Reconstruction Of Three Floodways 3 455M Construction Of One Flood Drainage Pipeline 1 138M Lushan Earthquake Reconstruction And Risk Reduction ProjectMajor Activities Road And Flood Discharge Works Reconstruction Of The Existing Flood Discharge Channel No 1 No 2 And No 3 With A Total Length Of 3 349 3M Construction Of Flood Discharge Pipeline No 1 With A Total Length Of 1 125 4M Construction Of Roads On Top Of The Channels And Pipeline I E Auxiliary Road On Flood Discharge Pipeline No 1 Auxiliary Road On Flood Discharge Channel No 1 Auxiliary Road On Flood Discharge Channel No 2 Auxiliary Road On Flood Discharge Channel No 3 With A Total Length Of 3 409 404M And Their Auxiliary Works Including Drainage Network Lighting Traffic Safety And Management Facility For These 4 Roads And Power Communication Cable Trenches And Greening Works For Auxiliary Road On Flood Discharge Pipeline No 1 And Auxiliary Road On Flood Discharge Channel No 2 Construction Of Auxiliary Road For The Emergency Shelter And Its Auxiliary Works Including Drainage Network Lighting Traffic Safety And Management Facility Which Is 725 734M Long In Total And 12M Wide Construction Period Months 17
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.