Asia-Pacific Economic Cooperation, APEC,Association of Southeast Asian Nations, ASEAN
23-07-2021
Work Detail
Supply And Installation Of Equipment Construction And Commisioning Of Kim Xa Pump Station And AuxillariesVinh Phuc Flood Risk And Water Management ProjectConstructing Kim Xa Drainage Pumping Station With A Flow Q 30 M3 S Including 06 Vertical Sharp Pump Groups Each Pumping Group With A Flow Q 5 0 M3 S Dredging Nhi Hoang Lake With An Area Of 38 5 Ha Of Which 10 7 Ha Will Be Dredged To The Elevation 8 7M Construction Of Discharge Culverts Across Pho Day River Dyke Dimension Of Sluice N B H 3 3 0 2 5 M Length Of Culvert Body Is 64M The Culvert Bottom Elevation Is 11 20M And The Discharge Canal Behind The Sluice Under Dyke Canal Bottom Width 10M Bottom Elevation Of Sluice Crossing Dyke 9 0M Repair Of 10 Gate Sluice At K11 369 On Phan River
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.