Tenders Are Invited For Survey And Design For The Rehabilitation Of Custom Secretariat Building Beirut Police Office Building

Tender Detail

36396316
Self Funded
Tenders Are Invited For Survey And Design For The Rehabilitation Of Custom Secretariat Building Beirut Police Office Building
ICB
Western Asia
Arab World,Middle East,Middle East and North Africa, MENA
26-01-2021

Work Detail

Tenders Are Invited For Survey And Design For The Rehabilitation Of Custom Secretariat Building Beirut Police Office Building 1 5 2 Km Of Sidewalk Street Median And An Old Building At The Old Training Station In Beirut Municipality The Ilo Eiip Project With Funding From Germany Through Kfw Development Bank And In Close Collaboration With The Ministry Of Labour And The Ministry Of Social Affairs Is Implementing The Lebanon Employment Intensive Infrastructure Programme Eiip As Part Of Its Response To The Syrian Refugee Crisis To Create Decent Jobs For Vulnerable Lebanese Host Community Members And Syrian Refugees And Ease The Strain On Local Infrastructure Eiip Lebanon Has An Equal Opportunity Approach For Women And Men To Be Engaged In Labour Intensive Works With A Target Of Including More Than 15 Women In The Work Force Eiip Further Aims To Include People With Disability Pwd Reaching At Least 2 Of The Work Force Additionally The Objective Of The Improved Infrastructure Is To Generate Economic And Social Benefits For The Local Communities And To Facilitate Access For People With Disability The Eiip Project In Lebanon Phase Iv Will Provide A Special Intervention In Respond To The Beirut Port Explosion On 4Th August 2020 To Include The Following Works Rehabilitation Of Beirut Custom Secretariat Building The Project Is Located In Saifi Beirut Municipality 33 59592 35 51138 The Proposed Project Consists Of Rehabilitation Of The Existing Custom Secretariat Building Which Was Heavily Damaged By The Beirut Port Explosion Details Of The Major Works Include But Are Not Limited To Removal Of The Rubble Inside And Outside Of The Building Replace The Damaged Concrete Block Walls And Partition Walls Repair Replace Concrete Structures Replace The Damaged Ceiling The Damaged Floor Tiles Provision Of Plastering And Painting Works Of The Interior And The Exterior Walls And Partition Walls Provision Of Doors Windows Electrical Works Mechanical Plumbing Work And Sanitary Works Etc Other Details Shall Be Identified After A Consultant Is Assigned For The Purpose Rehabilitation Of Beirut Police Office Building The Project Is Located In Karanteena Beirut Municipality 33 90076 35 52781 The Proposed Project Consists Of Rehabilitation Of The Existing Beirut Police Office Building And A Reception Building Which Were Heavily Damaged By The Beirut Port Explosion Details Of The Major Work Include But Are Not Limited To Removal Of The Rubble Inside And Outside The Building Replace The Damaged Concrete Block Walls And Partition Walls Repair Replace Concrete Structures Replace The Damaged Ceiling And Roofing Replace The Damaged Floor Tiles Provision Of Plastering And Painting Works Replace The Damaged Doors And Windows Provision Of Electrical Mechanical Plumbing And Sanitary Works Other Details Shall Be Identified After A Consultant Is Assigned For The Purpose Rehabilitation Construction Of 1 1 5 Km Of Sidewalk The Project Is Located In Karanteena Beirut Municipality 33 899658 35 59330069 The Proposed Project Consists Of The Construction And Rehabilitation Of Sidewalk And Street Median In Karanteena Beirut Municipality The Proposed Work Includes But Not Limited To Remove The Existing Old Sidewalks And Street Medians Construct New Sidewalks Concrete Curb Drainage Where Needed And Street Medians To An Appropriate Standard Other Works And Details To Be Identified Under This Consultancy Assignment Rehabilitation Of A Building In The Public Transport Station Former Train Station The Project Is Located In Geitawi Beirut Municipality 33 89808 35 52755 The Steel Structure Building Of The Public Transport Station Former Train Station Was Heavily Damaged By The Beirut Port Explosion But The Building Is Too Big To Be Considered For The Reconstruction Under The Eiip Project The Eiip Project Will Therefore Rehabilitate A Building Of This Station Which Was Built During The Last Century Old French Style Building The Proposed Work Consists Of Rehabilitation Of The Existing Old Building Which Was Partially Damaged By The Beirut Port Explosion And Partially Damaged By Its Ages Details Of The Major Work Include But Are Not Limited To Removal Of The Rubble Inside And Outside The Building Replacing The Damaged Concrete Block Partition Walls Restore The Concrete Block Walls Repair Replacing Concrete Structures Replace And Restore The Damaged Ceiling And Roofing Replace The Damaged Floor Tiles Provision Of Plastering And Painting Works Replace The Damaged Doors And Windows Provision Electrical Mechanical Plumbing And Sanitary Works Other Details Shall Be Identified After A Consultant Is Assigned For This Purpose Reconstruction Of The Concrete Block Fencing Surrounding The Compound 2 Scope Of The ConsultancyThe Ilo Will Hire A Design Consultancy Firm For Surveying Condition Assessment Design And Preparation Of Technical Drawings Preparation Of Boq And Technical Specifications For The Above Mentioned Works In Beirut Municipality The Consultant Shall Throughout The Assignment Coordinate Closely With The Municipality Of Beirut The Ministry Of Public Works And Other Concerned Authorities While Keeping The Ilo In The Loop Of All Interactions The Consultant Is To Include The Ilo In All Correspondences And Meetings Concerning The Assignment The Specific Scope Of The Consultancy Consists Of The Following But Are Not Limited To 2 1 Phase I Preliminary Studies Conceptual DesignThe Consultant Shall Carry Out All Necessary Preliminary Studies And Condition Assessment Surveys And Collect As Required Information Related To The Projects For Carrying Out The Design 2 1 1 Data Collection Physical Condition Assessment Surveys Data Collection The Consultant At The Start Of The Assignment Shall Contact The Municipality Of Beirut And Ministry Of Public Work To Assess What Relevant Information Is Already Available And What Information And Document Related To The Design Work Including Any Utilities Within Proposed Locations Physical Condition Assessment And Writing The Assessment ReportThe Consultant Shall Undertake A Full Physical Condition Assessment Of The Proposed Buildings And The Sidewalk Street Median And Written Report The Report Shall Include Finding Conclusion And Recommendation Consultant Shall Also Collect All Supporting Document Include Legal Documents Of The Allocated Buildings And Sidewalks Street Median To Check Feasibly Of Implementation 2 1 2 Conceptual DesignThe Consultant Shall Prepare Conceptual Designs For Presentation During The Course Of Phase I To The Eiip Team For Discussion The Conceptual Drawing Shall Include But Not Limited To Architectural Structural Mechanical And Electrical Etc The Drawing Shall Also Include Plans Sections And Elevations Where Required The Concept Should Be Based On The Municipality Of Beirut Requirements And Common Practices In Lebanon The Eiip Team Might Request Several Options From The Consultant In Order To Decide Which Concept To Adopt 2 1 3 Preliminary Cost EstimateThe Consultant Shall Prepare Compile And Present To The Eiip The Preliminary Cost Estimate For The Project The Consultant Shall Make Sure That The Total Price Estimate Does Not Exceed The Proposed Budget 2 1 4 Final Preliminary ReportAt The End Of This Phase I The Consultant Shall Prepare And Submit A Final Preliminary Report Describing The Findings Conclusions And Recommendations All Condition Assessments Surveys Studies Shall Be Attached To The Data Collection Report 2 2 Phase Ii Detailed Design Boq Confidential Cost Estimate And Technical SpectificationsAccording To The Physical Condition Assessment Survey And The Recommendations The Consultant Shall Develop The Detailed Design For The Above Mentioned Buildings And The Sidewalks Street Medians This Includes Architectural Drawing Structural Drawing Mep Drawing Technical Reports Drawings Boq And Confidential Cost Estimate This Phase Ii Shall Include The Following Components 2 2 1 Detailed Design Drawings For ExecutionBased On The Conceptual Design Approved In Phase I By The Eiip The Consultant Is Required To Prepare Appropriate Detailed Design To Be Implemented The Design Should Be Composed Of Drawings Including But Not Limited To General Layout Plan And Floor Plans Cross Sections And Elevations Architectural Drawings Structural Drawings Mep Drawings For The Buildings Layout Plans And Details For Electrical Lighting Fire Alarm Plumbing Water Storage Heating Air Conditioning And Ventilation Fire Protection For The Building Cross Sections And Details As May Be Necessary For The Understanding Of The Design And Its Prospects Details Such As Doors Accessories Windows Stairs Handrails And Other Items For The Building Detail Layout Of Landscaping For The Sidewalk Street Median The Design Must Be Appropriate For Implementation Using A Local Resource Based Approach I E Design And Specifications Should Be Appropriate For The Use Of Manual Labour And Local Resources The Selected Consultancy Firm Must Therefore Participate In An Orientation Session Provided By The Ilo At The Start Of The Assignment The Consultant Shall Obtain Approval For The Final Designs From The Municipality Of Beirut And The Ministry Of Public Works The Consultant Shall With The Support Of The Municipality Of Beirut And The Ministry Of Public Works Obtain Approval For The Final Designs From The Relevant Ministries If Required 2 2 2 Detailed Boq Confidential Cost Estimate The Boq And Cost Estimate Shall Be Prepared Based On The Labour Based Approach All Quantities Calculations Shall Be Submitted Along With The Boq The Consultant Shall Make Sure That The Total Price Estimate Does Not Exceed The Pr

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail