoor And Outdoor Pools, Many Advantages And Synergies Can Also Be Used For Operation And Technology And Both Systems Are Operated More Economically. For The Upcoming Construction Project, The Existing Outdoor Pool Buildings, Including The Additional Building Infrastructure On The Area, Must Be Canceled And The Conditions For Creating The Shell Construction Must Be Created.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.