Y1da 561 19 120 Roofing Project

Tender Detail

37312535
36C24221B0019
Self Funded
Y1da 561 19 120 Roofing Project
ICB
Northern America
Asia-Pacific Economic Cooperation, APEC,G20
17-03-2021

Work Detail

Page 1 Of 3 This Notice Is For Solicitation Number 36C24221b0019 561 19 120 Roofing Project At The Va Nj Healthcare System East Orange Campus 385 Tremont Ave East Orange Nj 07018 This Shall Be A Service Disabled Veteran Owned Small Business Sdvosb Set Aside As A Result All Sdvosb s May Submit A Proposal Which Will Be Considered By The Agency This Project Is Classified Under Naics Code 238160 And Has A Size Standard Of 16 5 Million The Cost Estimate Range For This Project Is Between 2 000 000 And 5 000 000 Statement Of Work Sow 1 Contract Title Roofing Project Project No 561 19 120 Va Nj Hcs East Orange Campus 2 Background This Requirement Is Necessary To Replace Leaking Roofs In Buildings In The Va East Orange Campus Building 3 Scope Contractor Shall Completely Prepare Site For Building Operations Including Demolition And Removal Of Existing Roofing Materials And Furnish Labor And Materials And Perform Work For Re Roofing Of Select Buildings And Portions Of Select Buildings As Required By Drawings And Specifications At The Va Nj Health Care System East Orange Nj General Construction Work Includes General Construction Alterations Replacement And Necessary Removal Of Existing Roof Covering And Insulations Down To The Roof Deck Structures And Construction And Certain Other Items Roof Area Of Building 1 Will Also Require Removal And Replacement Of Existing Railing Building Or Portions Of Building As Part Of Scope Of Work Are Buildings Work Includes General Construction Scope Of Work Complete Renovation Of Roofing In Building 1 5Th Floor Roof Areas 26 28 30 And 32 3Rd Floor Roof Area 74 11Th Floor Roof Areas Complete Renovation Of Roofing In Building 5A Modular Entire Roof Complete Renovation Of Roofing In Building 5 Entire Roof Complete Renovation Of Roofing In Building 7 Portions At Front And Back 2 As Indicated On The Construction Documents These Documents For Project 561 19 120 Roofing Project Are Labeled 100 Cd And Dated December 8 2020 Deduct Alternate Has Been Added At The Bidding Period With One Or More Addenda Which Will Impact Phasing Increase Scope Of Work And Increase The Overall Duration Of Construction Building 15 Entire Roof Area Building 15A Entire Roof Area Building 16 Entire Roof Area Building 16A Entire Roof Area Building 17 Entire Roof Area Building 18 Entire Roof Area Corridor Areas Connecting Roof Areas 15 18 5 Roofs At The Rear Of Building The Chiller Plant Approx 10 700 Sq Ft Contractor Shall Provide Base Bid And Deduct Alternate Bid With Roof Areas Listed Separately There Will Be Deduct Alternates For Those Roof Areas 3 Specific Tasks Phasing The Medical Center Must Maintain Its Operation 24 Hours A Day 7 Days A Week Therefore Any Interruption In Service Must Be Scheduled And Coordinated With The Cor To Ensure That No Lapses In Operation Occur It Is The Contractor s Responsibility To Develop A Work Plan And Schedule Detailing At A Minimum The Procedures To Be Employed The Equipment And Materials To Be Used The Interim Life Safety Measure To Be Used During The Work And A Schedule Defining The Duration Of The Work With Milestone Subtasks The Work To Be Outlined Shall Include But Not Be Limited To To Ensure Such Executions Contractor Shall Furnish The Cor With A Schedule Of Approximate Dates On Which The Contractor Intends To Accomplish Work In Each Specific Area Of Site Building Or Portion Thereof In Addition Contractor Shall Notify The Cor Two Weeks In Advance Of The Proposed Date Of Starting Work In Each Specific Area Of Site Building Or Portion Thereof Arrange Such Dates To Ensure Accomplishment Of This Work In Successive Phases Mutually Agreeable To Cor And Contractor As Follows H All Buildings Will Be Occupied During Performance Of Work But Immediate Areas Of Alterations May Be Vacated 1 Contractor Shall Take All Measures And Provide All Material Necessary For Protecting Existing Equipment And Property In Affected Areas Of Construction Against Dust And Debris So That Equipment And Affected Areas To Be Used In The Medical Centers Operations Will Not Be Hindered Contractor Shall Permit Access To Va Personnel And Patients Through Other Construction Areas Which Serve As Routes Of Access To Such Affected Areas And Equipment These Routes Whether Access Or Egress Shall Be Isolated From The Construction Area By Temporary Partitions And Have Walking Surfaces Lighting Etc To Facilitate Patient And Staff Access Coordinate Alteration Work In Areas Occupied By Department Of Veterans Affairs So That Medical Center Operations Will Continue During The Construction Period I Construction Fence Before Construction Operations Begin Contractor Shall Provide A Chain Link Construction Fence 2 1M Seven Feet Minimum Height Around The Construction Area Indicated On The Drawings Provide Gates As Required For Access With Necessary Hardware Including Hasps And Padlocks Fasten Fence Fabric To Terminal Posts With Tension Bands And To Line Posts And Top And Bottom Rails With Tie Wires Spaced At Maximum 375Mm 15 Inches Bottom Of Fences Shall Extend To 25Mm One Inch Above Grade Remove The Fence When Directed By Cor J When A Building And Or Construction Site Is Turned Over To Contractor Contractor Shall Accept Entire Responsibility Including Upkeep And Maintenance Therefore 1 Contractor Shall Maintain A Minimum Temperature Of 4 Degrees C 40 Degrees F At All Times Except As Otherwise Specified 2 Contractor Shall Maintain In Operating Condition Existing Fire Protection And Alarm Equipment In Connection With Fire Alarm Equipment Contractor Shall Make Arrangements For Pre Inspection Of Site With Fire Department Or Company Department Of Veterans Affairs Or Municipal Whichever Will Be Required To Respond To An Alarm From Contractor s Employee Or Watchman K Utilities Services Maintain Existing Utility Services For Medical Center At All Times Provide Temporary Facilities Labor Materials Equipment Connections And Utilities To Assure Uninterrupted Services Where Necessary To Cut Existing Water Steam Gases Sewer Or Air Pipes Or Conduits Wires Cables Etc Of Utility Services Or Of Fire Protection Systems And Communications Systems Including Telephone They Shall Be Cut And Capped At Suitable Places Where Shown Or In Absence Of Such Indication Where Directed By Cor 1 No Utility Service Such As Water Gas Steam Sewers Or Electricity Or Fire Protection Systems And Communications Systems May Be Interrupted Without Prior Approval Of Cor Electrical Work Shall Be Accomplished With All Affected Circuits Or Equipment De Energized When An Electrical Outage Cannot Be Accomplished Work On Any Energized Circuits Or Equipment Shall Not Commence Without A Detailed Work Plan The Medical Center Director S Prior Knowledge And Written Approval Refer To Specification Sections 26 08 00 Commissioning Of Electrical Systems For Additional Requirements 2 Contractor Shall Submit A Request To Interrupt Any Such Services To Cor In Writing 7 Days In Advance Of Proposed Interruption Request Shall State Reason Date Exact Time Of And Approximate Duration Of Such Interruption 3 Contractor Will Be Advised In Writing Of Approval Of Request Or Of Which Other Date And Or Time Such Interruption Will Cause Least Inconvenience To Operations Of Medical Cemetery Interruption Time Approved By Medical Center May Occur At Other Than Contractor s Normal Working Hours 4 Major Interruptions Of Any System Must Be Requested In Writing At Least 15 Calendar Days Prior To The Desired Time And Shall Be Performed As Directed By The Cor 5 In Case Of A Contract Construction Emergency Service Will Be Interrupted On Approval Of Cor Such Approval Will Be Confirmed In Writing As Soon As Practical 6 Whenever It Is Required That A Connection Fee Be Paid To A Public Utility Provider For New Permanent Service To The Construction Project For Such Items As Water Sewer Electricity Gas Or Steam Payment Of Such Fee Shall Be The Responsibility Of The Government And Not The Contractor L Abandoned Lines All Service Lines Such As Wires Cables Conduits Ducts Pipes And The Like And Their Hangers Or Supports Which Are To Be Abandoned But Are Not Required To Be Entirely Removed Shall Be Sealed Capped Or Plugged At The Main Branch Or Panel They Originate From The Lines Shall Not Be Capped In Finished Areas But Shall Be Removed And Sealed Capped Or Plugged In Ceilings Within Furred Spaces In Unfinished Areas Or Within Walls Or Partitions So That They Are Completely Behind The Finished Surfaces M To Minimize Interference Of Construction Activities With Flow Of Medical Center Traffic Comply With The Following 1 Keep Roads Walks And Entrances To Grounds To Parking And To Occupied Areas Of Buildings Clear Of Construction Materials Debris And Standing Construction Equipment And Vehicles 2 Method And Scheduling Of Required Cutting Altering And Removal Of Existing Roads Walks And Entrances Must Be Approved By The Cor N Coordinate The Work For This Contract With Other Construction Operations As Directed By The Cor This Includes The Scheduling Of Traffic And The Use Of Roadways As Specified In Article Use Of Roadways 4 Performance Monitoring If Applicable N A 5 Security Requirements The Contractor Employees Shall Not Have Access To Va Sensitive Or Computer Information And Will Not Require Routine Access To Va Facilities The Contractor Employees Shall Require Intermittent Access Only And Will Be Escorted By Va Employees While At Va Facilities No Background Investigation Is Required A Security Plan 1 The Security Plan Defines Both Physical And Administrative Security Procedures That Will Remain Effective For The Entire Duration Of The Project 2 The General Contractor Is Responsible For Assuring That All Sub Contractors Working On The Project And Their Employees Also Comply With These Regulations B Security Procedures 1 General Contractor S Employees Shall Not Enter The Project Site Without Appropriate Badge They May Also Be Subject To Inspection Of Their Personal Effects When Entering Or Leaving The Project Site 2 Before Starting Work The General Contractor Shall Give One Week S Notice To The Contracting Officer So That Security Arrangements Can Be Provided For The Employees This Notice Is Separate From Any Notices Required For Utility Shutdown Described Later In This Section 3 No Photography Of Va Premises Is Allowed Without Written Permission Of The Contracting Officer 4 Va Reserves The Right To Close Down Or Shut Down The Project Site And Order General Contractor S Employees Off The Premises In The Event Of A National Emergency The General Contractor May Return To The Site Only With The Written Approval Of The Contracting Officer C Key Control 1 The General Contractor Shall Provide Duplicate Keys And Lock Combinations To The Resident Engineer For The Purpose Of Security Inspections Of Every Area Of Project Including Tool Boxes And Parked Machines And Take Any Emergency Action 2 The General Contractor Shall Turn Over All Permanent Lock Cylinders To The Va Locksmith For Permanent Installation 6 Other Pertinent Information Or Special Considerations N A A Identification Of Possible Follow On Work N A B Identification Of Potential Conflicts Of Interest Coi N A C Inspection And Acceptance Criteria The Cotr Is Responsible For Certifying That The Work Done Under The Contract Is Performed To Time And Standard They Are Also Responsible To Assure The Inspection And Acceptance Of Products Provided Incidental To Services 7 Risk Control Refer To Attached Contract Document 8 Place Of Performance East Orange Vamc Nj 9 Period Of Performance 310 Days From The Date Of The Notice To Proceed 10 Delivery Schedule Submit For Approval All Of The Items Specifically Mentioned Under The Separate Sections Of The Specification With Information Sufficient To Evidence Full Compliance With Contract Requirements Materials Fabricated Articles And The Like To Be Installed In Permanent Work Shall Equal Those Of Approved Submittals After An Item Has Been Approved No Change In Brand Or Make Will Be Permitted Unless A Satisfactory Written Evidence Is Presented To And Approved By Contracting Officer That Manufacturer Cannot Make Scheduled Delivery Of Approved Item Or B Item Delivered Has Been Rejected And Substitution Of A Suitable Item Is An Urgent Necessity Or C Other Conditions Become Apparent Which Indicates Approval Of Such Substitute Item To Be In Best Interest Of The Government 1 4 Forward Submittals In Sufficient Time To Permit Proper Consideration And Approval Action By Government Time The Submission To Assure Adequate Lead Time For Procurement Of Contract Required Items Delays Attributable To Untimely And Rejected Submittals Will Not Serve As A Basis For Extending Contract Time For Completion 1 5 Review Effort By The Architect Engineer A E Of Rejected And Or Revised Submittals Beyond Two Submissions Of The Same Item Will Qualify For The Contractor To Compensate The A E For Time Spent 1 6 Submittals Will Be Reviewed For Compliance With Contract Requirements By Architect Engineer A E And Action Thereon Will Be Taken By Contracting Officer S Representative Cor On Behalf Of The Contracting Officer 1 7 Upon Receipt Of Submittals A E Will Assign A File Number Thereto Contractor In Any Subsequent Correspondence Shall Refer To This File And Identification Number To Expedite Replies Relative To Previously Approved Or Disapproved Submittals 1 8 The Government Reserves The Right To Require Additional Submittals Whether Or Not Particularly Mentioned In This Contract If Additional Submittals Beyond Those Required By The Contract Are Furnished Pursuant To Request Therefor By Contracting Officer Adjustment In Contract Price And Time Will Be Made In Accordance With Articles Titled Changes Far 52 243 4 And Changes Supplement Vaar 852 236 88 Of The General Conditions 1 9 Schedules Called For In Specifications And Shown On Shop Drawings Shall Be Submitted For Use And Information Of Department Of Veterans Affairs And A E However The Contractor Shall Assume Responsibility For Coordinating And Verifying Schedules The Contracting Officer And A E Assumes No Responsibility For Checking Schedules Or Layout Drawings For Exact Sizes Exact Numbers And Detailed Positioning Of Items 1 10 Submittals Must Be Submitted By Contractor Only And Shipped Prepaid Contracting Officer Assumes No Responsibility For Checking Quantities Or Exact Numbers Included In Such Submittals A Submit Samples In Single Units Unless Otherwise Specified Submit Shop Drawings Schedules Manufacturers Literature And Data And Certificates In Pdf Format Except Where A Greater Number Is Specified B Submittals Will Receive Consideration Only When Covered By A Transmittal Letter Signed By Contractor Letter Shall Be Sent Via E Mail In Pdf Format And Shall Contain The List Of Items Name Of Medical Center Name Of Contractor Contract Number Applicable Specification Paragraph Numbers Applicable Drawing Numbers And Other Information Required For Exact Identification Of Location For Each Item Manufacturer And Brand Astm Or Federal Specification Number If Any And Such Additional Information As May Be Required By Specifications For Particular Item Being Furnished In Addition Catalogs Shall Be Marked To Indicate Specific Items Submitted For Approval 1 Transmittal Letter Must Be Enclosed With Items And Any Items Received Without Identification Letter Will Be Considered Unclaimed Goods And Held For A Limited Time Only 2 Each Sample Certificate Manufacturers Literature And Data Shall Be Labeled To Indicate The Name And Location Of The Medical Center Name Of Contractor Manufacturer Brand Contract Number And Astm Or Federal Specification Number As Applicable And Location S On Project 3 Required Certificates Shall Be Signed By An Authorized Representative Of Manufacturer Or Supplier Of Material And By Contractor C If Submittal Samples Have Been Disapproved Resubmit New Samples As Soon As Possible After Notification Of Disapproval Such New Samples Shall Be Marked Resubmitted Sample In Addition To Containing Other Previously Specified Information Required On Label And In Transmittal Letter D Approved Samples Will Be Kept On File By The Cor At The Site Until Completion Of Contract At Which Time Such Samples Will Be Delivered To Contractor As Contractor s Property Where Noted In Technical Sections Of Specifications Approved Samples In Good Condition May Be Used In Their Proper Locations In Contract Work At Completion Of Contract Samples That Are Not Approved Will Be Returned To Contractor Only Upon Request And At Contractor s Expense Such Request Should Be Made Prior To Completion Of The Contract Disapproved Samples That Are Not Requested For Return By Contractor Will Be Discarded After Completion Of Contract E Submittal Drawings Shop Erection Or Setting Drawings And Schedules Required For Work Of Various Trades Shall Be Checked Before Submission By Technically Qualified Employees Of Contractor For Accuracy Completeness And Compliance With Contract Requirements These Drawings And Schedules Shall Be Stamped And Signed By Contractor Certifying To Such Check 1 For Each Drawing Required Submit One Legible Pdf File Or Bond Copy 2 Bond Copy Shall Be Full Size 3 Each Drawing Shall Have Marked Thereon Proper Descriptive Title Including Medical Center Location Project Number Manufacturer s Number Reference To Contract Drawing Number Detail Section Number And Specification Section Number 4 A Space 4 3 4 By 5 Inches Shall Be Reserved On Each Drawing To Accommodate Approval Or Disapproval Stamp 5 Submit Drawings Electronically Or Rolled Within A Mailing Tube Fully Protected For Shipment 6 One Pdf Of Approved Or Disapproved Shop Drawings Will Be Forwarded To Contractor 7 When Work Is Directly Related And Involves More Than One Trade Shop Drawings Shall Be Submitted To A E Under One Cover 1 11 Samples Shop Drawings Test Reports Certificates And Manufacturers Literature And Data Shall Be Submitted For Approval To Fellenzer Engineering Llp 22 Mulberry Street Suite 2A Middletown Ny 10940

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail