Drainage Of Dank Street And Its SurroundingsRainwater Coming From K z phegy Utca Is Drained In An Open Canal To The Paved Part Of Alma Utca From There An Abe Battery Ditch System With A Cover Transports Rainwater Through Dank Street To Beniczky Street There The Existing Ditch Will Be Renovated Which Will Reach Bodza Street Through The Existing 1 0 X 1 0 M Frame Crossing Crossing The Traffic Road In Bodza Street Rainwater Enters The Receiver The Dera Stream Through A 60 Sized Closed Channel Oil Separator And Horde Separator
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.