1. The Subject Of The Contract Is The Delivery Together With The Installation Of An Energy Storage For The Building Of The District Court In Opoczno At 20 Biernackiego Street, As Well As The Execution Of Construction Works To The Extent Necessary For The Correct Performance Of The Contract. The Subject Of The Contract Was Specified In The Attachments To Swz, Including In Particular In: - Technical Project - Annex 2 To Swz, - A Prejudice Of The Works (The Bill Of Quantity Was Attached Auxiliary, They Can Only Be The Base For Further Calculations Of The Contractor When Calculating The Offer Price, While The Contractor Estimates The Offer Price Based On Their Own Measurement Calculation) - Annex No. 3 To Swz, That The Solar Installation Is Covered By A Warranty. In Connection With The Above, The Employer Requires That The Expansion Of The Installation By The Energy Bank Be Made In A Way Compatible With The Existing Installation, While Ensuring Its Improper Operation. The Contractor Is Therefore Obliged To Perform The Subject Of The Contract In Such A Way That The Contracting Authority Does Not Lose The Rights From A Guarantee Granted To The Solar Installation. In The Event That The Contracting Authority Loses The Guarantees Due To The Contractors Actions, The Contractor Is Obliged To Repair Any Full Damage Suffered In This Respect. In Particular, The Contractor Will Be Obliged To Incur Costs Resulting From The Repair Of The Installation. 2 3. The Contracting Authority Reserves That The Contractor Will Be Obliged To Conduct During The Courts Working Hours, And In Exceptional Cases, Work Causing Noise, Outside The Courts Working Hours (Including The Possibility Of Working On Saturdays And Sundays). In This Case, The Contractor Will Notify The Contracting Authority In Writing About The Need To Perform Such Works At Least 2 Days In Advance. The Contractor Is Obliged To Work In Such A Way As To Enable The Courts Normal Work. 4. The Contractor Will Be Obliged To Transfer Before The Commencement Of Work To The Investment And Repair Department Of The District Court In Piotrków Trybunalski (Room 110): - A General List Of Persons (Employees) Who Will Perform Installation Work, In The Event Of A Change Of Persons During The Contract, The Contracting Authority Should Be Submitted To The Contracting Authority, - Each Time At Least 2 Days In Advance, Before The Start Of The Work Performed Outside The Courts Work. (Employees) Who Will Perform Work. 5. Work Should Be Carried Out In Accordance With The Abovementioned Description And Recommendations Of The Employer And Inspector Of Investors Supervision. The Contractor Is Responsible For The Execution Of Works And Deliveries In Accordance With The Technical And Qualitative Conditions Described For The Subject Of The Contract. 6. The Salary Is Flat -Rate. The Contractor Is Obliged To Carefully Check The Amount Of Works With The Design Documentation. An Possible Lack In The Pre -City Of Works Necessary To Be Carried Ou
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.