Procurement Plan For Plan To Select The Contractor Stage To Design The Construction Drawing Drawing Project Renovating And Raising The Capacity Of Tuy Hoa City Water Supply Pipeline Network
Procurement Plan For Plan To Select The Contractor Stage To Design The Construction Drawing Drawing Project Renovating And Raising The Capacity Of Tuy Hoa City Water Supply Pipeline Network
Asia-Pacific Economic Cooperation, APEC,Association of Southeast Asian Nations, ASEAN
12-10-2021
Work Detail
Procurement Plan For Plan To Select The Contractor Stage To Design The Construction Drawing Drawing Project Renovating And Raising The Capacity Of Tuy Hoa City Water Supply Pipeline NetworkDate Approval 12 07 2021Package 1Type ConsultancyName Package No 03Tv Consulting On Setting Up Hsmt And Evaluating Hsdt Package Bvtc Design ConsultancyPrice 16 749 266Package 2Type ConsultancyName Package No 04Tv Construction Survey Consultancy To Serve Construction Drawing DesignPrice 419 460 474Package 3Type ConsultancyName Bidding Package Number 05Tv Construction Survey Monitoring ConsultancyPrice 17 080 431Package 4Type ConsultancyName Package No 06Tv Consultation On Designing Construction Drawings And Total Cost EstimatesPrice 2 514 904 779Package 5Type ConsultancyName Package No 07Tv Consultant To Verify Construction Drawing Design And Total Cost EstimatePrice 227 685 508 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.