Construction Of Eastside Sewerage System Improvements The Work To Be Completed Shall Consist Of Furnishing All Labor, And Equipment, Necessary To Rehabilitate The Existing Eastside Lift Station, Install Approx. 27,000 Linear Feet Of 42, 30, And 24 Gravity Sewer Main, And Abandon The Existing Bridgestone Lift Station, Including, But Not Limited To, Temporary Bypass Pumping, Removing Existing Pumping Equipment And Appurtenances, Abrasive Blasting The Existing Wet Well, New Inline Pumps, Manual Bar Screen, Ductile Iron Piping And Valves, Generator, Electrical, Mechanical, Scada System, Manholes, Jacking And Boring, Roadway Replacement, Earthwork, Grassing, Soil Erosion And Sedimentation Control Measures, And Appurtenances Necessary To Provide A Complete Installation. Some Materials Will Be Provided By The Owner And The List Of Materials Will Be Provided.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.