Tenders Are Invited For Technical Inspection Of The Southern Railway Danube Bridge

Tender Detail

36610515
2021 S 013 028835
Self Funded
Tenders Are Invited For Technical Inspection Of The Southern Railway Danube Bridge
ICB
Eastern Europe
European Union
25-04-2021

Work Detail

Modification Of A Contract Concession During Its Term Technical Inspection Of The Southern Railway Danube BridgeArchitectural Engineering And Planning ServicesShort Description Technical Inspection And Engineering Services In Connection With The Contract For The Modernization Of The Southern Connecting Railway Danube Bridge Preparation Of Construction Plans And Execution Of Construction WorksMain Quantities Indicative Data The Railway Construction Project Entitled Modernization Of The Southern Connecting Railway Danube Bridge Preparation Of Construction Plans And Execution Of Construction Works Will Be Implemented By The Contracting Authority During The Investment The Bidder Is Responsible For Providing Technical Inspection And Engineering Services The Related Railway Construction Investment Includes But Is Not Limited To 1 No 1 Vv 82 The Two Existing Single Track Structures Of The Southern Danube Railway Bridge In The Section 94 94 M2 Must Be Demolished And Three New Single Track Structures Must Be Built The Planned Supports Are 45 58M 93 88M 93 43M 93 43M 93 78M 45 80M The Planned Three Single Track Multi Girder Steel Structures Will Rely On Common Substructures Which Will Have To Be Converted To Accommodate The New Structures And A New Pile Walled Bridgehead Will Be Built On The Buda Side 2 On The Section Of Line Affected By The Investment The Infrastructure Of The Railway Track And Other Related Sectors Ensuring The Completeness Of The Project Must Also Be Rebuilt Such As Interlocking Train Control System Telecommunication Etc Approximately A Total Of 3 Track Km 3X1 Km Are Affected 3 The Electrical Overhead Line Equipment To Be Rebuilt Has A Ground Fed Power Supply System With A Nominal Voltage Of 1X25kv And A Frequency Of 50Hz 4 Noise Protection Walls Must Be Built On The Structure And The Connecting Section Affected By The Investment 5 The Necessary Utility Replacements Must Be Made 6 In Connection With The Above The Task Is To Prepare And Approve The Construction Plans On The Basis Of The Available Permitting Plans Permits And Certificates And Then To Implement Them 7 In View Of The Key Importance Of The Railway Line During Construction Railway Traffic On Two Tracks Must Be Maintained At All Times As Detailed In The Technical Specifications In The Case Of The Above Transport Facility The Technical Inspection And Engineering Tasks Shall Be Performed In Connection With The Following Design Tasks Depending Inter Alia On The Stage Of Performance Of The Construction Contract When The Contract Enters Into Force 1 Creating An Execution Plan2 Creating An Implementation Plan3 Preparation Of Qualification DocumentationThe Tasks To Be Performed Under This Contract Include But Are Not Limited To The Following Sub Activities 1 Technical Inspection 2 Reviewing Plans Prepared By The Contractor And Proposing For Approval 3 Commenting On Business Claims 4 Monitoring Physical And Financial Progress Reviewing And Approving Entrepreneurial Schedules 5 Preparation Of Regular Reports For The Contracting Authority 6 Technical Feasibility Opinion Of The Possibly Individual Technical Solutions Arising During The ProjectIt Is Also Responsible For Participating In The Process Of The Temporary Marketing Commissioning Entry Into Service Procedure In Particular For Examining The Adequacy Of The Documentation Provided By The Contractor For The Successful Completion Of The Procedures After Completion Of The Construction Works Detailed In Section 3 3 6 Of The Szf The Contractors Tasks To Be Performed During The Warranty Period Of The Business Contract Include But Are Not Limited To 1 Checking The Fulfillment Of The Contractors Warranty Obligation 2 Convene A Warranty Meeting 3 In The Event Of A Breach Of The Contractors Warranty Obligations Proposing A Settlement Or Enforcing The Warranty 4 Convening And Conducting Follow Up Procedures 5 At The End Of The Warranty Period Prepare The Final Reports And Draft The Warranty Certificate A Detailed Job Description Is Included In The Procurement Documents Type Of Buyer Body Governed By Public LawType Of Contract ServicesType Of Procedure Open ProcedureRegulation European Union With Participation By Gpa CountriesType Of Bid Not ApplicableAward Criteria Not Applicable Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail