Development of a detailed design and estimate documentation for construction works by sewerage system Bukhara region water supply and sewerage project Phase 1 Consulting services include the development of a detailed sewerage project reconstruction and construction of new sewerage treatment facilities STF sewerage pumping stations SPS and sewerage networks in the regional centers of Gijduvan Ramitan Karakul Alat and Karaulbazar district of Bukhara region The Consultant will report to the Project Coordination Group PCG assist in revising the technical approach at the detailed design stage checking the quality of technical solutions fit for purpose and preparing the detailed project The Consultants Terms of Reference contains all the information about the consultants responsibilities The purpose of the consulting services is 1 Consider the feasibility study and validate the proposed solutions 2 Carry out all topographic geotechnical and other surveys 3 Determine the length and dimensions of pipes and connections to be built 4 Develop detailed designs and draw up sketches for the entire infrastructure with a view to further inclusion in construction contracts based on FIDIC conditions 5 Prepare Specifications and estimates for inclusion in the Procurement Documents for the selection of the Contractor Supplier
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.