General Procurement Notice for Ruzizi Iii Hydroelectric Power Project

Tender Detail

42780933
African Development Bank AfDB
General Procurement Notice for Ruzizi Iii Hydroelectric Power Project
ICB
You can view only after subscription.
Central Africa
Common Market for Eastern and Southern Africa, COMESA,African Union
05-08-2022

Work Detail

Ruzizi Iii Hydroelectric Power ProjectThe Project Will Include The Design Construction Commissioning Testing Operation And Maintenance Of I A Hydroelectric Power Production Facility With An Installed Capacity Of 206 Mw Comprising Of A 45M High Embankment Dam With Associated Spillway Low Level Outlet And Eco Flow Powerhouse A 3 8 Km Long 6 7M Diameter Concrete Lined Headrace Tunnel From The Dam Reservoir To The Powerhouse Penstock And Unit Penstocks Power Station Comprising Three Francis Generating Units Access Roads From Bugarama Rwanda And Kamanyola Drc To The Dam Site And All Ancillary And Related Works The Facility And Ii A 8 3 Km Long 220 Kv Double Critical Transmission Line To Evacuate The Electricity From The Facility To The Regional Dispatch Station In Kamanyola Drc The Transmission Line

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail