Tenders Are Invited For Csopaki Ranolder Fork Construction Works

Tender Detail

36607208
2021 S 013 026831
Self Funded
Tenders Are Invited For Csopaki Ranolder Fork Construction Works
ICB
Eastern Europe
European Union
26-01-2021

Work Detail

Additional Information Csopaki Ranolder Fork Construction WorksBuilding Construction WorkShort Description Renovation Of Ranolder Villa And Its Garden Within The Framework Of The Project Entitled Development Of Integrated Products And Services In Tourist Frequented Areas And Development Of Wine And Gastronomic Attractions And Supply In The Lake Balaton Area Project Id Ginop 7 1 9 17 2018 00017 Project Location H 8229 Csopak Kishegyi t 13 Ranolder Villa Hrsz 031 8 031 9 031 10 031 11 Monument Number 5483 9815 Mk5483 17306 Project Summary Description The Successful Tenderer In This Procurement Procedure Is Responsible For Carrying Out The Construction And Demolition Work On The Ranolder Villa And Associated Garden Renovation Project Defining Parameters The Protected Parts Of The Building The Villa And The Tower Building 355 4 M2floor Area The Construction Activity Concerns The Construction Activities Of The Two Storey Ground Floor Villa And Tower Building And The Construction Of The New Three Storey Basement Ground Floor Connecting Wing The Useful Floor Area Of The Building 1551 90 M2 Cellar 483 20 M2 Ground Floor 551 59 M2 Floor 517 10 M2 Demolitions Of The Villa Building The Floor Layers Of The Villa Building Must Be Demolished To Structure The Roof Structure And Superstructures Must Be Dismantled Partitions Must Be Demolished Structural Design Of The Monumental Parts The Foundation Of The Villa Building Has A Mixed Structure Which Needs To Be Strengthened In Places The Ascending Wall Structures Are Small Brick Masonry The Slabs Of The Terrace Are Brick Vaults The Other Slabs Of The Building Have A Prefabricated Reinforced Concrete Beam Structure The Staircase Has A Single Armed Monolithic Reinforced Concrete Structure The Deck Chair Has A Steel Beam Structure With A Sheet Metal Shell On The Ground Floor Of The Villa Building There Is A Lobby Tasting Rooms And Operating Offices Upstairs There Is A Lobby And Meeting Rooms Connected To The Upstairs Terrace The Tower Building Includes A Vertical Passageway For Access To The Roof Terrace The New Connecting Wing Has Three Floors Two Stairs And Two Elevators Provide A Connection Between The Levels On The Basement Level There Are Operating Rooms Electrical Mechanical And Kitchen Technology Rooms As Well As Water Blocks On The Ground Floor Next To The Exhibition Space 149 73 M2 The Shop 101 67 M2 There Is A Traffic And Engineering Space Upstairs There Is A Conference Room For 80 People 98 04 M2 A Cooking Studio 72 72 M2 And A Show Kitchen The Kitchen Is Basically Equipped With Technological Equipment For 200 Servings Shift Structural Design Of The Connecting Wing Prior To The Construction Of The Connecting Wing A Excavation Pit With Pile Technology Must Be Made To Support The Retaining Walls Of Existing Buildings And The Road The New Building Will Be Made With A Monolithic Reinforced Concrete Slab Base A Pile Slab In The Basement Reinforced Concrete Walls And Pillars Frame Ceramic Masonry Infill Walls Monolithic Reinforced Concrete Flat Slabs And A Coffin Closing Slab The Stairs Connecting The Levels Are Monolithic Reinforced Concrete Stairs Volume Of Concreting Work On The Supporting Structures 1250 M3 The Building Has A Plastered Look With A Sheet Metal Covering The Design Of The Buildings Includes A Full Range Of Modern Mechanical Water Sewerage Heating Cooling Gas Installation Ventilation And Electrical Strong And Weak Current Lightning Protection Etc Design Part Of The Task Is To Design Fire Protection Equipment Fire Alarm System Rwa Etc The Utility Service Of The Building Water Sewage Rainwater And Drain Must Be Newly Designed The Building Has A Surface Car Park For 50 Cars Which Is Divided Into Three Parts Of These Two Parking Lots Are Paved And One Is Crushed Stone Non Listed Parts Of The Building The One Storey Connecting Wing Between The Castle And The Tower Built In The Sixties And The Two Storey Basement Ground Floor Auditorium As Well As The Associated External Cladding Stairs And Retaining Walls Continuation Due To Character Limitation In Point Ii 2 4 Deadline For Submission 20210126 10 00Type Of Buyer OtherType Of Contract WorksType Of Procedure Open ProcedureRegulation European Union With Participation By Gpa CountriesType Of Bid Submission For All LotsAward Criteria The Most Economic Tender Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail