I General Requirements A Conventional Grass Seeding Shall Be Used On Any Area To Be Grassed And Shall Not Be Performed When Wind Conditions Will Not Allow For Even And Thorough Application B Contractor Shall Supply Grading Of Soil Bed General Cleanup Of Work Site After Completion Of Work And All Things Necessary To Complete The Application C Construction And Site Preparation Ground Preparation Except As Modified For Slopes Steeper Than 3 1 The Ground Shall Be Prepared By Plowing And Disking To A Depth Of Not Less Than Four 4 Inches But Not More Than Six 6 Inches The Areas Shall Be Thoroughly Disked Until Pulverized To The Depth Specified Except Those Sloped Areas Steeper Than 3 1 Which Shall Not Be Disked All Large Clods Boulders And Or Rocks Stumps Large Roots And Other Foreign Particles That Will Interfere With The Work Or Future Maintenance Shall Be Removed By The Contractor At No Additional Cost To The County Review And Inspection Of The Area Will Be Performed By Landfill Staff Prior To Seed Application D Application Of Lime And Fertilizer Is Required Between September 1St Through December 31St 1 Lime Shall Be Uniformly Spread On The Surface Of The Ground At The Minimum Rate Of 800 Lbs Per Acre For The 1St Planting And 400 Lbs Per Acre After That 2 Fertilizer 10 10 10 Or Better Shall Be Spread Uniformly Once A Year Late Fall Or Early Spring Over The Ground Surface At A Minimum Of 300 Lbs Per Acre 3 Mixing The Lime And Fertilizer Shall Be Uniformly Mixed Into The Top 4 Inches Of Soil By Suitable Harrows Rotary Tillers Or Other Equipment Satisfactory To The Site Personnel Before Any More Work Is Performed By The Contractor
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.