Tenders Are Invited For Replacement Repairing Of Damaged Parts Lpg Gas System

Tender Detail

35225435
2332002543
Self Funded
Tenders Are Invited For Replacement Repairing Of Damaged Parts Lpg Gas System
ICB
Western Asia
Arab World,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
06-12-2020

Work Detail

Quotation Are Invited For Replacement Repairing Of Damaged Parts Lpg Gas System Replacement Repairing Of Damaged Parts Lpg Gas System At Dewa Various Location Replace Test Commissioning Of The Damaged Lp G Gas Detector Scope Of Work The Existing Amc Contractor Should Visit The Sites And Check The Requirement And To Quote Accordin Gly The Contractor Shall Replace Test Commissioning Of The Damaged Lpg Gas Detector As Per Boq The Contractor Shall Replace Test Commissioning Of The Damaged Lpg Gas Emergency Switch The Contractor Shall Replace Three Pieces Of 3 4 Ball Valve Six N Umbers Of Ball Valve Four Numbers 230V Detector One Number Of Emergency Switch Steel Housing As Per Staff Kitchen Requirement A Nd Cabling Existing Damaged Equipment Shall Be Dismantled With Safe Handing Over To Presence Of Dewa Maintenance Team And Shall S Upply And Replace Of New Proposed And Approved Parts Into The Existing Place With Necessary Fitting And Arrangements All Componen Ts Shall Be Constructed Or Manufactured Out Of High Quality Corrosion Resisting Material Painting Requirement For Spare Parts Shall Be Identical To Those For Original Installed Parts Where No Painting Or Protective Coating Is Specified Suitable Provision Shall Be Made To Protect Against Corrosion Work Schedule And Details Should Be Provided In Advance With Method Statement For Approval All The Material In General Will Confirm As Per Latest Standards And Shall Be Submitted To Dewa For Engineers Approval Guarante Es Contractor Shall Provide A Written Undertaking To Warranty The Performance Of The Materials As Follows A Written Warranty For 3 Years On Site Replacement Material Workmanship And Finish On Site Replacement Includes Removal Transportation To Site Of New Materials And Installation General Conditions The Contractor At Dewa Work Premises Shall Follow Dewa Safety Environment Policy Rules And Regulations During The Contract Period The Contractor Shall Carry Out Risk Assessment For All His Works This Risk Assessment Shall Be From Safety As Well As Occupational Health Considerations Dewa Format To Be Used Toolbox Talks Shou Ld Be Given To The Workmen By Their Supervisor Copy Of Which Shall Be Given To Dewa No Welding Flame Heating Or Cutting Grind Ing Pneumatic Chipping Etc Shall Be Carried Out Without Specific Clearance From Dewa Through Hot Work Permits The Hot Work Per Mit If Required Shall Be Obtained On Daily Basis The Contractor Shall At No Time Keep Inflammable Substances In The Plant Work A Reas All Hazardous Wastes Shall Be Moved Under Direction From And With Written Approval To Dewa Special Storage Area The Con Tractor S Work Will Fall Within The Purview Of Safety Surveys Conducted Regularly By The Dewa Safety Section All The Workmen Should Wear Necessary Ppes Like Uniform Safety Shoes And Helmet While At Work All Cranes Vehicles Special Tools Of Contractor Shall Be Inspected And Tested By Capable Authorities And Contractor Shall Provide Dewa With Copy Of Certificates Of Their Fitness Before Their Use At Site All Equipment Like Rigging Tools Grinding Machines Drilling Machines Hand Tools Precision Tools With All V Alid Test Certificates From 3Rd Party Licensed Certifying Agencies Shall Be Produced By The Contractor Erection Use Of Scaffol Ding Use Of Lifting Trolleys Shall Be Certified By Dewa Authorized Personnel And Shall Be Supervised By Contract Supervisor Before Executing The Job On Site On A Written Application With Relevant Particulars Of The Staff And Vehicles Of The Contractor Dewa W Ill Issue Temporary Entry Passes For Them Valid Up To The Period Of Contract Work The Contractor Shall Apply For The Entry Passes F Or Entire Duration Of The Contract 3 Days In Advance With A Xerox Copy Of Passport With Valid Visa 2 Passport Size Photographs And Identification Card Issued By The Company For Each Staff Additionally With A Copy Of Driving License For The Drivers And A Copy Of Valid Registration Certificate For The Vehicles No Staff Or Vehicles Of The Contractor Will Be Permitted To Stay In Dewa Premises After Close Of Work Of The Day Payment 100 On Satisfactory Complition Of Works Contact Person For Site Vists 1 Mr Obeid 0526973337 2 Mr Arif 0551961349 3 Mr Thomas 0557988468 Qty 10Replace Test Commissioning Of The Damaged Lpg Gas Emergency Switch Qty 10Standard Terms Conditions1 Prices Should Be Ddp Delivery Duty Paid At Dewa Stores 2 Quotation To Be Submitted Only In Local Currency U A E Dirhams3 Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material4 No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company And Your Participation In Dewa Tenders Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail