Tenders are invited for Gratings Fabrication and Replacement Work

Tender Detail

41461496
2332101384
Self Funded
Tenders are invited for Gratings Fabrication and Replacement Work
ICB
Western Asia
Arab World,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
23-06-2021

Work Detail

Quotation are invited for Gratings Fabrication and Replacement Work G Station Bpst 15 25 Gratings 1032101907rfx Description G Station BPST 15 25 Gratings Replacement Work1 ITEM 00001 BPST 15 GRATINGS FABRICATION ANDREPLACEMENT WORK WORK BPST 15 GRATINGFABRICATION AND REPLACEMENT WORKINCLUDING MATERIAL SCOPE OF WORK BY THE VENDOR 1 MOBILIZATION ANDDEMOBILIZATION OF WORKFORCE MATERIAL ANDTOOLS 2 FABRICATION AND REPLACEMENT OFGRATINGS OF VENT VALVE AREA SILENCER AREA ANDSTAIRCASES APPROXIMATELY TOTAL AREA IS 87M2 GRATING HEIGHT 35 MM 3 ALL SIZES SHAPESWILL BE AS PER SITE CONDITION 4 LOCKS ANDSUPPORT SHALL BE AS PER SITE CONDITION 5 GRATING MATERIAL WILL BE GALVANIZED STEEL 6 PAINTING AS PER SITE COLOR AND SEA WEATHERRESISTIVE 7 ALL MATERIALS AND CONSUMABLETO COMPLETE THE WORK 8 WORK NEED TO DOSTEP BYSTEP SO THAT NORMAL MOVEMENT WILL NOT BERESTRICTED 9 ANY WORK NOT MENTIONED HEREBUT REQUIRED TO COMPLETE THE MAIN WORK 10 HOUS 1 G01EKEEPING EVERY DAY AND FINAL VENDOR SGENERAL RESPONSIBILITY AND LIABILITIES 1 CONTRACTOR SHALL PROVIDE SUPERVISORY SKILLED SEMI SKILLED UNSKILLED WORK FORCE 2 ONESUPERVISOR SHOULD BE AT SITE DURING THEWORK 3 ALL KIND OF TOOLS EQUIPMENT ELECTRODES CONSUMABLES ETC REQUIRED TO COMPLETE THEJOB 4 CONTRACTOR SHALL PROVIDE ALLPERSONAL PROTECTIVE EQUIPMENT FIRST AIDKIT COVID 19 PRECAUTION KIT ETC AND THESE ITEMS SHALLBE AVAILABLE AT SITE DURING THE COURSE OFWORKS 5 COMPLY WITH COVID 19 PRECAUTIONPLAN5 CONTRACTOR HAS TO COMPLETE ALL THEACTIVITIES WITHIN THE SCHEDULE PROVIDED BYDEWA FOR THIS THEY MAY NEED TO INCREASETHEIR WORK FORCE OR ROUND THE CLOCK WORK 7 WORKWILL BE CARRIED OUT AS PER DEWA SCHEDULE IT MAY REQUIRE TO FOLLOW DIFFERENTSCHEDULE TO COMPLETE THE WORK 8 CONTRACTOR SHALLFOLLOW THE DEWA SAFETY POLICY 9 IF ANYINSTRUMENT EQUIPMENT OR DEVICE DAMAGEDURING THE WORKCONTRACTOR SHALL REPLACE REPAIR THE UNITIN THEIR OWN COST 10 DAILY PROGRESS REVIEWMEETING ALONG WITH DEWA 11 UPONCOMPLETION OF ALL WORKS A FORMAL WORK COMPLETIONREPORT SHALL BE SUBMITTED MANDATORY FORBIDDING SITE VISIT THE PROSPECTIVE BIDDERSMAY VISIT THE SITE TO FULLY UNDERSTAND THE SITECONDITIONS JOB SCOPE JOB COMPLEXITIES ANDEXTENT OF THE WORK PRIOR TO SUBMISSION OFTHEIRBIDS SUBMISSION OF BIDS SHALL BE DEEMED TOHAVE CONSIDERED THE ABOVE SCOPE OF DEWA 1 FORKLIFT AND CRANE FOR ONSITE LOADINGAND UNLOADING 2 ENTRY PERMIT FOR THE WORKTEAM 3 WORK PERMIT 4 SCAFFOLDING WORK5 WATER ELECTRICITY FROM ONE SOURCE ASPER SITE AVAILABILITY PAYMENT PAYMENT WILL BE DONEASPER ACTUAL WORK WARRANTY 1 THEWARRANTY PERIOD FOR THE WORKS SHALL BEONE YEAR FROM THE DATE OF COMPLETION OF THE WORK 2 INCASE OF ANY DAMAGE DEFECT OF THE WORKCARRIED OUT UNDER THIS CONTRACT WITHINTHIS WARRANTY PERIOD THE CONTRACTOR SHALL ATTEND ANDCARRY OUT THE NECESSARY REPAIR REPLACEMENT WORK AND MAKE GOOD THEDEFECT WITHIN SHORTEST PERIOD THE CONTRACTOR WILL PROVIDE24 HOUR EMERGENCY NUMBER AND WILLENDEAVOR TO BE ONSITE WITHIN 24 HOURS OFWRITTEN PHONE REQUEST BY DEWA 2 ITEM 00001 BPST 25 GRATINGS FABRICATION ANDREPLACEMENT WORK WORK BPST 25 GRATINGFABRICATION AND REPLACEMENT WORKINCLUDING MATERIAL SCOPE OF WORK BY THE VENDOR 1 MOBILIZATION ANDDEMOBILIZATION OF WORKFORCE MATERIAL ANDTOOLS 2 FABRICATION AND REPLACEMENT OFGRATINGS OF VENT VALVE AREA SILENCER AREA ANDSTAIRCASES APPROXIMATELY TOTAL AREA IS 87M2 GRATING HEIGHT 35 MM 3 ALL SIZES SHAPESWILL BE AS PER SITE CONDITION 4 LOCKS ANDSUPPORT SHALL BE AS PER SITE CONDITION 5 GRATING MATERIAL WILL BE GALVANIZED STEEL 6 PAINTING AS PER SITE COLOR AND SEA WEATHERRESISTIVE 7 ALL MATERIALS AND CONSUMABLETO COMPLETE THE WORK 8 WORK NEED TO DOSTEP BYSTEP SO THAT NORMAL MOVEMENT WILL NOT BERESTRICTED 9 ANY WORK NOT MENTIONED HEREBUT REQUIRED TO COMPLETE THE MAIN WORK 10 HOUSEKEEPING EVERY DAY AND FINAL VENDOR SGENERAL RESPONSIBILITY AND LIABILITIES 1 CONTRACTOR SHALL PROVIDE SUPERVISORY SKILLED SEMI SKILLED UNSKILLED WORK FORCE 2 ONESUPERVISOR SHOULD BE AT SITE DURING THEWORK 3 ALL KIND OF TOOLS EQUIPMENT ELECTRODES CONSUMABLES ETC REQUIRED TO COMPLETE THEJOB 4 CONTRACTOR SHALL PROVIDE ALLPERSONAL PROTECTIVE EQUIPMENT FIRST AIDKIT COVID 19 PRECAUTION KIT ETC AND THESE ITEMS SHALLBE AVAILABLE AT SITE DURING THE COURSE OFWORKS 5 COMPLY WITH COVID 19 PRECAUTIONPLAN5 CONTRACTOR HAS TO COMPLETE ALL THEACTIVITIES WITHIN THE SCHEDULE PROVIDED BYDEWA FOR THIS THEY MAY NEED TO INCREASETHEIR WORK FORCE OR ROUND THE CLOCK WORK 7 WORKWILL BE CARRIED OUT AS PER DEWA SCHEDULE IT MAY REQUIRE TO FOLLOW DIFFERENTSCHEDULE TO COMPLETE THE WORK 8 CONTRACTOR SHALLFOLLOW THE DEWA SAFETY POLICY 9 IF ANYINSTRUMENT EQUIPMENT OR DEVICE DAMAGEDURING THE WORKCONTRACTOR SHALL REPLACE REPAIR THE UNITIN THEIR OWN COST 10 DAILY PROGRESS REVIEWMEETING ALONG WITH DEWA 11 UPONCOMPLETION OF ALL WORKS A FORMAL WORK COMPLETIONREPORT SHALL BE SUBMITTED MANDATORY FORBIDDING SITE VISIT THE PROSPECTIVE BIDDERSMAY VISIT THE SITE TO FULLY UNDERSTAND THE SITECONDITIONS JOB SCOPE JOB COMPLEXITIES ANDEXTENT OF THE WORK PRIOR TO SUBMISSION OFTHEIRBIDS SUBMISSION OF BIDS SHALL BE DEEMED TOHAVE CONSIDERED THE ABOVE SCOPE OF DEWA 1 FORKLIFT AND CRANE FOR ONSITE LOADINGAND UNLOADING 2 ENTRY PERMIT FOR THE WORKTEAM 3 WORK PERMIT 4 SCAFFOLDING WORK5 WATER ELECTRICITY FROM ONE SOURCE ASPER SITE AVAILABILITY PAYMENT PAYMENT WILL BE DONEASPER ACTUAL WORK WARRANTY 1 THE WARRANTY PERIOD FOR THE WORKS SHALL BEONE YEAR FROM THE DATE OF COMPLETION OF THE WORK 2 INCASE OF ANY DAMAGE DEFECT OF THE WORKCARRIED OUT UNDER THIS CONTRACT WITHINTHIS WARRANTY PERIOD THE CONTRACTOR SHALL ATTEND ANDCARRY OUT THE NECESSARY REPAIR REPLACEMENT WORK AND MAKE GOOD THEDEFECT WITHIN SHORTEST PERIOD THE CONTRACTOR WILL PROVIDE24 HOUR EMERGENCY NUMBER AND WILLENDEAVOR TO BE ONSITE WITHIN 24 HOURS OFWRITTEN PHONE REQUEST BY DEWA CONTACT FOR TECHNICALCLARIFICATION PLEASE CONTACTEZAZ 0503493353 0555090835 CALL WHATSAPP EMAIL MD E DEWA GOV AE MR A RAZZAK 0555567949 MR NAJEEB 0502838591 MD EZAZUL HAQUE KHAN SRENGINEER G MST JAPS DEWA 1 G01STANDARD TERMS CONDITIONS1 Prices should be DDP delivery duty paid at DEWA stores 2 Quotation to be submitted only in local currency U A E Dirhams3 DEWA Standard payment terms is 30 days credit from the date of acceptance of material4 No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company and your participation in DEWA tenders RFQs should not constitute a Conflict or perceived Conflict of Interest

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail