Contract Notice Vissoie Hydroelectric Power Plant Rgv Cooling System Lot 6Hydraulic TurbinesShort Description The Vissoie Plant Is Powered By The Mottec Compensation Basin The Project Of Rehabilitation Of The Vissoie Hydroelectric Plant Provides For The Replacement Of Existing Groups And The Existing Distributor With Three New Groups With A Power Of 24 Mva The Cooling System Is Replaced By Three New Closed Circuit Cooling Systems The Tender Concerns Engineering Manufacturing Transportation Assembly And Commissioning Of The Three Cooling Systems Deadline For Submission 20211104 17 00Type Of Buyer Utilities EntityType Of Contract SuppliesType Of Procedure Open ProcedureRegulation GpaType Of Bid Submission For All LotsAward Criteria The Most Economic Tender Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.