Construction begins at the point of connection to the road I 54 and the end of the section is at the end of the urban area at the sign the end of the village Vlko The length of the reconstructed section is 846 m According to the diagnostics it is necessary to mill the existing surface in the thickness of the thickness 50 mm then cold recycling will be performed Subsequently a layer of asphalt concrete will be laid for ACL 16 bedding layers in thickness 60 mm and finally the road surface will be reinforced by laying asphalt concrete for abrasive layers ACO 11 in thickness 40 mm
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.