Tenders Are Invited For Design And Execution Of The Works Related To The Investment Objective Electrification And Rehabilitation Of The Railway Line Cluj Napoca Oradea Episcopate Bihor Lot 3 Poieni Aled And Lot 4 Aled Border Hungary

Tender Detail

48925628
2022 S 041 107474
Self Funded
Tenders Are Invited For Design And Execution Of The Works Related To The Investment Objective Electrification And Rehabilitation Of The Railway Line Cluj Napoca Oradea Episcopate Bihor Lot 3 Poieni Aled And Lot 4 Aled Border Hungary
ICB
Eastern Europe
Balkans,European Union
04-04-2022

Work Detail

Additional Information Design And Execution Of The Works Related To The Investment Objective Electrification And Rehabilitation Of The Railway Line Cluj Napoca Oradea Episcopate Bihor Lot 3 Poieni Aled And Lot 4 Aled Border HungaryRailway Construction WorksShort Description Any Clarification Request Must Be Transmitted In Seap Http Www E Licitatie Ro Pub Any Interested Economic Operator Has The Right To Request Further Clarifications Information On Awarding Documentation 22 Days Before The Deadline Set For The Submission Of Bids The Contracting Entity Will Clearly And Completely Meet All Requests For Clarification Additional Information In Connection With The Awarding Documentation On The 12Th Day Before The Deadlines The Contracting Entity Will Not Respond To The Clarification Requests Submitted After The Established Deadline Works Related To The Investment Objective Electrification And Rehabilitation Of The Railway Line Cluj Napoca Oradea Bihor Episcopate Consist Of The Design And Execution Of The Works In Accordance With The Legislation And Technical Regulations In Force Railway Line Cluj Napoca Oradea Bihor Bishopric Hungary Border Has A Total Length Of 166 216 Km Being Between Km 500 522 Head Signal Cf Cluj Napoca And Km 660 852 Head Signal Cf Station Episcopate Bihor Which Adds Bihor Frontier Hungary With A Length Of 5 983 Km Between Km 1 117 Cap Y Bishopric Station Bihor And Km 7 100 Hungarian Border In View Of The Value Of The Investment Objective Electrification And Rehabilitation Of The Railway Line Cluj Napoca Oradea Bihor Episcopate The Design And Execution Of The Works Is Made On 4 Four Lots Geographically Delimited Respectively Lot 1 Cluj Napoca Aghire Lot 2 Aghire Poieni Lot 3 Poieni Aled Lot 4 Aled Frontier Hungary The Projected Rail Route Generally Took Place On The Existing Cf Line With The Exception Of Linings Composed Of Alignments And Curves That Do Not Provide Withdrawal With The Parameters Allowing Passenger Trains At A Speed Of 160 Km H The Main Objectives Envisaged Through The Realization Of The Project Electrification And Rehabilitation Of The Railway Line Cluj Napoca Oradea Bishopy Bihor Lot 3 Poieni Aled And Lot 4 Aled Border Hungary Improving The Infrastructure For Increasing The Speed Of Traffic At The Rates Between The Speed Of 120 Km H And 160 Km H On The Entire Section Making Upgrading Electrification Installations Across The Length Of The Section 25 Kv Increase Transit Capacity Ensuring Interoperability Through The Implementation Of The Tsi Especially In Terms Of Axle Load 22 5 T The Loading Gauge C The Length Of The Stations In The Stations And Movements Facilities For People With Disabilities Modernization Of Stations By Stations Understanding Movements On This Line By Improving The Conditions For Rail Transport Users Bridge Replacement Flooring Drainage System Repair Equipment Improvement Construction Of Maintenance Roads Along The Railway Where Public Roads Are Not Available Rehabilitation Upgrading Of Passenger Stations Buildings Including The Construction Of Pedestrians And Or Pedestrian Tunnels Raising The Platforms In Accordance With European Standards In Force Mounting Soundabsorbent Panels And Or Alternate Noise Reduction Solutions New Electronic Centralization Installations In Stations And Entry Ertms Etcs Level 2 Gsm R Modernization Of Telecommunication Equipment Suspension Clause The Award Procedure Takes Place Under This Suspension Clause In The Sense That The Signing Of The Design And Execution Contract Will Be Made Only After The Financing Source It Is Estimated That The Period During Which The Suspension Clause Applies Is 12 Months After Approval Of The Procedure Report Deadline For Submission 20220404 15 00Type Of Buyer Utilities EntityType Of Contract WorksType Of Procedure Open ProcedureRegulation European Union With Participation By Gpa CountriesType Of Bid Submission For All LotsAward Criteria The Most Economic Tender Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail