Tenders Are Invited For Defect Rectification Of Control Damper

Tender Detail

36549481
2332100156
Self Funded
Tenders Are Invited For Defect Rectification Of Control Damper
ICB
Western Asia
Arab World,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
21-01-2021

Work Detail

Quotation Are Invited For Defect Rectification Of Control Damper Defect Rectification Of Control Damper In Ph I Whb 1A 1B For E Station As Per Below Description Details Are As Follows A Mat Erial Ss 321H B Medium Exhaust Flue Gas C Flue Gas Pressure 15 To 18Mbar D Temperature 550 c E Drawing Dimensions Will B E Provided F No Of Job 01No Scope Of Work 1 Control Damper Center Column To Be Made Straight As Rectification 2 Flap Sh Aft Connecting Grove Bushes Replacement At Both Ends 3 Flap Shaft Connecting Grove Bushes Gap Alignment Suitable For Cold Hot Conditions 4 Shaft Seals Fabrication And Fixing 5 Boiler Casing Defect Rectification 6 Casing End Side Shaft Groov E Bush Replacement 7 Both Side Flap Shaft Alignment 8 Gland Packing Fixing 9 Gland Packing Follower Fabrication As Perm Aterial Specification 10 Warranty On Workmanship Will Be 01Year From The Date Of Charging 11 Time Period 10Days From The Date Of Site Mobilization 12 Inspection By Dewa Engineer At 3 Fabrication Stages 13 Manpower Mobilization For Job Exe Cution 14 Transportation From E Station To Company Workshop Both Sides Etc To Be Arranged By Supplier Contractor Scope 1 The Contractor Shall Provide Adequate Number Of Technical Qualified Staff And Supervisors On Site Having Mini Mum Of Three Years Prior Experience On Particular Job To Ensure Proper And Timely Completion Of Work 2 The Contractor Shall Also Nominate One Responsible Person As Project Engineer Who Shall Liaison With The Owner On Any Matters Pertaining To The Co Ntract And Who Will Be Available At Site Throughout The Working Hours 3 The Contractor Should Submit The Bio Data The Enginee R Technical Supervisors Quality Inspectors Safety Supervisor 4 Contractor Should Be Certified And Registered With Dewa 5 All Applicable Equipment And Tools Should Have Valid Test Certificate From 3Rd Party Licensed Certifying Agencie S 6 Including All The Followings Shall Be Arranged By The Contractor As Part Of The Contract Work A Collection Of The F Abric Expansion Joints Fittings From Dewa Stores For Fabrication Installation Work B Consumables Tools Tackles Etc Required For The Work C Hand And Powered Tools Rigging Tools Material Handling Facilities Alignment Jigs And F Ixtures Inspection Tools And Accessories D Tarpaulins Hand And Working Lamps Temporary Supports Etc E Perso Nal Safety Protection Equipment First Aid Kit For His Staff At Site F In General All Items Of Tools Accessories Consumable Hoses Cables Distribution Board Etc Other Than Facilities Provided By Dewa Shall Be Arranged By The Cont Ractor Inspection Of Site 1 The Prospective Bidders Shall Visit The Site Which Shall Be Arranged With Prior Appointment De Wa Will Not Accept Any Claim For Extras Beyond The Order Rates Prices During And After The Execution Of Work Ordered 2 The Schedule Of Shutdown Will Be Intimated In Advance Separately And Work To Be Carried Out During That Period Only Dewa Wi Shes To Get The Fabric Expansion Joints Work Installation Through Reputed And Well Experienced Contractor A No Job Sha Ll Be Start Without The Approval Of Dewa Engineers Of The Fit Up B Removal Of Old Existing Expansion Joint Without Damaging Other Equipment Shall Be Checked Properly C Installation Of New Expansion Joint Along With Bolster Shall Be As P Er Drawing Guidance Of Dewa Engineer D Only Qualified Experienced Persons To Be Involved In The Job E New Patch To Be Fixed Properly Aligned And Free From Any Deviation According To Drawing F Necessary Associated To Job Weldin G Shall Be Done In Accordance With The Qualified Welding Procedure G Prior To Commencement Of Job A Method Statement Should Be Prepared And Submitted To Dewa Approval H Previous Experience For The Similar Job List To Be Provided Along With The Bid I There Shall Be Separate Contractor S Quality Control Inspector At Site To Monitor And Ensure The Quality Of Work Carried By The Contractor J During The Execution Of Work Under This Contract The Contractor Shall Carry Out The Quality Control Measures And Tests K There Shall Have Free Access To Contractor S Site At All Times L Only After The Inspection And Certification By Dewa Engineer The Job Shall Proceed Further Advance Notice For These Inspections Shall Be Given To Dewa By The Contractor To Enable Prompt Scheduling Of The Inspections M The Following Activities In Specific Shall Be Offered For Inspection And Approval By Dewa Engineers I Fit Up Work Of Expansion Joint Prior To Bolting Ii Complet Ion Of Final Bolt Tightening Check Iii In Spite Of All The Care Taken By The Contractor And It S Workmen If Any Of The Plant Items Are Damaged Or Defaced Or Otherwise Made Inoperational By The Contractor S Men This Shall Be Forthwith Reported To Dewa Engineer In Charge Of The Job To Avert Further Damages Breakdown Or Shutd Own Of The Total Plant Records 1 The Contractor Should Submit The Daily Work Progress Report Tbt Check Lists Quality Contro L Reports Safety Reports Housekeeping Reports And Other Documents To The Engineer In Charge Of The Station 2 The Contract Or Should Keep Ptw Risk Assessment Line Clearances And Tbt Copy At Site For All Works 3 The Contractor Should Submit The Co Mpletion Report With Units Of Measurements For All Jobs Warranty Period 1 The Work Carried Out By Contractor Under This Con Tract Shall Carry A Warranty Of 01Year Against For Faulty Poor Fabrication Erection And Workmanship 2 In Case If Any Dam Age Deterioration Of The Work Carried Out Under This Contract Within This Warranty Period The Contractor With All Speed Sha Ll Attend And Carry Out The Necessary Repair Work And Make Good The Defect Deterioration Without Affecting The Production Of Electricity And Water The Retention Money Will Be Cleared Only After Completion Of The Warranty Period 3 On Being G Iven A Notice By Dewa The Contractor Shall Arrange To Carry Out The Repair Work Within The Allotted Prescribed Time Limit A Sset Out By Dewa And All Such Contingencies Shall Be Deemed To Have Been Covered In The Offer Housekeeping 1 At All Tim Es During Execution Of This Contract The Area Of Work Shall Be Kept Neat Clean And Tidy On Completion Of The Job The Pl Ace Of Work Shall Be Cleaned To The Satisfaction Of Dewa 2 The Scrap Old Material And Wastes Shall Be Disposed From Site Under Direction Of Dewa Engineer All Hazardous Waste Shall Be Moved With Written Approval To Dewa Special Storage Area 3 Contractor Should Clean Up And Remove Any Scrap Or Wastages Or Oil Spills On Ground And Other Parts And Leave Those Items In Ori Ginal Shape And Condition If Any Part Of The Plant Is Defaced Or Smeared These Shall Be Cleaned And Restored To Original Condit Ion Free Of Cost By The Contractor Safety Security Guide Lines 1 All Dewa Safety Environment Policy Rules And Regulat Ions Shall Be Followed At Work Site During The Contract Period The Contractor S Work Will Fall Within The Purview Of Sa Fety Surveys Conducted Regularly By The Dewa Safety Section All Their Safety Requirements Shall Be Promptly Met 2 There Should Be Separate Qualified Safety Supervisor For The Contractor Works At Site At All Time He Should Provide Tool Box Talk S Every Day Before Start Of Work Fo Qty 1Defect Rectification Of Control DamperStandard Terms Conditions1 Prices Should Be Ddp Delivery Duty Paid At Dewa Stores 2 Quotation To Be Submitted Only In Local Currency U A E Dirhams3 Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material4 No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company And Your Participation In Dewa Tenders Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail