Tenders are invited for Construction Of Wastewater Collection And Treatment System Of Towns Tho Tang Tam Hong Yen Lac 03 Lot Lot Cw08 1 Lot Cw08 2 Lot Cw08 3

Tender Detail

41556114
CW08
International Bank for Reconstruction and Development IBRD
Tenders are invited for Construction Of Wastewater Collection And Treatment System Of Towns Tho Tang Tam Hong Yen Lac 03 Lot Lot Cw08 1 Lot Cw08 2 Lot Cw08 3
ICB
South-Eastern Asia
Asia-Pacific Economic Cooperation, APEC,Association of Southeast Asian Nations, ASEAN
22-07-2021

Work Detail

Construction Of Wastewater Collection And Treatment System Of Towns Tho Tang Tam Hong Yen Lac 03 Lot Lot Cw08 1 Lot Cw08 2 Lot Cw08 3Vinh Phuc Flood Risk And Water Management ProjectThe Package Is Grouped Into Three 03 Lots With Construction Period Is 18 Months As Follows Lot 1 Cw08 1 Construction Of Wastewater Collection And Treatment System For Tho Tang Town Includes Hdpe Interceptor Sewer With D315 Minimum Burial Depth Of 0 7M Total Design Volume Of 803M Hdpe Pressure Sewer With D225mm Minimum Burial Depth From 0 7 To 1 0M Total Design Volume Of 2010M Common Sewers Are Designed As Knitted Ditches Using Reinforced Concrete Material Dimension B600 Total Design Volume Of 15M Manholes And Cso Construction Of 06 Lifted Pump Stations With Total Capacity Of 575M3 H Construction Of Wastewater Treatment Station Using Improved Oxidation Ditch Technology With Capacity Of 2 000M3 Per Day Lot 2 Cw08 2 Construction Of Wastewater Collection And Treatment System For Yen Lac Town Includes Hdpe Interceptor Sewer With D315 Minimum Burial Depth Of 0 7M Total Design Volume Of 180M Hdpe Pressure Sewer From D160 To D315mm Minimum Burial Depth From 0 7 To 1 0M Total Design Volume Of 3597M Common Sewers Are Designed As Knitted Ditches Using Reinforced Concrete Material Dimension From B800 To B1200mm Total Design Volume Of 1204M Manholes And Cso Construction Of 06 Lifted Pump Stations With Total Capacity Of 1222M3 H Construction Of Wastewater Treatment Station Using Improved Oxidation Ditch Technology With Capacity Of 2 500M3 Per Day Lot 3 Cw08 3 Construction Of Wastewater Collection And Treatment System For Tho Tang Town Includes Hdpe Interceptor Sewer With D315 Minimum Burial Depth Of 0 7M Total Design Volume Of 1 639M Hdpe Pressure Sewer From D160 To D315mm Minimum Burial Depth From 0 7 To 1 0M Total Design Volume Of 2 688M Common Sewers Are Designed As Knitted Ditches Using Reinforced Concrete Material Dimension From B800 To B1500mm And Box Culverts With Bxh From 1200X1200 To 1200X1500 Total Design Volume Of 3 291M Manholes And Cso Construction Of 04 Lifted Pump Stations With Total Capacity Of 853M3 H Construction Of Wastewater Treatment Station Using Improved Oxidation Ditch Technology With Capacity Of 2 500M3 Per Day

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail