Equipment Package 2 Baggage Handling System Ep 2 Bhs Sint Maarten Airport Terminal Reconstruction ProjectThe Ep 2 Baggage Handling System Bhs Which Package Includes But Are Not Limited To The Following Items Outbound Bhs Inbound Bhs And Recheck Transfer Bhs The Ep 2 Supplier Will Be Responsible For The Design Fabrication Shipping Unloading Installation Testing And Commissioning Of All The Components As Per The Scope Of Work The General Contractor Gc For Package 2 Will Be Responsible For Coordinating And Installing Utilities And Network Infrastructure To The Bhs Connection Points
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.