Tenders are invited for The Reconstruction Of Airport Terminal Building

Tender Detail

38549173
SX PJIAE 196708 CW RFB
The World Bank Group
Tenders are invited for The Reconstruction Of Airport Terminal Building
ICB
You can view only after subscription.
All Region
23-03-2021

Work Detail

The Reconstruction Of Airport Terminal BuildingSint Maarten Airport Terminal Reconstruction ProjectThe Princess Juliana International Airport Operating Company N V Pjiae Now Invites Sealed Bids From Eligible Bidders For The Package 2 Reconstruction Of The Terminal Building Which Package Includes But Are Not Limited To The Following Work Items A Dismantling Demolition Works Dismantling And Removal Of Existing Damaged Interior Elements B Architectural Interior Works Replacement Of All Architectural Elements Such As Partitions Ceilings Doors Millwork New Floor Tiling Terrazzo Ceramic And Other Types Repair Replacement Of Exterior Interior Fa ade Structure Such As Metal Wall Panels Curtain Wall Glazing Installation Of Four New Entrance Vestibules C Structural Works New Internal Steel Structure For Floor Extension At Level 2 With Modifications To The Existing Steel Structure On Level 1 New Steel Structure And Concrete Foundations For Four New Entrance Vestibules Providing Openings In Concrete Floors For The Installation Of Three Additional Escalators And One New Elevator Including Piling At Level 0 D Mechanical And Plumbing Works Replacement Of Ten Elevators And Two Escalators Provision Of One New Elevator And Three Additional Escalators From Level 1 To Level 0 Repair Replacement Of Parts Of The Hvac System Repair Replacement Of Domestic Water Mains And Sewer Lines Replacement Of All Restrooms Fixtures E Electrical Works All New Secondary Electrical Wiring All New Lighting Fixtures Led Including Time Moving Sensors Existing Main And Secondary Electrical Distribution Panels To Remain With Few Repairs Replacement Of Secondary Panels Provision Of One Additional Generator In The Power House F It And Audio Visual Systems Replacement Of Wired And Wireless Networks Pa And Cctv Systems G Life Safety Systems Repair Replacement Of Fire Detection Suppression And Fire Alarm Systems H Wayfinding New Passenger Wayfinding Signage I Civil Works External Replacement Of Pedestrian Sidewalk Tiling Around Terminal Building J Coordination Of And Assistance To Other Contract Works Arranged By Borrower Consisting Of Eight Equipment Packages Eps Ep 1 Passenger Boarding Bridges New Four Fixed Walkway And Apron Drive Bridges Ep 2 Baggage Handling System New Equipment For Inbound And Outbound Integrated Conveyor Belt Systems Ep 3 Security Screening Equipment New X Ray Machines And Related Equipment Ep 4 Self Serve Bag Drop System Ep 5 Digital Signage Equipment Ep 6 Hold Room Seating Powered Ep 7 Furnishing Fixtures And Appliances Ep 8 Automated Border Control Equipment For Immigration And Emigration K Phasing Of The Works As Only A Part Of The Terminal Building Is In Operation The Works Will Have To Be Executed In Various Construction Phases Operational Area Is At Level 0 And Covers Approximately 70 Of The Floor Space Ca 8 600 M2 Total Building Floor Space Is Approximately 30 000 M2 Construction Period Is 22 Months Including Mobilisation

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail