Additional information: Ii. Increase the Safety of the Territory against the Back-Air of the Small Danube and the Kl tovsk Shoulder from Vase Iii. Stage Dyke construction work Short Description: Random protective dude of the small Danube in the section assessed (from the youth bridge (Kol ro after S ASOD (including) does not have a uniform height. In the time periods in which the koruna has been built and increased dike, They did not follow the adjustment of the uniformity of the protective line. Long-term operating experiences point to the need for high-rise Reconciliation of crown of dyke and increasing the static and filter resistance of the dike and its subsoil throughout the section, especially with In view of the phenomena occurring with extreme and long-term loads. From previous project steps The uniform adjustment of the koruna height was taken over 114.00 and studies, hydraulic calculations for Assessed flow combination and feedback height was confirmed within acceptable scattering and accuracy Computer model in Kol rovo, S ASOD, top tolls per kote 114,00 m N.M. The proposed structure is not new activity at the area concerned. Implementation of the building is in terms of flood protection, increasing Flood protection and this attention to an existing darbous body and its subsoil by building PTS and By increasing the right-handed protective duty of the small Danube on a dimension 114.00. Deadline for Submission: 20220329 09:00 Type of Buyer: Body governed by public law Type of Contract: Works Type of Procedure: Open procedure Regulation: European Union, with participation by GPA countries Type of Bid: Submission for all lots Award Criteria: Lowest price [Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.]
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.