Tenders Are Invited For Bpst Blled Steam Line Isolation Valve Replacement Work

Tender Detail

38488121
2332100549
Self Funded
Tenders Are Invited For Bpst Blled Steam Line Isolation Valve Replacement Work
ICB
Western Asia
Arab World,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
16-03-2021

Work Detail

Quotation Are Invited For Job1032100724 Gate Valve Replacementrfx Description Bpst Blled Steam Line Isolation Valve Replacement WorkValves Replacement Work ContractorScope Of Work 1 Contractor Shall VisitThe Site And Familiarize With SiteRequirements ConstrAints Before Quoting The Job 2 Contractor Upon Receiving The Ptw Ensure That The System Is Isolated And NoMore Steam Water IsInside The Line 3 If There Is AnyAbnormalities Found During The ExecutionOf The Job Immediately Stop The Job AndInform Dewa REpresentative 4 Remove The Defective Passing Valve After Marking The FlowDirection Valve Orientation And Any OtherNecessary DImensions 5 If Required Contractor ShallGive Temporary Support For The ExistingPiping In Order To Prevent Any Damage OfThe Same 6 Prepare The Surface Of The Pipe And IfRequired Contractor Shall Change ThePortion Of The Piping As Per Dewa Instruction 7 FIt Up The New Valve Without Changing TheAlignment And Orientation 8 DewaEngineer Will Inspect The Fit Up And GiveClearance ForWelding 9 Use Designated Electrodes AsPer The Valve And Piping Material Class 10 After Completion Of The Welding DewaEngineer Will Inspect The Joint For Any VisualImperfections 11 Dewa Will Carry Out NdtInspection Of The Welding Joints 12 Contractor SHall Dispose All The Metallic NonmetallicWaste Scrap In The Designated WasteSkips 13 Any Insulation Removal And ReFixing ReLated To Valve Replacement Shall Be UnderContractor Scope 14 Contractor Have ToMobilize Their Work Force Tools TacklesAnd ResOurces To The Site Within 48 Hrs NoticePeriod Work Completion Duration 05 Days During Plant Shutdown Quantity Size No Of ValveS Valve Size 150Nb 300 Bw A216 Wcb 2 Additional Requirements From Contractor 1 Contractor Upon Receiving Po ShallSubmitThe Welder Certificates Valid Wps Pqr Test Certificates CalibrationCertificates Of All The Power Tools AndTest Certificates OF Oxy Fuel Cutting Sets BeforeProceeding To Execute The Job 2 OnSuccessful Completion Of The Job Contractor Shall Submit JobCompletion Report With Details Of JobCarried Out And Photos 3 MinimumWarranty Of One Year Shall Provide FromThe Date Of Job ComPletion 4 In Case Of Any Damage Found InThe Welding Joints Within A Period Of OneYear From The Date Of Job Completion ContractoR Shall Rectify The Defect Without Anyadditional Costs Dewa Scope 1 Valves Pipe And Fittings 2 Electricity 3 Water4 ScaffoLding 5 Ndt 6 Insulation MaterialContractor Scope 1 Tools And Tackles2 Welding Consumables 3 It Is TheResponsibility Of The Contractor To Have His Own ArrangementIn Extending The Electricity And WaterUtility To His Places Of Work IncludingLighting GeNeral Terms Conditions The ContractorShall Visit The Site And Make Himself FullyFamiliar With The Work Scope Plant Access FAcilities Complexities Safety MeasuresEtc Before He Submits His Bid ContactorShall Submit Method Of Statement AndScheduleUpon Receipt Of Po The Contractor ShallEnsure Housekeeping On A Daily Basis AndThe Contractor Shall Be Responsible ForAll Waste Material Disposals To Designated Places All Dewa Safety Environment Policy Rules And Regulation Shall Be Followed AtWork SiTe During The Execution Of The Work TheContractor S Engineer Should Be FamiliarWith Safety Regulations While Working In AHazardoUs Area Scaffolding If Required Shall BeArranged By Dewa Crane If RequiredShall Be Arranged By Dewa All RiggingAnd TransPorting Equipment Should Be Arranged ByThe Contractor This Equipment Should BeDuly Tested And Certified By The 3Rd PartyInspectiOn Agency And The Certificates Should BeProduced On Demand Qualified Rigger Mechanics Should Be Provided The WorkShall Be ExeCuted Under Dewa Supervision And As PerQuality Schedule Requirement Contractor S Supervisor Shall Be Available At Site ThroughouT The Period Of Work Entry Permits ForThe Staff Workers Should Be Applied WithPassport Copies Having Valid Visa Persons Whose Names Are Not Available In The List WillNot Be Allowed To Enter The Powerhouse Entry Permits For The Vehicle Should BeApplied With Copies Of Vehicle Registration DewaWill Arrange Necessary Ptw Lc Hwp FromOperation Chemical Lab Fire DepartmentClEarances To Carry Out The Scope Of WorkUnder This Contract The ContractorUpon Receiving The Work Permit Shall FirstEnsure A SaFe Working Condition All The PersonsShould Wear All The Required Ppe While AtWork All Material And Tools Brought InShall Be Declared At Power Station Security GateAnd The List Of These Items Shall Be Signed By Dewa Security The Copies Of TheseDocuments Shall Be Lodged With Dewa EngineerIn Charge On Daily Basis This Document WillBe The Basis For The Clearance Gate Pass To TakeThem Out On Completion Of The Job Service Air Electricity And Water ForWork At Dewa Site It Is The ResponsibilityOf The ContRactor To Have His Own Arrangement InExtending The Electricity And Water UtilityTo His Places Of Work Including Lighting Standard Terms Conditions1 Prices Should Be Ddp Delivery Duty Paid At Dewa Stores 2 Quotation To Be Submitted Only In Local Currency U A E Dirhams3 Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material4 No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company And Your Participation In Dewa Tenders Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail