Tenders Are Invited For Hp Lp 2 Pcv Pr Tube And Outlet Pipe Replacement

Tender Detail

38517676
2332100592
Self Funded
Tenders Are Invited For Hp Lp 2 Pcv Pr Tube And Outlet Pipe Replacement
ICB
Western Asia
Arab World,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
21-03-2021

Work Detail

Quotation Are Invited For Hp Lp 2 Pcv Pr Tube And Outlet Pipe Replacement Technical And General Specifications Outsourcing Work L Station Phase I Jebel Ali Name Of Work Scope Of Work For Hp Lp 2 Pcv Pr Tube And Outlet Replacement Including Oem Supervision Valve Inlet Size Dn22 Outlet Dn 60 Wo 510671377 Period Of Work 5 D Ays During Total Shut Down Of L 1 Station Tentative Date From 01 01 2022 To 05 01 2022 Scope Of Work The Contractor Shall Visi T The Site And Make Himself Fully Familiar With The Work Scope Plant Access Facilities Complexities Safety Measures No Of Welds Etc Before He Submit His Bid Party Shall Arrange The Oem And All The Work To Be Done In Presence Of Oem Only To Get A Ptw Hwp Contractor Has To Submit Risk Assessment Forms And Method Statement Prior To Start The Work Check Condition Suitable To Carry Out Work Conduct Site Survey And Safety Inspection To Assess The Working Environment A Safety Meeting Will Be Held To Evaluate The Risk Involved In Methods To Be Used Risk Assessment And Tool Box Talk To Be Given To The Employees Mobilize The Labor Equip Ment Tools Etc Immediately After Getting The Po Or Mail Confirmation From Dewa All Lifting And Power Tools Shall Be Tested And Test Certificate To Be Provided To Dewa Verify That Scaffolds Are Safe To Work Prepare And Provide The Welding Procedure Re Move The Insulation Cladding Sheets Prepare The Additional Support Lifting Arrangement To Hold The Pipeline At The Position And Cut The Existing Support If Required Cut The Existing Valve Outlet Pipe Size Dn 60 Thickness 12Mm Od 1524Mm Material A387 22 Cl 2 From Both Side Near The Control Valve And After Approximately 1 13 Meter Length As Shown In Drawing 1 Point A And B Cu The Va Lve From The Body As Shown In Drawing 1 Point C Cut The Pipe As Shown In Drawing 1 Point D Cut The Pipes As Shown In Drawing 1 Point E Cut An Dreplace The Pr Inner Middle And Outlet Tube With End Cover 5 1 5 2 5 3 5 4 As Shown In Drawing 1 Dew A Will Provide The New Pr Tubes End Cover Replace The Outlet Pipe Part Number 14 8 As Shown In Drawing 2 Dewa Will Provide Th E New Outlet Pipe And Contractor Shall Cut All The Connection Pipe And Replace Prepare The Ends Of New Out Let Pipe Shifting O F The New Outlet Pipe Pr Tubes Etc At The Location Final Alignment Should Be Checked By Contractor In Presence Of Oem And Dewa A Nd Start Tack Weld Re Fixing Of The Existing Support On New Spool Pipe Removal Of The Additional Support Extra Precaution Sh Ould Be Taken During Execution Of Job Not To Damage Any Other Nearby Equipment After Completion Of Above Scope Of Work Joint Ins Pection With Oem Dewa Engineer Install The Insulation Cladding Sheets Housekeeping And Disposal Of Waste From The Job To Be D One Before Site Clearance Inspection And Approval From Dewa Personnel De Mobilization And Site Clearance Previous Experience Po To Be Provided For The Same Type Of Job From Dewa Or Any Other Well Known Company Work Completion Report Full Repairing Re Ports Material Test Certificates Welding Consumable Material Test Certificates To Be Submitted To Dewa Warranty 12 Months For Weld Joints Which To Be Done By Contractor Dewa Scope Insulation Cladding Material Ndt And Heat Treatment For Weld Joints Scaffolding Electricity And Water Pr Tube Pr Inner Middle And Outlet Tube With End Cover 5 1 5 2 5 3 5 4 As Shown In Dra Wing 1 Outlet Pipe With Pipe Stem Leg Water Pipe Water Connecting Pipe Nozzle Stud Nozzle Stud Se Pos 14 8 14 20 14 21 1 4 25 14 28 14 29 As Shown In Drawing 2 Contractor Scope Of Material Supply Tools And Tackles Manpower Welding Heat Treatment Pr Ocedure Consumables For Welding Temporary Supports Oem During The Work For Supervision General Terms Conditions 1 The Contract Or Shall Visit The Site And Make Himself Fully Familiar With The Work Scope Plant Access Facilities Complexities Safety Measures Etc Before He Submit His Bid 2 The Contractor Shall Submit The Schedule Of Work And The Period For Work So That The Work Shall C Ome Well Within The Allotted Outage Period The Schedule Shall Be Approved By Dewa Before Commencement Of Work 3 The Contractor Sha Ll Ensure Housekeeping On A Daily Basis And The Contractor Shall Be Responsible For All Waste Material Disposals To Designated Place S As Per Dewa Environmental Policy Of Hazardous Waste Disposal 4 All Dewa Safety Environment Policy Rules And Regulation Shall Be Followed At Work Site During The Execution Of The Work The Contractor S Engineer Should Be Familiar With Safety Regulations Whil E Working In A Hazardous Area 5 The Work Shall Be Executed Under Dewa Supervision And As Per Quality Schedule Requirement Cont Ractor S Supervisor Shall Be Available At Site Throughout The Period Of Work 6 The Contractor Should Apply For The Permit To Work Well In Advance And This Request Shall Be Followed With Method Statement Risk Assessment As Attachments 7 Entry Permits For The St Aff Workers Should Be Applied With Passport Copies Having Valid Visa Persons Whose Names Are Not Available In The List Will Not Be Allowed To Enter The Powerhouse 8 The Contractor Upon Receiving The Work Permit Shall First Ensure A Safe Working Condition 9 Entry Permits For The Vehicle Should Be Applied With Copies Of Vehicle Registration 10 All The Persons Should Wear The Uniform Sa Fety Shoes And Helmet While At Work 11 All Material And Tools Brought In Shall Be Declared At Power Station Security Gate And The List Of These Items Shall Be Signed By Dewa Security The Copies Of These Documents Shall Be Lodged With Dewa Engineer In Charge On Daily Basis This Document Will Be The Basis For The Clearance Gate Pass To Take Them Out On Completion Of The Job 12 Toolbox Talks And Risk Assessments Should Be Given To The Workmen By Their Supervisor Before Start Of Work 13 Dewa Engineer In Charge Shal L Be Updated The Work Progress On A Regular Basis 14 Contractor Should Get Hot Work Permit From Dewa Engineer In Charge On Daily B Asis And Provide Tbt And Ra Accordingly 15 Party Should Comply The Sa 8000 Standard As Per Dewa Terms And Conditions Drawing 1 Drawing 2 Pr Tube Detail Qty 1Hp Lp 2 Pcv Pr Tube And Outlet Pipe Replacement Including Oem Supervision Valve Inlet Size Dn22 Outlet Dn 60 Wo 510671377Scope Of Work With Drawings AttachedStandard Terms Conditions1 Prices Should Be Ddp Delivery Duty Paid At Dewa Stores 2 Quotation To Be Submitted Only In Local Currency U A E Dirhams3 Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material4 No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company And Your Participation In Dewa Tenders Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail