View Changes This Request For Proposal Rfp Solicits Construction Of Sof Operations Facility The Scope Of Work Includes Construction Of Administrative Mission Planning Areas Vehicle Bays Climate Controlled Pallet Storage With Lift Petroleum Oil And Lubricants Storage Arms Vaults Individual Unit Caged Storage Engineering Workshops Latrines With Lockers And Laundry Also Includes Space For A Secure Compartmentalized Information Facility With Administrative Area 50 Person Classroom Operations Center And Special Access Programs Project Will Also Provide Fire Alarm Mass Notification Fire Suppression System Telephone And Advanced Unclassified And Classified Communications Networks Intercom System Closed Circuit Surveillance And Electronic Access Control Systems Integrated Commercial Intrusion Detection System Cable Tv A Protected Distribution System And Connection To The Energy Management Control System Department Of Defense Dod Principles For High Performance And Sustainable Building Requirements Will Be Included In The Design And Construction Of The Project In Accordance With Federal Laws And Executive Orders Low Impact Development Features Will Be Included In The Design And Construction As Appropriate Supporting Facilities Include Site Development Utilities And Connections Lighting Lightning Protection System Walks Curbs And Gutters Vehicle Parking Access Road Bus Access Area Storm Drainage Landscaping Fencing And Other Site Improvements Utility Connections Require Long Runs To The Remote Project Site Heating And Air Conditioning Will Be Provided By Self Contained Systems Measures In Accordance With The Dod Minimum Antiterrorism For Buildings Standards Will Be Provided Facilities Will Be Designed To A Minimum Life Of 40 Years In Accordance With Applicable Unified Facilities Code Criteria Including Energy Efficiencies Building Envelope And Integrated Building Systems Performance Comprehensive Building And Furnishings Related Interior Design Services Are Required Electronic Security Systems And Audio Visual Services Are Included Cybersecurity Measures Will Be Incorporated Into This Project Sustainability Energy Measures Will Be Provided Access For Persons With Disabilities Will Be Provided Amendment 1 The Purpose Of This Amendment Is To Incorporate Clauseby Full Text Vice By Reference Amendment 2 The Purpose Of This Amendment Is To Provide A Technical Summary Of Changes And Revised Specifications Amendment 3 The Purpose Of This Amendment Is To Provide Revised The Technical Summary Of Changes And Therevisedspecifications Amendment 4 The Pupose Of This Amendment Is To Provide The Revised Technical Summary Of Changes And The Revised Specification Also To Extended The Proposal Due Date
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.