The N7, Tay Lane Footbridge Rehabilitation Works consist of the following rehabilitation works to the bridge: 1) Replacement of existing stairs and ramps to the south of the structure 2) Replacement of the existing stairs to the north of the structure 3) Preparation of steel substrate by grit blasting or other specified means and installation of a protective paint system for all elements 4) Waterproofing and resurfacing of the deck 5) Provision of additional drainage 6) Installation of visual barrier panels
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.