Tenders Are Invited For Bansk Bystrica Protection Of Urban Areas Against Floods

Tender Detail

36439912
2021 S 008 013312
Self Funded
Tenders Are Invited For Bansk Bystrica Protection Of Urban Areas Against Floods
ICB
Eastern Europe
European Union
18-04-2021

Work Detail

Modification Of A Contract Concession During Its Term Bansk Bystrica Protection Of Urban Areas Against FloodsFlood Prevention WorksShort Description The Construction Addresses The Modification Of Banks Protective Dams Embankment Flood Walls Mobile Barriers And The Method Of Discharging Internal Water During The Passage Of The Design Flood In The Hron Riverbed And Its Existing Floodplain Through The Urban Area Of Bansk Bystrica The Only Inundation Area In The Inner City Is The Left Bank Of The Hron Namely Between 9 M ja Street From The Underpass Under The Railway Body In The Direction Of The Entrance To The Bridge On 9 M ja Street To The Bank Below The Mal elezn Railway Station In Width To The Body Of The Railway Embankment This Area As An Inundation Area For The Use Of The Flow Capacity Of The Riverbed Is Also Envisaged In This Construction The Left And Right Banks Of The Hron River Outside This Floodplain Are Protected By A Proposed Structure Which Consists Of The Construction Of Flood Protection Embankment Walls And Related Parts Of Mobile Flood Protection Above The Level Of The Design Flood Of 1 0 M Section 4 Flood Protection Line On The 4Th Section Stream Bystrica In Km 175 380 Is Designed So That The Backflow From Hron During The Design Flood Q100 In Hron And The Flows Of Bystrice In The Bystrice Riverbed Are Not Spilled Into The Protected Area For Bystrica The Safety Elevation Is Designed For A Height Of 1 5 M In The Entire Section And At The Mouth Of Bystrica To Hron Up To 1 7 2 0 M The Fixed Part Of The Flood Protection If It Is Not Located In The Place Of Roads And Sidewalks Is Designed To The Level Of Qn vrhov And More In The Place Of Pedestrian Crossings Road Crossings Entrances To The Riverbed Etc The Openings In The Embankment Wall Are Covered By Mobile Elements Of Flood Protection At Full Height From The Threshold Of The Barrier Which Copies The Current Terrain Of Roads And Sidewalks Bansk Bystrica Majer Protection Of Urban Areas Against Floods Reconstruction The Technical Solution Of The Construction In The Locality Between The Footbridge In Majer R Km 178 232 And The Road Bridge To The Industrial Park In alkov Over Selciansky Potok Is A Functional And Construction Continuation Of Protective Measures Ending At The Footbridge In Majer Bansk Bystrica Protection Against Urban Floods 3 Section Right Bank The Proposed Technical Solution Of Flood Protection Measures Consists Of From The Construction Of A Waterfront Wall On The Right Bank Of The Hron And Selcianske Streams From The Elevation Of The Existing Right Hand Earth Protection Dam Of The Selcianske Brook From The Construction Of A Flood Protection Opening In The Embankment In The Place Of The StairsFlood Protection Measures In The Solved Section Of Hron Are Designed To Ensure The Protection Of The Area For The Design Flow Q100 503 M3 S 1 With An Elevation Of 1 0 M Above The Design Flow Level Bansk Bystrica Ilia Radvan Flood Protection Measures On Hrone R Km 172 000 173 564 Reconstruction The Purpose Of The Construction Is To Ensure Flood Protection Of The Area On The Right And Left Bank Of The Hron From Km 172 000 Road Bridge To Ilia After R Km 173 564 Kr lov Road Bridge Flood Protection Measures Are Designed With An Elevation Of 1 0 M Above The Calculated Level In The Riverbed And Inundation At The Flow Of The Design Flood Q100 560 M3 S 1 The Technical Solution Of The Reconstruction Consists Of Increasing The Capacity Of The Protective Dam In The Length Of 1011 M In The Form Of Completing The Embankment Wall Max Height Of About 1 0 M And From The Reconstruction Of The Existing Embankment Walls In The Length Of 513 M Traffic Openings In Embankment Walls During Flood Flows Will Be Protected By Mobile Elements And The Left Hand Railway Underpass Will Be Protected By Temporary Bagging Bansk Bystrica Protection Of Urban Areas Against Floods 6 Mobile Wall Warehouse The Proposed Building Is A Warehouse For Construction Within The Area Of The Mh Warehouse There Are Defined Areas For Cleaning Treatment And Maintenance Of Mobile Wall Components This Maintenance Must Always Be Performed Before Placing The Components On The Pallets And Storing The Pallets With The Components In The Warehouse Type Of Buyer Body Governed By Public LawType Of Contract WorksType Of Procedure Open ProcedureRegulation European UnionType Of Bid Not ApplicableAward Criteria Not Applicable Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail