Pumping out, Cleaning and Disposal of Oily Waste from Oily Water Collection Basin

Tender Detail

53320566
2332201451
Self-Funded
Pumping out, Cleaning and Disposal of Oily Waste from Oily Water Collection Basin
ICB
Western Asia
Arab World,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
21-07-2022

Work Detail

Quotation are invited for Pumping out, Cleaning and Disposal of Oily Waste from Oily Water Collection Basin Pumping out, Cleaning and Dis 1032202355rfx Description PUMPING OUT, CLEANING AND DISPOSAL OF OILY WASTE FROM OILY WATER COLLECTION BASIN 1 ITEM-00001 OUTSOURCING WORK M STATION, JEBEL ALI POWER STATION NAME OF WORK: PUMPING OUT, CLEANING AND DISPOSAL OF OILY WASTE FROM PRIMARY OI LY WATER COLLECTION BASIN 1.#MAIN PIT -LENGTH 14.60 METER X WIDTH 6.30 METER X HEIGHT 7.50 METER # 1 NO. 2.#SUMP PIT - LENGTH 2.0 METER X WIDTH 2.0 METER X HEIGHT .740 METER # 1 NO. OIL/WATER LEVEL WILL BE 0.5 METER PERIOD OF WORK: 7 DAYS PRE REQUISTE: #THE CONTRACTOR SHALL VISIT THE SITE AND MAKE HIMSELF FULLY FAMILIAR WITH THE WORK SCOPE, PLANT ACCESS, FACILITIES, COMPLEXITIES, SAFETY MEASURES ETC., BEFORE HE SUBMIT HIS BID. #THE CONTRACTOR SHALL BE A DUBAI MUNICIPALITY AUTHORIZED COMPANY FOR HANDLING & DISPOSAL OF OILY WASTE. RELEVANT DOCUMENTS TO BE SUBMITTED. #THE CONTRACTOR SHALL HAVE PAST EXPERIENCE RELATED TO SIMILAR ACTIVITIES. RELEVANT DOCUMENTS TO BE SUBMITTED. #ACTUAL LEVEL OF OILY WATER TO BE CHECK ON SITE. A.#SCOPE OF WORK: PUMPING OUT, CLEANING AND DI SPOSAL OF OILY WASTE FROM PRIMARY OILY WATER COLLECTION BASIN #GET PTW (PERMIT TO WORK) AND LC (LINE CLEARANCE) DOCUMENT FROM DEW A #EVALUATE THE RISK INVOLVED IN (TANKER MOVEMENTS, PUMPING OUT THE WASTE, CLEANING THE PIT AND DISPOSAL OF WASTE) #TO GET A PTW, CONTRACTOR HAS TO SUBMIT RISK ASSESSMENT FORMS AND METHOD STATEMENT. SAFETY PERSONNEL TO BE AVAILABLE ON SITE #MOBILIZE THE LABOR, PUMP, EQUIPMENT, SAFETY TOOLS, PORTABLE STORAGE TANKS, ROAD TANKER, SKID AND CONSUMABLES. #PUMP OUT WASTE FROM THE PIT TO BY USING PNEUMATIC PUMPS TO DUBAI MUNICIPALITY APPROVED TANKER FOR DISPOSAL. #VENTILATE THE PIT FOR GAS FREE AND SAFE MAN WORKING. #ARRANGE A THIRD PARTY SURVEYOR CERTIFICATION OF SAFE MAN ENTRY OF THE PIT #REMOVE THE SLUDGE IF ANY FROM PIT BOTTOM PACKED INTO VINYL BAGS AND FILLED INTO SKID FOR SAFE DISPOSAL. ONLY NON-SPARKING TOOLS TO BE USED. #APPLY BIO-DEGRADABLE DE-GREASER TO THE PIT BOTTOM, AN D INTERNAL SIDE SHELLS. #SOFT BRUSHING THE ENTIRE INTERNAL SURFACE WITHOUT DAMAGING THE PAINT TO REMOVE ENTIRE GREASY AND OILY SEDI MENTS #APPLY HOT WATER WASHING TO THE TANK BOTTOM AND ENTIRE TANK INTERNALS WITHOUT DAMAGING THE SURFACE COATINGS #PUMP OUT THE WA SHED WATER TO THE ROAD TANKER AND DISPOSE THE SAME AS PER LOCAL RULES AND REGULATIONS. #MOP AND DRY THE ENTIRE INTERNAL SURFACE OF THE PIT FOR FINAL INSPECTION FROM DEWA AUTHORIZED PERSONNEL. #DISPOSAL OF THE ENTIRE WASTE REMOVED FROM THE PITS AT DUBAI MUNICIPAL ITY APPROVED FACILITY #MAKE GOOD HOUSEKEEPING IN THE AREA AT ALL TIMES #DE MOBILIZATION AND SITE CLEARANCE. #SUBMIT THE FINAL REP ORT INCLUDING LABORATORY REPORTS FROM DUBAI MUNICIPALITY APPROVED FACILITY B.#GENERAL TERMS & CONDITIONS #THE CONTRACTOR SHALL H AVE THE EXPERIENCE OF THIS TYPE OF WORK. STUDY THE DRAWINGS SUPPLIED BY DEWA BEFORE START OF WORK. #THE CONTRACTOR SHALL SUBMIT THE SCHEDULE OF WORK AND THE PERIOD FOR WORK, SO ALL OTHER WORKS SHALL BE COMPLETED WELL WITHIN THE ALLOTTED PERIOD. THE SCHEDULE SHALL BE APPROVED BY DEWA BEFORE COMMENCEMENT OF WORK. #THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DELAY IN CARRYING OUT THE WORK. #TH E CONTRACTOR SHALL ENSURE HOUSEKEEPING ON A DAILY BASIS AND HE SHALL BE RESPONSIBLE FOR ALL WASTE MATERIAL DISPOSALS TO DESIGNATED P LACES. #ALL DEWA SAFETY & ENVIRONMENT POLICY, RULES AND REGULATION SHALL BE FOLLOWED AT WORK SITE DURING THE EXECUTION OF THE WORK. THE CONTRACTOR#S ENGINEER SHOULD BE FAMILIAR WITH SAFETY REGULATIONS WHILE WORKING IN A HAZARDOUS AREA. #ALL RIGGING TOOLS ETC. SH OULD BE DULY TESTED AND CERTIFIED BY THE 3RD PARTY INSPECTION AGENCY AND THE CERTIFICATES SHOULD BE PRODUCED ON DEMAND. #THE WORK S HALL BE EXECUTED UNDER DEWA SUPERVISION AND AS PER QUALITY / SCHEDULE REQUIREMENT. CONTRACTOR#S SUPERVISOR SHALL BE AVAILABLE AT SIT E THROUGHOUT THE PERIOD OF WORK. #LIFTING AND HANDLING MUST BE MADE ONLY BY QUALIFIED RIGGING PERSONNEL TO AVOID FALL & DAMAGE. THE IR CERTIFICATE SHALL BE PRODUCED ON DEMAND. #THE CONTRACTOR SHALL APPLY FOR THE PERMIT TO WORK WELL IN ADVANCE AND THIS REQUEST SHA LL BE FOLLOWED WITH METHOD STATEMENT, RISK ASSESSMENT AS ATTACHMENTS #ENTRY PERMITS FOR THE WORKERS SHALL BE APPLIED WITH PASSPORT COPIES HAVING VALID VISA. PERSONS, WHOSE NAMES ARE NOT AVAILABLE IN THE LIST, WILL NOT BE ALLOWED TO ENTER THE POWERHOUSE. #ENTRY P ERMITS FOR THE VEHICLE SHOULD BE APPLIED WITH COPIES OF VEHICLE REGISTRATION AND DRIVER DRIVING LICENSE #ENSURE THAT RUNNING SYSTEM AND PERMANENT INSTALLATION ARE PROTECTED FROM INTERRUPTION AND DAMAGES. ANY NEARBY EQUIPMENT OR PIPES DAMAGED DURING THE WORK. CONT RACTOR SHOULD REPLACE THE SAME AT THEIR OWN COST #THE CONTRACTOR SHALL ENSURE A SAFE WORKING CONDITION WHILE WORK IN PROGRESS. CONT RACTOR SHALL CHECK SITE CONDITION SUITABLE TO CARRY OUT WORK BY CHECKING THE LINE ISOLATION AND PROPER DEPRESSURIZING OF THE LINE. C ONDUCT SITE SURVEY AND SAFETY INSPECTION TO ASSESS THE WORKING ENVIRONMENT #ALL THE PERSONS SHALL WEAR THE UNIFORM, SAFETY SHOES AN D HELMET WHILE AT WORK AND NECESSARY PPE WHILE WORK. #SAFETY SIGNS SHALL BE PROVIDED AND WHEREVER REQUIRED THE AREA IS TO BE BARRIC ADED FOR SAFETY AND TO PREVENT UNAUTHORIZED ENTRY OF PERSONNEL. #ALL MATERIAL AND TOOLS BROUGHT IN SHALL BE DECLARED AT POWER STATI ON SECURITY GATE AND THE LIST OF THESE ITEMS SHALL BE SIGNED BY DEWA SECURITY. THE COPIES OF THESE DOCUMENTS SHALL BE LODGED WITH DE WA ENGINEER IN-CHARGE ON DAILY BASIS. THIS DOCUMENT WILL BE THE BASIS FOR THE CLEARANCE (GATE PASS) TO TAKE THEM OUT ON COMPLETION O F THE JOB. #ANY ACCIDENT/NEAR MISS/ ABNORMALITY SHALL BE IMMEDIATELY REPORTED TO DEWA ENGINEER-IN-CHARGE #CONTINUOUS SUPERVISION F OR THE ACTIVITY SHALL BE DONE. NAME AND CONTACT NO. OF CONTRACTOR SUPERVISOR SHALL BE PROVIDED. #TOOLBOX TALKS SHOULD BE GIVEN TO T HE WORKMEN BY THEIR SUPERVISOR BEFORE START OF WORK. #DEWA ENGINEER-IN-CHARGE SHALL BE UPDATED THE WORK PROGRESS ON A REGULAR BASIS . C.#GUIDELINE FOR DEWA CONTRACTORS TOWARDS COVID 19 PANDEMIC #CONTRACTOR SHALL PROVIDE THE FOLLOWING : A.#TOTAL EMPLOYEES OF TH E CONTRACTOR. SOURCED/ OUTSOURCED. B.#RECENT TRAVEL HISTORY OF THE CONTRACTOR STAFF#S CLOSE RELATIVES / FRIENDS/ ROOMMATES FOR THE L AST 14 DAYS. C.#RECENT VISIT TO HEALTH CARE CENTERS (CLINIC/HOSPITAL) AND REASON FOR VISIT. (FOR LAST 14 DAYS) D.#INFORMATION ABOUT E.#ANY COVID 19 CASE FOUND POSITIVE AMONGST CONTRACTOR STAFF FOR THE LAST 14 DAYS AND ANY ACTIVE POSITIVE CASES I.#ANY WORKERS IF HA S CONTRACTED ANY COVID 19 AFFECTED PERSONAL II.#ANY WORKER(S) IN ISOLATION CURRENTLY III.#ANY WORKER(S) IN QUARANTINE BY DHA IN LAST 14 DAYS IV.#ANY WORKER(S) HAS SYMPTOMS LIKE COVID 19 IN LAST 14 DAYS. #SUBMIT COVID 19 RISK AND MITIGATION PLAN TO PROJECT EXECUTI ON DEPARTMENT OF DEWA ON PRIORITY BASIS. INCLUDE INSPECTIONS & PROVISIONS OF HEALTH TO WORKERS AT SITE. #PROVIDE DETAILS OF MESS, C ANTEEN, SALOON, GROCERIES AND ANY OTHER FACILITIES INSIDE CAMP PREMISES IF ANY AND PROVIDE DISINFECTION PROGRAM OF WELFARE FACILITIE S. #PROVIDE DETAIL ABOUT CAPACITY OF ISOLATION ROOMS AVAILABLE AT CAMP. #GUIDELINES FOR DEWA CONTRACTORS WORKING ON DEWA PROJECTS: A.#COVID VACCINATION IS MANDATORY. B.#AVOID ALLOWING WORKER(S) TO GATHER IN PUBLIC PLACES C.#CONCEAL THE MOVEMENT TO CAMPS D.#STRIC T ADHERENCE TO ENTRY TO CAMPS BY VISITORS TO BE AVOIDED. E.#PROPER DISINFECTION STANDARD MEASURES AT WORK SITES AND CAMPS F.#REPORT ANY FLU SYMPTOMS AND OTHER SIMILAR COVID 19 SYMPTOMS CASES TO HEALTH CARE PROVIDER AND ISOLATE THEM ACCORDINGLY G.#MAINTAIN DAILY SC REEN RECORDS OF WORKER(S) H.#PRACTICE SOCIAL DISTANCING AT CAMPS AND WORK SITES I.#DETAILS OF PROVISION OF PPES PROVIDED TO WORKERS E.G., GLOVES, MASKS, FACE SHIELD AND SANITIZER J.#PREVENT CONTRACTOR WORKER(S) FROM SOCIAL ACTIVITIES AND TRAVELING K.#SANITIZING OF BUSES, COASTERS AND OTHER VEHICLES PRIOR TO EACH SHIFT CHANGE L.#SANITIZING OF OFFICE, MESS FACILITIES, FLOORS AND HARD SURFACES PE RIODICALLY M.#COMMUNICATE ALL COVID 19 PRECAUTIONARY MEASURES TO ALL CONTRACTOR STAFFS. N.#APPROPRIATE COORDINA 1 LS STANDARD TERMS & CONDITIONS 1) Prices should be 'DDP' delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is '30 days credit' from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Tender Link : https://www.dewa.gov.ae/api/RfxDownload/2332201451

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail