Cycle Path And Precipitation 1St Sub- Offer (Bicycle Path Next To Main Road No. 35): Bidder For The Renovation Of The Existing Bicycle Facility In The Inner Area Of Hajd b sz rm ny No. 35. On The Right Side Of The Main Road, Parallel To The Road Surface, On The Section Between Bart k B. And Vajda J. Streets, It Is Planned To Be 476 Meters Long. During The Renovation, We Plan To Renovate And Standardize The Accident-Prone Pavement Of The Existing Bicycle Path On The Section Affected By The Design With A Pavement Width Of 2.30 Meters On Both Sides With A 0.50-0.50 Meter Wide Refined Bench As An Independent Two-Way Bicycle Path. In The Section Where No. 35 He Designed A Prominent Edge With A Ribbon Barrier Between The Main Road And The Bicycle Path. A Paved Bench 0.25 Meters Wide Will Be Created On The Side Of The Highlighted Edge In Order To Ensure The Drainage Of Rainwater Generated On The Planned Pavements. Due To The Special Border To Be Built On The Side Of The Bicycle Path Between The Pavement Of The Bicycle Path And The Public Road, It Is Necessary To Install A Strip Barrier Parallel To The Public Road. Implementation Locations: 5370/2 Ol h F. Utca Cycle Path 5370/1 Ol h F. Utca 5382 T th . Utca
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.