Expression of Interest for Econsult Maldives Power System Expansion Analysis To Support Clean Energy Development Strategies Towards Net Zero In Maldives

Tender Detail

40727411
1274745
The World Bank Group
Expression of Interest for Econsult Maldives Power System Expansion Analysis To Support Clean Energy Development Strategies Towards Net Zero In Maldives
ICB
Southern Asia
South Asian Association for Regional Cooperation (SAARC)
24-06-2021

Work Detail

Econsult Maldives Power System Expansion Analysis To Support Clean Energy Development Strategies Towards Net Zero In MaldivesThe Main Objective Of The Proposed Consultancy Work Is Divided Into Three Main Objectives As Follows 1 Power Sector Analysis For Vre And Ev Integration In Maldives The Objective Of This Component Is To Formulate Least Cost Scenarios For The Expansion Of The Maldives Power System And Explore Different Development Strategies To Support The Clients Energy Transition Towards Net Zero Carbon Targets These Informative Scenarios Would Be Proposed For The Following Key Island Systems Greater Male Region Male Hulhumale Thilafushi Gulhi Falhu And Addu This Activity Aims To Inform The World Bank Of How Best The Power System Could Be Developed Including Generation And Infrastructure Requirements Solar Pv Bess Thermal Generation Etc To Meet The Projected Demand Considering Inter Alia Introduction Of Evs In Maldives The Study Would Involve Power System Optimization Analyses In Order To Inform Several Scenarios Including A Least Cost Scenario To Expand The Thermal Solar Pv Bess Evs And Other Generation Technologies Over The Study Horizon Up To 2040 Including Exploring Deep Decarbonization Pathways And Generation Technologies To Support This Transition Economic Re Capacity Options Including Roof Top Solar Pv Floating Solar Pv And Other Re Technologies That Can Be Added To The System Within The Study Horizon Creating Scenarios On Impact Of Ev On System Load Bess Investment Requirements To Go With Pv Ev Integration Investment Requirements On Power Infrastructure Such As Transformer Capacity AdditionAnd Upgrade Requirements To The Feeder Capacity And Optimal Dispatch Strategies For The Different Scenarios In Addition To Identifying The Investment Needs The Study Will Also Indicate The Infrastructure Requirements Hardware And Software Requirements To Support The Least Cost Generation Expansion Development Strategy This Will Include The Need For Smart Metering And Operational Strategies That The Island System Operators Will Need To Run The System Economically And Securely This Assessment Includes The Following But Not Limited To

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail