Cgc Hollyhock Repair And Clean 2 Generator

Tender Detail

35626604
70Z08521QP4552000
Self Funded
Cgc Hollyhock Repair And Clean 2 Generator
ICB
Northern America
Asia-Pacific Economic Cooperation, APEC,G20
16-12-2020

Work Detail

This Is A Combined Synopsis Solicitation For Commercial Items Prepared In Accordance With The Format In Far Subpart 12 6 As Supplemented With Additional Information Included In This Notice This Announcement Constitutes The Only Solicitation Quotations Are Being Requested And A Written Solicitation Will Not Be Issued This Request For Quotations Incorporates Provisions And Clauses In Effect Through Federal Acquisition Circular 2005 84 Dated Nov 1 2015 All Responsible Sources May Submit Proposals That Will Be Considered By The Agency The Contract Will Be Awarded On A Firm Fixed Price Basis Using Simplified Acquisition Procedures In Accordance With Far Part 13 5 Past Performance Will Be Considered In The Selection Of The Awarded Vendor The United States Coast Guard Surface Force Logistics Center Has A Requirement For The Following 31120 Rad 0919 Flt Rec 31120 Flt 225 Wlb B Class 1111 Work Item 1 Ship Service Diesel Generator Clean Amp Inspect 1 Scope 1 1 Intent This Work Item Describes The Requirements For The Contractor To Inspect Recondition And Test In Place The No 1 Ship Service Diesel Generator Ssdg 1 2 Government Furnished Property None 2 References Coast Guard Drawings Coast Guard Drawing 225B Wlb 201 2 Rev C Access Removal Routes Coast Guard Publications Coast Guard Technical Publication Tp 3537B Manufacturer s Instruction Book Swbs Group S 310 Surface Forces Logistics Center Standard Specification Sflc Std Spec 0450 2018 Electrical Power For Contractor S Tools Amp Equipment Surface Forces Logistics Center Standard Specification Sflc Std Spec 3100 2018 Inspect Test And Recondition Ac Synchronous Machines In Place Other References American National Standards Institute Ansi Easa Ar100 2015 Recommended Practice For The Repair Of Rotating Electrical Apparatus 3 Requirements 3 1 General The Contractor Shall Inspect Recondition And Test In Place The Ship Service Diesel Generator Ssdg In Accordance With Sflc Std Spec 3100 Using Ansi Easa Ar100 2015 Instead Of Ar100 2010 As Referenced Generator Data Is Shown In Table 1 Below Table 1 Generator Data Quantity Characteristics Manufacturer Location 1 450 Kw 450 Vac 60 Hz 3 Phase 1200 Rpm 0 8 Power Factor Caterpillar Engine Room 3 1 1 Cir The Contractor Shall Submit A Cir For The Inspections Listed In The Following Paragraph S None 3 1 2 Tech Rep The Contractor Shall Provide The Services Of A Qualified Technical Representative Who Is Familiar With Ac Synchronous Machine Repair To Accomplish The Following On Site Advise On Manufacturer s Proprietary System Information Assist With The Removal Installation Repair And Overhaul In Accordance With Ansi Easa Ar100 Ensure Compliance With Manufacturer s Procedures And Ansi Easa Ar100 Standards During System Disassembly Inspection And Reassembly As Applicable Witness The Performance Of All Tests Inspections And Cleaning Operations Performed Under This Specification 3 1 2 1 Ensure The Tech Rep Has Experience With The System Equipment Stated Above And Demonstrated On Their R sum And Is Employed By A Shop That Is A Member Of The Electrical Apparatus Service Association Easa 3 1 2 2 Submit The Name And R sum Of The Tech Rep To The Cor At The Arrival Conference 3 1 3 Protective Measures The Contractor Shall Furnish And Install All Protective Coverings To Seal Off And Protect All Non Affected Vessel s Components Equipment And Spaces In The Vicinity Of The Work Area Against Contamination During The Performance Of Work Upon Completion Of Work Remove All Installed Protective Measures Inspect For The Presence Of Contamination And Return All Contaminated Equipment Components And Spaces To Original Condition Of Cleanliness 3 1 4 Interferences The Contractor Shall Handle All Interferences In Accordance With Sflc Std Spec 0000 Paragraph 3 3 5 Interferences 3 2 Requirements The Contractor Shall Accomplish All Work Detailed In Sflc Std Spec 3100 With The Exception Of The Following Unless A Change Request Has Been Authorized And Released By The Ko 3 2 1 Bearing Wear The Contractor Shall Not Measure And Record Bearing Wear In Accordance With Sflc Std Spec 3100 Section 3 2 3 6 Bearing Wear 3 2 2 Collector Rings The Contractor Shall Not Measure And Record Collector Ring Wear And Concentricity In Accordance With Sflc Std Spec 3100 Section 3 2 3 7 Collector Ring Wear And Concentricity 3 2 3 Rotor Extraction The Contractor Shall Not Remove The Rotor For Cleaning Within The Compartment In Accordance With Sflc Std Spec 3100 Section 3 2 3 8 Rotor Removal 3 2 4 Installed Prime Mover The Contractor Shall Not Use The Installed Prime Mover E G Engine Or Barring Gear To Spin The Rotor While Circulating Current Through The Field Windings During Drying Operations 3 3 Insulation Treatment The Contractor Shall Touch Up Thin And Bare Spots On The Cleaned Windings With An Air Drying Varnish In Accordance With Sflc Std Spec 3100 3 3 2 Insulation Treatment 3 4 Utility Services The Contractor S Use Of Coast Guard Utility Services Both Afloat And Ashore Is Restricted As Follows For Performance Of This Work Item 3 4 1 Electrical Power The Contractor S Use Of Electrical Power For Temporary Tools And Equipment Used To Accomplish This Work Item Shall Comply With Sflc Std Spec 0450 When No Other Power Source Options Are Practicable Such Loads May Be Energized From A Temporary Generator Located Afloat Or Ashore In Accordance With Appendix E Of Sflc Std Spec 0450 3 4 1 1 Dockside Equipment Power Solely For Dockside Tools And Equipment May Be Taken From The Dockside Electrical Power Distribution System In Accordance With Appendix A Preferred Of Sflc Std Spec 0450 Or From The Shipboard Electrical Power Distribution System In Accordance With Appendix D Of Sflc Std Spec 0450 3 4 1 2 Shipboard Equipment Power Solely For Shipboard Tools And Equipment May Be Taken From The Ship Service Electrical Distribution System In Accordance With Appendix B Preferred Of Sflc Std Spec 0450 Or From The Dockside Electrical Power Distribution System In Accordance With Appendix C Of Sflc Std Spec 0450 3 4 2 Potable Water The Contractor S Use Of Hot And Cold Potable Water May Be Obtained From Shipboard Systems Cold Potable Water May Be Obtained From Dockside Connections 3 4 3 Compressed Air The Contractor S Use Of Compressed Air For Tools And Generator Hand Cleaning May Be Taken From The Ship Service Air System Air That Is To Be Blown Into A Generator Shall Be Filtered For Particulate Water And Oil Prior To Discharge 3 5 External Heating The Contractor Shall Apply External Heat Following Cleaning To Dry Out The Windings The Heater Power Rating Will Vary With The Amount Of Equipment To Be Dried Degree Of Enclosure And Amount Of Ventilation The Estimate In Table 2 Below Assumes That No Heat Is Lost By Radiation Or By Forced Or Natural Convection Consequently The Input Power Rating Should Be Increased By A Few Kilowatts To Compensate For Heat Losses 3 5 1 The Contractor Shall Limit Heat Input So That Winding Temperatures Do Not Increase More Than 20 F Per Hour 3 5 2 The Contractor Shall Not Exceed A Winding Temperature Of 167 F Table 2 External Heating Data Machine Weight Lbs Heater Power Heatup Rate F H Temperature Rise F Duration H Kw Btu H 5 651 3 9 13 306 20 107 5 4 4 Notes 4 1 Conditional Performance This Work Item Is Performed Only When Warranted By The Condition Of The Generator Windings The Mere Presence Of Dust Is Not Sufficient Justification To Perform This Work Item 4 1 1 Note That There Is Some Risk That Solutions Used During The Cleaning Process May Penetrate Through Microscopic Cracks In The Varnish Carrying Contaminants Deeper Into The Windings Through Capillary Action Once So Embedded Such Contamination Cannot Be Removed And Insulation Resistance Could Actually Be Degraded Such That A Costly And Time Consuming Rewind Would Be Necessary 4 1 2 Cleaning Is Normally Only Warranted When The Windings Have Been Wetted By Sea Water Or Insulation Resistance Trends Suggest That The Machine Will Fall Below The Minimum Acceptable Insulation Resistance For Operation Before The Next Depot Level Availability 4 2 Shop Cleaning This Generator Is Rotor Only Removable From The Vessel Without Making A Hull Cut See Cg Drawing 225B Wlb 201 2 For Rigging Path To Weather Including Any Bolted Berp Or Welded Werp Equipment Removal Plates That Must Be Removed For Machines That Can Be Removed From The Vessel Through Existing Accesses Or Openings Created By Other Work Items It Is Generally Quicker And More Cost Effective To Offload The Affected Generator From The Vessel And Perform The Work Ashore In A Generator Repair Shop Such Tasking Should Be Performed Under Ship Service Diesel Generator Overhaul And Not This Work Item Part 2 31121 Rad 1020 Flt Rec 31120 Flt 225 Wlb B Class 1111 Work Item 1 No 2 Ship Service Diesel Generator Overhaul Apm Do Not Edit Any Part Of The Work Item Title 1 Scope 1 1 Intent This Work Item Describes The Requirements For The Contractor To Overhaul The No 2 Ship Service Diesel Generator Ssdg Ashore In A Suitable Repair Facility 1 2 Government Furnished Property None 2 References Coast Guard Drawings Coast Guard Drawing 225B Wlb 201 2 Rev C Access Removal Routes Coast Guard Publications Coast Guard Technical Publication Tp 3537B Manufacturer s Instruction Book Swbs Group S 310 Surface Forces Logistics Center Standard Specification Sflc Std Spec 3101 2018 Overhaul Ac Synchronous Machines Other References American National Standards Institute Ansi Easa Ar100 2015 Recommended Practice For The Repair Of Rotating Electrical Apparatus 3 Requirements 3 1 General The Contractor Shall Overhaul The No 2 Ship Service Diesel Generators Ashore In A Suitable Repair Facility In Accordance With Sflc Std Spec 3101 Using Ansi Easa Ar100 2015 Instead Of Ar100 2010 As Referenced The Recommended Rigging Path When Known Is Shown In The Drawing Referenced Above Generator Data Is Shown In Table 1 Below 3 1 1 Cir None 3 1 2 Tech Rep The Contractor Shall Provide The Services Of A Qualified Technical Representative Who Is Familiar With Ac Synchronous Machine Repair To Accomplish The Following Advise On Manufacturer s Proprietary System Information Assist With The Removal Installation Repair And Overhaul In Accordance With Ansi Easa Ar100 Ensure Compliance With Manufacturer s Procedures And Ansi Easa Ar100 Standards During System Disassembly Inspection And Reassembly As Applicable Witness The Performance Of All Tests Inspections And Cleaning Operations Performed Under This Specification 3 1 2 1 Ensure The Tech Rep Has Experience With The System Equipment Stated Above And Demonstrated On Their R sum And Is Employed By A Shop That Is A Member Of The Electrical Apparatus Service Association Easa 3 1 2 2 Submit The Name And R sum Of The Tech Rep To The Cor At The Arrival Conference 3 1 3 Protective Measures The Contractor Shall Furnish And Install All Protective Coverings To Seal Off And Protect All Non Affected Vessel s Components Equipment And Spaces Near The Work Area Against Contamination During The Performance Of Work Upon Completion Of Work The Contractor Shall Remove All Installed Protective Measures Inspect For The Presence Of Contamination And Return All Contaminated Equipment Components And Spaces To Original Condition Of Cleanliness 3 1 4 Interferences The Contractor Shall Handle All Interferences In Accordance With Sflc Std Spec 0000 Paragraph 3 3 5 Interferences Known Interferences Include But Are Not Limited To The Following Air Ducting Removable Handrails Qawtds Along The Removal Route Electrical Wiring 3 2 Removal The Contractor Shall Remove The No 2 Generator Assembly To Be Worked Ashore In Accordance With Section A 2 1 Of Appendix A Of Sflc Std Spec 3101 See Cg Drawing 225B Wlb 201 2 For Rigging Path To Weather Including Any Bolted Berp Or Welded Werp Equipment Removal Plates That Must Be Removed 3 2 1 Coast Guard Personnel Shall Use The Shipboard Crane To Hoist And Transit The No 2 Generator Assembly Through The Designated Access Route 3 2 2 Operation Of Coast Guard Equipment And Machinery Shall Be Performed By Shipboard Personnel 3 2 3 Disassembly Of The No 2 Generator May Be Necessary In Order To Remove The Machinery Without A Hull Cut 3 3 Initial Inspection The Contractor Shall Perform The Initial Inspection And Tests Of Section 3 3 Of Sflc Std Spec 3101 Submit A Cfr 3 4 Shop Work The Contractor Shall Transfer The Generator To An Ansi Certified Subcontractor To Perform The Work In Accordance With Appendices Of Sflc Std Spec 3101 As Follows 3 4 1 Reconditioning The Subcontractor Shall Recondition The No 2 Generator Per Appendix B Insulation Treatment Shall Be Of Temperature Class F Or Better And Not Less Than The Temperature Class Of The Existing Insulation System 3 4 2 Rewinding Rewinding Per Appendix C Is Not Expected To Be Necessary But May Become The Subject Of A Change Order If Reconditioning Efforts Are Unsuccessful Varnish May Be Applied To New Windings Using The Vacuum Pressure Impregnation Vpi Method Insulation Treatment Shall Be Of Temperature Class F Or Better And Not Less Than The Temperature Class Of The Existing Insulation System 3 4 3 Miscellaneous Repairs The Contractor Shall Perform Or Otherwise Delegate To The Ansi Certified Subcontractor The Following Miscellaneous Repairs In Accordance With The Applicable Appendix D Section Listed In Table 2 Of Sflc Std Spec 3101 D2 3 Bearing Housing D2 4 Bearings D2 5 Journals D2 7 Leads 3 5 Balancing The Subontractor Shall Dynamically Balance Each Rotor Assembly Per Section 3 4 4 Of Sflc Std Spec 3101 Submit A Cfr 3 6 Reassembly The Subontractor Shall Reassemble Each Machine Per Section 3 4 5 Of Sflc Std Spec 3101 For Exciter Armature Rotor L2 Bolts On Caterpillar Sr4 Generators Apply Thread Locking Compound Per Caterpillar Service Manual Form No Senr3985 Contained Within The Generator Technical Publication And Tighten 5 16 Inch Bolts To 26 Lb Ft And 3 8 Inch Bolts To 41 Lb Ft 3 7 Shop Acceptance Testing The Subontractor Shall Accomplish The Shop Acceptance Tests Of Section 3 5 Of Sflc Std Spec 3101 Submit A Cfr 3 8 Final Assembly The Subontractor Shall Complete Reassembly Work Per Section 3 6 Of Sflc Std Spec 3101 3 9 Packaging The Subontractor Shall Package Each Reassembled Machine Per Section 3 7 Of Sflc Std Spec 3101 3 10 Reinstallation The Contractor Shall Reinstall The Generators Or Assemblies That Were Worked Ashore In Accordance With Section A 2 2 Of Appendix A Of Sflc Std Spec 3101 3 11 Final Acceptance Testing The Contractor Shall Accomplish The Final Acceptance Tests Of Section A 2 3 Of Appendix A Of Sflc Std Spec 3101 Submit A Cfr Table 1 Generator Data Quantity Characteristics Manufacturer Location 1 450 Kw 450 Vac 60 Hz 3 Phase 1200 Rpm 0 8 Power Factor Caterpillar Engine Room 4 Notes 4 1 Conditional Performance This Work Item Is Performed Only When Warranted By The Condition Of The Generator Windings Rewinding Would Typically Be Performed No More Than Once During The Lifetime Of The Vessel 4 1 1 This Generator Is Rotor Only Removable From The Vessel Without Making A Hull Cut 4 1 2 For Large Machines Extensive Interference Removal And A Hull Cut May Be Necessary To Remove A Generator In Some Cases It May Be Simpler And More Cost Effective To Perform Repairs Afloat A Competent Repair Shop Experienced With Large Generators Should Be Consulted Early In The Planning Process To Help With Such An Assessment Interested Vendors Please Send Official Quote With A Sam Gov Registered Duns Number And Email To Anthony J Andaluz Uscg Mil Cost Breakdown Of Quote Including But Not Limited To Labor Cost Per Hour And Materials Is Required

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail