Arab World,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
07-03-2022
Work Detail
Quotation Are Invited For Comprehensive Annual Maintenance Contract Operation Maintenance Of Sewage Treatment Plant At Dewa Various Location 1 1032200721 Amc Sewage Treatment Plantrfx Description1 Item 00001 Comprehensive Annual MaintenanceContract Operation Maintenance OfSewage Treatment Plant At Dewa VariousLocation Scope Of Work The Parties Shall Visit The Site And MakeThemselves Thoroughly Acquainted WithLocal Site Conditions Nature AndRequirement Of WoRk Present Conditions Of The Plant AndMake An Assessment Of Labor And Material Required Before Submitting The Price Included EquIpment Breakdown Spare PartsReplacement Engineering Services AndLabor Charges The Quote Shall BeSubmitted For One Year THe Contractor Shall Have MaintenanceExperience Of Similar Stp Plants For AMinimum Of 5 Years The Contract Shall BeValid For A PeRiod Of 12 Months Commencing From TheDate Of Award Of The Contract ToProvide Operator For Operating And Maintaining The Stp GWtp 1 X 09 Hours 6 Am To 3 Pm 6 Days A Week Shall Be Fully Responsible For OperationOf Stp With All Related Pumps Equipment ANd Or Its Accessories And Controls InAccordance With Its Requirements AndFunction And Keep Systems Working At AllTimes To EnsureThe All The Plant Parameters As PerAuthority Standards To Submit DailyOperation Maintenance Log Sheets AndCarry Out Daily WEekly And Monthly Preventive MaintenanceOf All Equipment And Submit The Reports InPrescribed Format The Contractor ShallBe ResPonsible To Maintain The Quality Of TheWater Within The Limits Of DubaiMunicipality Regulations And Scope OfWork Include CoordinaTion Mandatory To Obtain NecessaryEnvironmental Clearances From Dm ShallBe Included In Amc Price Scope Of Work Related To AnnUal Inspection Includes Coordination WithDm Inspector Whenever Called For ScopeOf Work Also Includes Repair ReplacementOf VaLves And Other Consumable Items Mechanical Replacement The ContractorIs Required To Bear The Charges OfConsumables Such As ContaCtors Fuse Normal Valves Mcb Pipefittings Etc Costing Up To Aed 2000 InCase The Same Is Not In ServiceableConditions AndAbove The Value However The Cost Of TheItem Will Be Paid Separately AftermarketVerification Item Will Be Arranged MajorSparEs Replacement Like Impeller Change OfPumps Blowers Uf Module Ro Module Mbr Membrane Motorized Valve Damage Water Meters AiR Blower Air Diffuser Shall Be Excluded Media Changing Shall Be Done Once In Six Months In Presence Of A DewaRepresentative And Price Will Be Included In The Offer MajorSpares Replacement Like Impeller ChangeOf Pumps Blowers Uf Module Ro Module MbrMembrane Motorized Valve Damage WaterMeters Air Blower Air Diffuser Shall BeExcluded The Contractor Shall CleanThe Storage Tanks Sand Trap As Per ActualRequirement And Dispose Of The Sludge AndWastes As Per Local AuthorityRegulations Maintenance CleAning Of All Related Electrical Plumbing Installations Area Daily Deep Cleaning OfAll The Areas As Above Shall Be Carried Out On Saturday Holidays AllEnvironment Friendly CleaningMaterials Equipment Have To Be Provided ByThe Contractor To MaintainAdequate Stock Of Spares Subject To AnInspection Of To Test Water Samples Per Month From Dm Approved Laboratory RawWater TreateD Water And Provide Reports To SupplyAll Treatment And Odor Control Chemicals Spare Parts And Consumables As Required It Is Therefore Essential That The ContractorShould Maintain A Sufficient Stock OfFrequently Used Materials At The Site ToReduce AnyDowntime During Breakdown In Addition Keep Proper Inventory Records AnyPenalty Imposed By The Local AuthorityShall Be Borne BY The Contractor The Contractor ShallBe Responsible To Arrange A 10 000 Gallons Tanker To Pump Out The Excess Water FromThe StP Tank During Any Emergency Or RainySeason Equipment Details 1 SewageTreatment Plant Mbr Tse Plant 400M3 Day At Dewa JapsBachelor Accommodation Building 2 Sewage Treatment Plant 700 M3 Day AtDewa Japs Family Accommodation Building 3 Sewage TreatmenT Plant Greywater Treatment Plant AtOffices Building Accommodation ForDistribution Division At Ruwaiyah 190 M3Sewage TreatMent Plant 200 M3 Greywater TreatmentPlant 20 M3 Blowdown NeutralizationPlant 4 Sewage Treatment Plant VehicleWash TreatMent Plant Daf Garage RuwaiyahBreakdown Call All EmergencyMaintenance Calls To Be AttendedImmediately 24X7 Round The Clock 365 Days No Extra Payment Will Be Made ForWorking On Odd Hours Emergency Works Repairs To Plant Equipment It Will TheObjective Of Agreement That The Contractor WillProvide All Labor Necessary ForMaintaining The Equipment In GoodOperating Condition Furnish Remedial Maintenance And Provide ATeam Of Engineers To Keep EquipmentWorking Up To The Manufacturer SSpecifications PaymentTerms Payments Shall Be Quarterly OnCompletion Of Each Monthly PreventiveMaintenance Visit And Breakdown Visit AndSubmission Of REport Duly Signed By Our Dewa Cpe WmRepresentative General Conditions TheContractor At Dewa Work Premises ShallFollow Dewa SaFety Environment Policy Rules AndRegulations During The Contract Period The Contractor Shall Carry Out RiskAssessment For ALl His Works This Risk Assessment Shall BeFrom Safety As Well As OccupationalHealth Considerations Dewa Format To BeUsed Toolbox Talks Should Be Given To TheWorkmen By Their Supervisor Copy OfWhich Shall Be Given To Dewa No Welding Flame Heating Or Cutting Grinding Pneumatic Chipping Etc Shall Be Carried Out Without SpecificClearance From Dewa Through Hot WorkPermits The Hot Work Permit If Required Shall BeObtained On Daily Basis The ContractorShall At No Time Keep InflammableSubstances IN The Plant Work Areas All HazardousWastes Shall Be Moved Under DirectionFrom And With Written Approval To DewaSpecial StoragE Area The Contractor S Work Will FallWithin The Purview Of Safety SurveysConducted Regularly By The Dewa SafetySection AllThe Workmen Should Wear Necessary PpesLike Uniform Safety Shoes And HelmetWhile At Work All Cranes Vehicles Special Tools OF Contractor Shall Be Inspected AndTested By Capable Authorities And Contractor Shall Provide Dewa With CopyOf Certificates Of TheIr Fitness Before Their Use At Site AllEquipment Like Rigging Tools GrindingMachines Drilling Machines Hand Tools PrecisioN Tools With All Valid Test CertificatesFrom 3Rd Party Licensed CertifyingAgencies Shall Be Produced By TheContractor ErectioN Use Of Scaffolding Use Of LiftingTrolleys Shall Be Certified By DewaAuthorized Personnel And Shall BeSupervised By ContractSupervisor Before Executing The Job OnSite On A Written Application WithRelevant Particulars Of The Staff AndVehicles Of TheContractor Dewa Will Issue TemporaryEntry Passes For Them Valid Up To ThePeriod Of Contract Work The ContractorShall Apply ForThe Entry Passes For The Entire Duration Of The Contract 3 Days In Advance With AXerox Copy Of Passport With A Valid Visa 2PasspoRt Size Photographs And IdentificationCard Issued By The Company For Each Staff Additionally With A Copy Of The DrivingLicense FOr The Drivers And A Copy Of ValidRegistration Certificate For The Vehicles No Staff Or Vehicles Of The ContractorWill Be PermiTted To Stay In Dewa Premises After TheClosing Of Work Of The Day ContactPerson For Site Visits 1 Mr Arif0551961349 2 Mr Thomas 05030247892 Item 00001 Sewage Treatment Plant Mbr Tse Plant 400M3 Day At Dewa Japs BachelorAccommodation Building 1 Job3 Item 00001 Sewage Treatment Plant 700 M3 Day At DewaJaps Family Accommodation Building 1 Job4 Item 00001 Sewage Treatment Plant GreywaterTreatment Plant At Offices Building Accommodation For Distribution Division AtRuwaiyah 1 Job 1 JobStandard Terms Conditions1 Prices Should Be Ddp Delivery Duty Paid At Dewa Stores 2 Quotation To Be Submitted Only In Local Currency U A E Dirhams3 Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material4 No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company And Your Participation In Dewa Tenders Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.