Asia-Pacific Economic Cooperation, APEC,APAC ( Asia Pacific)
14-07-2022
Work Detail
The Work Consists Of Furnishing And Installing All Materials, Labor, Tools, Equipment, And Related Services Required For A Complete Project In Accordance With The Contract Documents. The Project Begins Approximately 825 Linear Feet West Of The Centerline Of I-75 And Proceeds Approximately 2,060 Linear Feet East To The Intersection Of Tanger Boulevard. This Project Includes But Is Not Limited To Traffic Control, Erosion And Sediment Control, Limited Road Widening, Limited Interstate Ramp Modifications, Concrete Curb And Gutters And Sidewalks, Stormwater Improvements, Installation Of Traffic Medians With Landscaping, Milling And Resurfacing Of Existing Asphalt Surfaces, Traffic Striping, Traffic Signal Modifications, And Signage Within The Project Limits.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.