C1dz A E Construction To Replace Roof 2 Project 502 21 105

Tender Detail

35200125
36C25621R0031
Self Funded
C1dz A E Construction To Replace Roof 2 Project 502 21 105
ICB
Northern America
Asia-Pacific Economic Cooperation, APEC,G20
29-12-2020

Work Detail

36C25621r0031 Contract Information General A E Services Are Being Procured In Accordance With The Selection Of Architects And Engineers Statute Public Law 92 582 Formerly Known As The Brooks Act And Implement In Federal Acquisition Regulation Far 36 6 All Submissions Will Be Evaluated In Accordance With The Evaluation Criteria The Government Will Not Pay Nor Reimburse Any Costs Associated With Responding To This Request The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement Firms Will Be Selected Based On Demonstrated Competence And Qualifications For The Required Work The Naics Code For This Acquisition Is 541310 And The Applicable Small Business Size Standard Is 7 5M Contract Award Procedure The Proposed A E Services Will Be Obtained By A Negotiated Firm Fixed Price Contract Interested Parties Shall Ensure Current Licensing And Have A Current Registration In The System For Award Management Sam Database At Https Www Sam Gov And The Vendor Information Pages Database At Http Www Va Gov Osdbu Well As Have Submitted The Current Cycle Vets 4212 Report Http Www Dol Gov Vets Programs Fcp Main Htm For Contracts In The Amount Of 150 000 Or More The Sam Clause At Far 52 204 7 Changed Effective Oct 2018 And Now Requires That Offerors Be Registered In The Sam Database At The Time An Offer Is Submitted And At The Time Of Contract Award According To Far 52 204 7 Registered Means Among Other Things That The Record In Sam Be Marked As Active Therefore Failure Of A Proposed Sdvosb To Be Registered At The Time The Sf 330 Is Submitted And At The Time Of Contract Award Shall Result In Elimination From Consideration As A Proposed Contractor Sdvosb Requirements In Accordance With Va Notice Of Total Service Disabled Veteran Owned Small Business Set Aside A Service Disabled Veteran Owned Small Business Concern Agrees That In The Performance Of The Contract At Least 50 Percent Of The Cost Of Personnel For Contract Performance Will Be Spent For Employees Of The Concern Or Employees Of Other Service Disabled Veteran Owned Small Business Concerns C Design Costs All Offerors Are Advised That In Accordance With Vaar 836 606 73 The Total Cost Of The Architect Or Engineer Services Contracted For Must Not Exceed 6 Percent Of The Estimated Cost Of The Construction Project Plus Any Fees For Related Services And Activities Additionally Far 52 236 22 Design Within Funding Limitations Will Be Applicable To This Procurement Action Design Limitation Costs Will Be Provided To The Most Highly Rated Ae Firm Selected To Complete The Design The Magnitude For Construction Not Design Of This Project Is Between 2 000 000 And 5 000 000 Selection Criteria The Selection Criteria For This Acquisition Will Be In Accordance With Far 36 602 1 And Vaam M836 602 1 And Are Listed Below In Descending Order Of Importance The Completed Sf 330 Will Be Evaluated By The Alexandria Health Care System Evaluation Board In Accordance With Far 36 602 5 A And The Selection Report Shall Serve As The Final Selection List Which Will Be Provided Directly To The Contracting Officer Professional Qualifications Necessary For The Satisfactory Performance Of Required Services Far 36 602 1 A 1 Provide Key Personnel It Is Expected That The Individuals Identified As Key Personnel Will Be Performing Tasks Under The Resulting Contract Include Resumes For Key Personnel Of Proposed Sub Consultants For All Engineering Disciplines Electrical Data Communication Mechanical Civil Structural Environmental Interior Design Leed Commissioning And Cost Estimating Specialized Experience And Technical Competence In The Type Of Work Required Including Where Appropriate Experience In Energy Conservation Pollution Prevention Waste Reduction And The Use Of Recovered Materials Far 36 602 1 A 2 Experience In Construction Period Services To Include Professional Field Inspections During The Construction Period Review Of Construction Submittals Support In Answering Requests For Information During The Construction Period And Support Of Construction Contract Changes To Include Drafting Statements Of Work And Cost Estimates Vaam M836 602 1 6 Ii Past Performance On Contracts With Government Agencies And Private Industry In Terms Of Cost Control Quality Of Work And Compliance With Performance Schedules Far 36 602 1 A 4 Be Sure To Include All Past Performance Department Of Veterans Affairs Include Knowledge Of Va Design Standards Technical Manuals And Specifications Provide No More Than Five 5 Recent Projects Capacity To Accomplish The Work In The Required Time Maintaining Project Schedules And Project Budgets Cost Control Effectiveness And Estimating Accuracy Far 36 602 1 A 3 Location In The General Geographical Area Of The Project And Knowledge Of The Locality Of The Project Provided That Application Of This Criterion Leaves An Appropriate Number Of Qualified Firms Given The Nature And Size Of The Project Far 36 602 1 A 5 The Extent To Which Potential Contractors Identify And Commit To The Use Of Service Disabled Veteran Owned Small Businesses Veteran Owned Small Businesses And Other Types Of Small Businesses As Subcontractors Vaam M836 602 1 6 I A Submittal Requirement This Project Is A 100 Set Aside For Service Disabled Veteran Owned Small Business Sdvosb Concerns Under Vaar 852 219 10 Va Notice Of Total Service Disabled Veteran Owned Small Business Set Aside Dec 2009 All Original Standard Form Sf 330 Packages Shall Be Submitted To Alexandria Va Health Care System Network Contracting Office Nco 16 Attn Gina Roach Co 2495 Shreveport Highway 71 Room 212A Pineville La 71360 A All Sf 330 Submissions Shall Be Clearly Marked With The Subject Line Displaying The Solicitation Number 36C25621r0031 The Sf 330 Form May Be Downloaded From Www Gsa Gov Forms Completed Sf 330 S Shall Include The Primary Firms Subcontractor Firms And Any Consultants Expected To Be Used On The Project B Firms That Meet The Requirements Listed In This Announcement Are Invited To Submit Four 4 Copies Of The Completed Sf 330 Including Parts I And Ii As Described Herein And One Cd Rom Of The Sf 330 Submittal As A Single Pdf File To The Above Address No Later Than 10 00 A M Cst On Tuesday December 29 2020 Fax And Or E Mail Submissions Will Not Be Accepted Late Proposal Rules Found In Far 15 208 Will Be Followed For Late Submittals C Interested Firms Shall Address Each Of The Seven 7 Selection Criteria In Their Sf 330 S And Additional Documents Submittals This Is Not A Request For Proposal There Are No Solicitation Documents Available This Is A Request For Sf 330 S Architect Engineer Qualifications Packages Only Any Requests For A Solicitation Will Not Receive A Response This Requirement Is Subject To Availability Of Funds Project Information A E Design Scope Of Work Replace Roof Building 2 Project 502 21 105 Va Health Care System Alexandria La 71360 Definition And Acronyms Pre Construction Risk Assessment Pcra Interim Life Safety Measures Ilsm Request For Proposal Rfp Certified Independent Third Party Safety Professional Citp National Fire Protection Association Nfpa The Joint Commission Tjc Facilities Condition Assessment Fca Competent Person Cp Contracting Officer S Representative Cor Central Energy Plant Cep General Requirements The Architectural Engineering Consultant A E Shall Provide All Architectural And Engineering Services Necessary To Prepare Complete Contract Documents Consisting Of Specifications Drawings And Any Other Documents For Bidding Purpose And A E Construction Period Services For Preparation Of Construction Documents Cost Estimates And Other Items As Indicated To Accomplish The Replacement Of The Roof And Gutters For Building 2 Ae Must Consider That The Replacement Of The Roof And Gutters May Result In Revisions To Supporting Structural Components Work Shall Include But Is Not Limited To The Above Detailed Requirements Which Are To Be Considered A Basic Part Minimum Requirement Of This Project And Shall Be Fully Developed By The A E Discussed And Resolved With Alexandria Va Health Care System Staff The A E Shall Schedule And Conduct An Initial Pre Design Meeting And Field Visit With The Va Personnel Consisting Of Engineering Personnel Safety Officer And Other Va Personnel As Necessary The Purpose Of This Meeting Field Visit Is For All Parties Involved To Fully Define And Understand The Scope Of Work Necessary For The A E To Design And Prepare Contract Documents Consisting Of Plans And Va Specifications For The Replacement Of The Building 2 Roof And Gutters At Least Two Additional Site Visits Are Necessary During The Design Phase The Existing Roof Will Be Removed In Its Entirety The Roof Has 3 Large Sections Two Flat Roof Sections And One Clay Tile Section Existing Clay Tile That Is Undamaged Will Be Salvaged For Reuse Both From The Roof And The Sides Of The Dormers The Gutters Will Be Replaced And Downspouts Added Where Necessary Connecting To The Existing Rainwater Collection System New Windows Louvers Will Be Added To The Dormers As Needed The Corridors To Building One 1 Will Be Reroofed As Part Of This Project The Corridors To Building Three 3 Will Not Be Included In This Project The A E Shall Perform Any Other Necessary Investigative Work I E Meet With Or Communicate With Va Staff Regarding Design Layout The Design And Resulting Construction Must As A Minimum Be In Accordance With All Applicable Codes Nfpa Jcaho Nec Upc Umc Asme Ashrae Epa Controlled Environment Testing Association Ceta And Department Of Veterans Affairs Va Publications Master Construction Specifications Construction Standards Design Guides And Standards All Design And Work Will Conform To The Current Edition Of The Va Master Specifications And Va Design Standards As Published At The Following Site Www Cfm Va Gov Asme Ashrae Osha Ibc 2009 Ipc 2009 Imc 2009 Nfpa Aba Abaas Adaag And Nec Building Codes And Standards Building 2 Is On The Historic Register All Considerations Must Be Given To The Impact Design Will Have On The Historic Structure All Work Must Be Done In Accordance With The National Historic Preservation Act The Louisiana State Historic Preservation Officer La Shpo Is To Be Consulted To Ensure Compliance With The Act Survey Report Will Be Generated 2 Weeks After Ntp Investigative Work The A E With The Aid Of Va Staff Is To Perform All Necessary Testing And Investigative Work Required To Adequately Design The Project Utilizing As Built Drawings Provided By The Va And Design Staff Site Visits The A E Will Investigate Scope Of Required New Construction The A E Shall Develop Execute And Demonstrate That The Project Plans And Specifications Have Gone Through A Rigorous Review And Coordination Effort The A E Shall Provide An Outline Of The Actions That The Firm Will Take During The Design Process To Ensure A Quality Finished Design Is Achieved Design Consideration Design Shall Include But Is Not Limited To The Following Va Specification Guidelines Construction Drawings Construction Cost Estimate Ashrea Design Considerations Other Necessary Design Considerations Historic Preservation Considerations Design Requirements The Architectural Engineering Consultant A E Shall Provide All Architectural And Engineering Services Necessary To Prepare Complete Contract Documents Consisting Of Specifications Drawings And Any Other Documents For Bidding Purposes And A E Construction Period Services To Include But Not Limited To The Following Replace The Building 2 Roof And Gutters At Vamc Alexandria La The Project Includes General Re Design And Removal Of Existing Roof And Gutters Tiles Will Be Salvaged And Reused Where Possible On The Clay Tile Roofing Areas The Roof Has Three Main Areas And A Connector Between Buildings That Will Be Re Roofed These Include The Clay Tile Portion And Two Flat Portions One South And One North Please See Attached Drawing All Drains Inside From Roof To Floor Reseal Any Penetrations Or Cracks Expansion Joints Seals Leaks Abuttment Joints Etc Any Points For Water Infiltration Gutters Flashing To Be Copper Per Shpo Guidelines Flashing Replacement Decking Water And Ice Shields Etc Survey Report 2 Weeks After Ntp Flat Roof Areas Will Be Replaced With Tpo Roofing All Work Must Adhere To Shpo Guidelines Bldg 2 Was Built In 1929 And Has Approximately 59 000 Gross Sq Ft The Design Will Include Removal Of The Existing Roof Replacement Of Roofing Materials And Of The Roof Shingles Currently There Are Terracotta Clay Roofing Tiles Replacement With Anything Other Than Clay Tiles Will Require The Approval Of Shpo Shpo Must Be Notified Prior To Any Work This Is An Occupied Office And Medical Building This Project Will Require Phasing The Construction To Minimize The Disruptions To The Va Medical Center The A E Will Evaluate The Entire Project And Make Recommendations How To Phase The Roof Replacement This Contract Will Provide For Complete Site Investigation Design Construction Documents Construction Period Services Cps And Construction Site Visits A E Will Identify The Construction Time Periods For Shutdowns And Lengths On The Phasing Drawings Also Identify Construction That Will Be Required To Occur Outside Of Normal Operational Hours Monday Friday 8 00 A M 4 30 P M Schedule And Conduct An Initial Pre Design Meeting And Field Visit With The Va Personnel Consisting Of Engineering Personnel Safety Officer Maintenance And Operations And Other Va Personnel As Necessary The Purpose Of This Meeting Field Visit Is For All Parties Involved To Fully Define And Understand The Scope Of Work Necessary For The A E To Design And Prepare Contract Documents Consisting Of Plans And Va Specifications To Replace The Building 2 Roof Design For Roof Replacement Shall Include A Structural Analysis Of The Existing Structural Components That Will Support The New Roof Period Of Performance The Delivery Date For This Contract Shall Be 240 Days From Notice To Proceed Quality Assurance Quality Control Qa Qc The Design Offeror Or A E Shall Develop Execute And Demonstrate That The Project Plans And Specifications Have Gone Through A Rigorous Review And Coordination Effort The A E Shall Provide An Outline Of The Actions That The Firm Will Take During The Design Process To Ensure A Quality Finished Design Is Achieved Cost Estimate A Detailed Estimate Of Construction Cost Using Rs Means Cost Works And Market Study Survey Shall Be Provided With Each Design Submission Drawings This Project Will Utilize Autocad Version 2019 All Va Design Guides And Requirements Can Be Found Online At Http Www Cfm Va Gov Til Where Conflicts Occur Between Va Standards And Model Codes The Most Stringent Requirement Shall Govern All Drawings Must Be Bundled Using The E Transmit Function Utility Survey During The Design Phase The A E Will Coordinate With Va Staff To Obtain Utility Information To Facilitate The Design Otherwise What Is Not Obtained Shall Be Surveyed To Extent Necessary By The A E A E Shall Procure Any Services To Include But Not Limited To Any Applicable Utilities For Building 2 Roof Replace Required To Adequately Test And Determine The Capacity Of The Existing Utility System Asbestos The A E Shall Investigate The Construction Site To Verify Any Asbestos Containing Materials If Asbestos Is Encountered It Is The A E And Their Subcontractor S Responsibility To Adhere To All Va Osha Federal And State Regulations Of Acm Procedures Submittal Packages For The Asbestos Amp Indoor Air Quality Iaq Qualifications Shall Be Provided To The Va The Industrial Hygienist Ih Shall Perform Duties As Necessary By Monitoring Inspecting And Testing Inside Outside The Work Area In Accordance With Osha Requirements Asbestos Survey For This Building Is Available Upon Request But May Not Be Fully Inclusive Note Some Site Investigation Work May Be In Asbestos Contaminated Areas And Will Require The A E To Have Their Personnel Trained For Class 3 Asbestos Work Maintenance Amp Operations Within Asbestos Contaminated Areas Schematic Design Investigate And Survey Project Site Verify Any Va Provided Data Ae Is Responsible For Collecting All Data Required For The Design The A E Is Responsible For Measuring And Collecting Actual Field Data That May Be Required This Schematic Design Phase Is An Iterative Process And Requires Close Coordination With The Va Staff The Preliminary Schematic Design Layout Will Most Likely Require Tweaking Until A Final Plan Layout Is Officially Approved By The Hospital Dimensions Slopes Etc Will Need To Be Indicated On The Drawings Ae Shall Work With The Va Staff Until An Acceptable Project Specific Plan Has Been Developed And Approved In Writing By The Va Asbestos Abatement Survey During The Design Phase The A E Will Coordinate With Va Staff To Perform An Asbestos Abatement Survey To Facilitate The Design The Ae Shall Survey The Areas Of Conflict In Question To Incorporate Into The Design Documents Accordingly Hazardous Material Abatement Survey During The Design Phase The A E Will Coordinate With Alexandria Va Health Care System Staff To Perform A Hazardous Material Abatement Survey To Facilitate The Design The A E Shall Survey The Areas Of Conflict In Question To Incorporate Into The Design Documents Accordingly The A Amp E Shall Be Responsible For Surveying The Areas Of Work For Hazardous Material And Include The Abatement Of The Hazardous Material In The Design Documents There May Be Other Non Related Local Utilities That Need To Be Relocated Or Modified To Facilitate Renovation The A Amp E Shall Design Plans That Will Expedite The Construction Process Proper Construction Phasing Of Work With Time Limitations Shall Be Included Also The Replacements Shall Be Done Without Interrupting Hospital Operations Throughout The Entire Replacement Process A Report Of The Hazardous Material Finding Will Be Submitted With The 50 Design Submission Fire Protection Engineer Review Amp Certification The A E Shall Have The Design Plans And Specifications Reviewed By A Registered Fire Protection Engineer Fpe To Ensure The Design Proceeds In Accordance With Life Safety Code Lsc And Applicable National Fire Protection Association Nfpa Codes The Fpe S Review Comments Shall Be Provided Along With Each Design Submittal Starting With The 65 Design Development Drawings With The Final 100 Construction Documents Submittal Provide A Final Certification Letter From A Registered Fpe Stating That The Final Plans And Specifications Are In Compliance With The Current Lsc And Nfpa Codes Physical Security Amp Blast Design The Design Shall Be In Accordance With The Latest Edition Of The Physical Security Design Manual For Va Facilities Life Safety Protected Mission Critical Facilities As Applicable Handicap Accessibility The Design Will Be Required To Comply With The Uniform Federal Accessibility Standards Ufas Abaas Architectural Barriers Act Accessibility Standards And Pg 18 13 Barrier Free Design Guide In All Areas Commissioning The Construction And Intended Use Does Require Commissioning The A E Shall Incorporate The Va S Commissioning Specification Into The Design And Complete Set Of Construction Documents As Applicable The Construction Contractor Shall Procure The 3Rd Party Commissioning Agent To Oversee And Execute The Contract Required Commissioning Activities During Construction Government Furnished Information The Following Is A List Of Government Furnished Information Found On The Va S Technical Information Library Website Http Www Cfm Va Gov Til To Be Used For This Project As Applicable Pg 18 1 Master Construction Specifications Pg 18 3 Design And Construction Procedures Pg 18 4 Standard Details And Cad Standards Pg 18 10 Design Manuals By Discipline Pg 18 12 Design Guides Graphical By Function Pg 18 13 Barrier Free Design Guides Uniform Federal Accessibility Standards Ufas Abaas Architectural Barriers Act Accessibility Standards Physical Security Design Manual For Va Facilities Life Safety Protected Note Utilize The Latest Version Of Guidance At Time Of Design Award Submission Of Documents The Va Staff Shall Have A Minimum Number Of Calendar Days To Review And Coordinate Each A E Design Submissions Broken Down As Follows 35 Fifteen Days 15 65 Thirty Days 30 95 Twenty Days 20 100 Twenty Days 20 If The Va Workload Does Not Allow For A Thorough Review Within This Timeframe The A E Shall Not Proceed To The Next Design Phase Until Comments Have Been Received From The Va The Ae Will Be Entitled To A Time Only Contract Extension For The Number Of Va Review Days Beyond What Is Specified Above The Following Specifies The Documents Etc Required To Be Submitted By The Consultant To The Contracting Officer For Distribution For Each Scheduled Review And The Due Dates For Each Submission Dates Indicated Must Be Strictly Adhered To Working Drawings General The Architect Engineer Shall Design And Estimate So That All Applicable Codes Are Met The A E And Their Design Teams Will Be Required To Attend A 0 Pre Design Meeting With The Alexandria Va Health Care System Personnel To Outline The Scope Of The Design Project The A E Should Be Prepared To Walk Through The Work Site Take Pictures Ask Questions Take Measurements Review As Built Drawings And Va Specifications And Gather Any Other Pertinent Information Necessary To Fully Understand The Scope Of The Design Task The A E Will Also Be Required To Make A Formal Presentation At The 65 And 100 Reviews In Person The A E Shall Take Written Minutes Of The Pre Design Meeting And All Design Reviews In Which He Is In Attendance And Provide The Alexandria Va Health Care System With Them Within Two 2 Working Days The A E Shall Establish A Construction Schedule The A E Shall Prepare A List Of Equipment And Material Submittals Required By This Project As Separate Specification Section In The Contract Package In Each Submission The A E Shall Incorporate All Materials Procedures Etc Specified And All Revisions According To Comments Made By Either The Health Care System Regional Safety Amp Fire Protection Engineer Or Va Central Office Where Applicable 35 35 Design Submission Required Within Sixty 60 Calendar Days After Conclusion Of The 0 Design Meeting Submittal Letter Consultant Shall Provide A Submittal Letter Addressed To The Contracting Officer Stating Documents Submitted For 35 Review Specifications Consultant Shall Provide 2 Sets Of Edited Assembled And Technical Project Specifications To The Project Engineer To Be Used On This Project Marked Up Standard Specifications Are Acceptable The Most Current Va Master Specifications Shall Be Used On This Project And Are Available On Internet Http Www Cfm Va Gov Til Spec Asp Drawings Consultant Shall Provide A 2 Full Set Of Project Drawings Showing The Basic Plan For Each Discipline Involved This Shall Include All Drawings Developed For The Previous Reviews Shall Be Detailed Showing All Utilities Services And Sizes As Well As Other Required Construction Detail Show Complete Plan Views Elevation Views Photographs Legends And Other Schedule Information Also Show Complete Details Notes Sections And Locations Cost Estimate Consultant Shall Provide A Cost Estimate To Both The Contracting Officer And The Cor Engineer And Ensure That The Following Items Are Included Certification That The Quantities Have Been Checked And Found To Be Correct All Estimates Shall Be Based On The Most Up To Date Working Drawings Available And Shall Be Current As Of The Date Of Submission Materials Are Priced At The Contractor S Buying Level Sales Taxes When Applicable Will Be Added Into Material Costs Cost Totals Should Reflect Labor And Materials Separately And Should Be Formatted As Follows Totals Labor And Materials For All Branches Of Work Contingencies None Overhead And Profit A Nominal Percentage To Reflect Variation Of Trades Project Size Competition Etc Total Estimated Cost This Submission Will Be Reviewed And One 1 Copy Of The Plans And Specifications Returned To The Consultant This Design Will Be Reviewed For Functional Purposes Only Technical Accuracy And Detail Will Be The Responsibility Of The A E Firm 65 65 Design Is Required Within Sixty 60 Calendar Days After Notice To Continue From The 35 Is Issued By Contracting Officer Or The Cor Submittal Letter Consultant Shall Provide A Submittal Letter Addressed To The Contracting Officer Stating Documents Submitted For 65 Review Specifications Consultant Shall Provide 2 Sets Of Edited Assembled And Technical Project Specifications To The Project Engineer To Be Used On This Project Marked Up Standard Specifications Are Acceptable The Most Current Va Master Specifications Shall Be Used On This Project And Are Available On Internet Http Www Cfm Va Gov Til Spec Asp Drawings Consultant Shall Provide A 2 Full Set Of Project Drawings Showing The Basic Plan For Each Discipline Involved This Shall Include All Drawings Developed For The Previous Reviews Shall Be Detailed Showing All Utilities Services And Sizes As Well As Other Required Construction Detail Show Complete Plan Views Elevation Views Photographs Legends And Other Schedule Information Also Show Complete Details Notes Sections And Locations 95 95 Design Is Required Within Sixty 60 Calendar Days After Notice To Continue From The 65 Is Issued By Contracting Officer Or The Cor Submittal Letter Consultant Shall Provide A Submittal Letter Addressed To The Contracting Officer Stating Documents Submitted For 75 Review Specifications Consultant Shall Provide 2 Sets Of Edited Assembled And Technical Project Specifications To The Project Engineer To Be Used On This Project Marked Up Standard Specifications Are Acceptable The Most Current Va Master Specifications Shall Be Used On This Project And Are Available On Internet Http Www Cfm Va Gov Til Spec Asp Drawings Consultant Shall Provide A 2 Full Set Of Project Drawings Showing The Basic Plan For Each Discipline Involved This Shall Include All Drawings Developed For The Previous Reviews Shall Be Detailed Showing All Utilities Services And Sizes As Well As Other Required Construction Detail Show Complete Plan Views Elevation Views Photographs Legends And Other Schedule Information Also Show Complete Details Notes Sections And Locations Cost Estimate Consultant Shall Provide A Cost Estimate To Both The Contracting Officer And The Cor Engineer And Ensure That The Following Items Are Included Certification That The Quantities Have Been Checked And Found To Be Correct All Estimates Shall Be Based On The Most Up To Date Working Drawings Available And Shall Be Current As Of The Date Of Submission Materials Are Priced At The Contractor S Buying Level Sales Taxes When Applicable Will Be Added Into Material Costs Cost Totals Should Reflect Labor And Materials Separately And Should Be Formatted As Follows Totals Labor And Materials For All Branches Of Work Contingencies None Overhead And Profit A Nominal Percentage To Reflect Variation Of Trades Project Size Competition Etc Total Estimated Cost This Submission Will Be Reviewed And One 1 Copy Returned To The Consultant This Design Will Be Reviewed For Functional Purposes Only Technical Accuracy And Detail Will Be The Responsibility Of The A E Firm 100 100 Design Two 2 Sets Of Specifications Drawings And Cost Estimates Are Required Within Forty 40 Calendar Days After Notice To Continue Is Issued By Contracting Officer Or The Cor Submittal Letter Consultant Shall Provide A Submittal Letter Addressed To The Contracting Officer Stating Documents Submitted For 100 Review Specifications Consultant Shall Provide 2 Sets Of Edited Assembled And Technical Project Specifications To The Project Engineer To Be Used On This Project Marked Up Standard Specifications Are Acceptable The Most Current Va Master Specifications Shall Be Used On This Project And Are Available On Internet Http Www Cfm Va Gov Til Spec Asp Drawings Consultant Shall Provide A 2 Full Set Of Project Drawings Showing The Basic Plan For Each Discipline Involved This Shall Include All Drawings Developed For The Previous Reviews Shall Be Detailed Showing All Utilities Services And Sizes As Well As Other Required Construction Detail Show Complete Plan Views Elevation Views Photographs Legends And Other Schedule Information Also Show Complete Details Notes Sections And Locations Cost Estimate Consultant Shall Provide A Cost Estimate To Both The Contracting Officer And The Cor Engineer And Ensure That The Following Items Are Included Certification That The Quantities Have Been Checked And Found To Be Correct All Estimates Shall Be Based On The Most Up To Date Working Drawings Available And Shall Be Current As Of The Date Of Submission Materials Are Priced At The Contractor S Buying Level Sales Taxes When Applicable Will Be Added Into Material Costs Cost Totals Should Reflect Labor And Materials Separately And Should Be Formatted As Follows Totals Labor And Materials For All Branches Of Work Contingencies None Overhead And Profit A Nominal Percentage To Reflect Variation Of Trades Project Size Competition Etc Total Estimated Cost This Submission Will Be Reviewed And One 1 Copy Of The Plans And Specifications Returned To The Consultant This Design Will Be Reviewed For Functional Purposes Only Technical Accuracy And Detail Will Be The Responsibility Of The A E Firm In Accordance With The Previous Review Requirements With All Review Specification Consultant Shall Provide To The Cor Engineer Specifications Complete Comments Accounted For And Ready For Use As Final Contract Documents Specifications Shall Include Scope Of Work And Phasing Schedule Requirements Assembled With The General Construction Sections Final Submission After Completion Of All The 100 Review Comments And Corrections The Final Contact Documents Shall Be Prepared And Submitted Within Twenty 20 Calendar Days After Notice To Continue Is Issued By Contracting Officer Or The Cor Submittal Letter Consultant Shall Provide A Submittal Letter Stating That The Changes And Corrections Noted On The Previous Review Have All Been Evaluated And Incorporated In The Documents Submitted For The Final Submission List These Documents Provide As A Minimum A 700Mb Recordable Disk Containing Digital Drawings And Technical Specifications And Two Hard Copies Drawings To Be In Autocad And Pdf Format The Combined Specifications To Be In Word And Pdf Format The Most Current Va Master Specifications Shall Be Used On This Final Documentation Submission And Are Available On Internet Http Www Cfm Va Gov Til Spec Asp A Final Cost Estimate Based On Revisions Made At 100 Review And Cost Estimate Of Bid Items If Required Totals Labor And Materials For All Branches Of Work Contingencies None Overhead And Profit A Nominal Percentage To Reflect Variation Of Trades Project Size Competition Etc Total Estimated Cost A Final Set Of Design Calculations Where Applicable A Amp E Design And As Builts Only The Cd Case Shall Have The Full Name Of The Firm Address Contact Phone Numbers Project Number Station Number Year The Number Of The Project And Set 1 Of Cds If More The One Cd Is Required On The Inside Of The Cd Case Only There Shall Be An Index Of Drawings With Page Numbers And Drawing Numbers The Cd Face Shall Contain The Same Information As The Cd Case Except The Index The Cd Shall Not Have Anything To Unbalance It All Information Shall Be Neatly Typed And Legible Without The Aid If Any Type Of Magnifying Devises All Cad Data And Project Specifications Shall Be Delivered On Compact Disk S Cd 650Mb Or Greater All Data Files Shall Be Organized Using The Directory Structure Path As Outlined In The Cad Standards Naming Conventions Section Of This Document All Files Shall Be Free Of Corrupted Or Unusable Data All Cad Data Shall Be Supplied In The Latest Version Of The Translation Format Dwg The Contractor Will Be Responsible For Ensuring That All Files Shall Translate To The Vahs s Target Cad System Autocad 2019 The A Amp E Shall Ensure A Separate Layer Identified As Square Footage With The Length Width And Square Footage Of All Mechanical Office And Patient Area Corridors Etc This Layer Shall Have The Total Of Existing Renovated Space Total Of New Construction And The Total Square Footage Of The Entire Renovated Area Pre Bid Conference The A E Is Required To Attend The Pre Bid Conference Which Will Be Scheduled By The Alexandria Va Health Care System Contracting And Procurement Section Prior To The Bid Opening Date For The Purpose Of Answering Questions And Clarifying The Project Specifications And Drawings With Prospective Bidders The Project Site Will Also Be Visited To Verify Existing Field Conditions And Dimensions Pre Construction Meeting The A E Is Required To Attend The Pre Construction Meeting For The Project Which Will Be Scheduled By The Alexandria Va Health Care System For The Purpose Of Answering Questions And Clarifying The Bid Documents Etc With The Contractor The A E Is To Provide Five 5 Complete Sets Of Contract Drawings And Specifications To The Construction Contractor At This Meeting The A E Shall Take Written Minutes Of The Pre Construction Meeting And Provide The Alexandria Va Health Care System With Them Within Five 5 Working Days Construction Period Service Requirements Review Of Submittals Consultant Shall Review All Material Submittals Shop Drawings And Test Reports Reviews Shall Be Completed And Submittals Returned To The Cor Engineer With Fifteen 15 Calendar Days From Receipt Of Request Review Analysis Of Change Order And Costs Consultant Shall Provide Prompt Response When Contacted By Resident Engineer To Review And Provide Analysis Of Change Orders And Costs Site Visits Consultant Shall Provide Weekly Site Visits Throughout The Duration Of Construction Activities And One 1 Final Inspection For The Project Please Include Price For Additional Site Visits Should They Be Desired By Resident Engineer The Architect Engineer Will Also Make A Written Inspection Report Within Two 2 Working Days After Each Site Inspection Weekly Construction Phase Meeting Consultant Shall Be Required To Attend All Weekly Construction Phase Meeting In Person Or Via Tele Conferencing To Discuss Any Issues Or Concerns The Va Staff Or Contractor May Have Ae To Provide Meeting Minutes For All Weekly Calls And Drawing Reviews One Set Of Drawings Markup Drawings Shall Be On Site Or In Job Shack With All Documented Changes To The Project Must Be Legible And Ready At Any Time For The Cor To Review While In The Area Once Completion Of Construction This Set Of Drawing Will Be Turned Into The Cor So It Can Be Given To The A Amp E To Make All Changes And Create The Final Set Of As Built Drawings In Accordance With Alexandria Va Healthcare Systems Computer Aided And Drafting Standards A Punch List Will Be Generated From Final Walk Around And Must Have Cash Amounts Accompanying Miscellaneous Following Approval Of The Final 100 Review Material The A E Will Provide The Government With Electronic Sets Of The Approved Contract Drawings And Specifications Drawings Shall Be Furnished In Autocad 2019 Electronic Format And One Set Of Drawings In Pdf For Distribution The Specifications Shall Include Those Sections Prepared And Edited By The Contracting Officer And Shall Be Furnished In Ms Word Format Specifications Shall Be Of The Most Recent Version On The Va Master Specifications Til A E Will Provide Additional Services As Outlined In Special Provisions Architect Engineer Contract Including Construction Period Services Site Surveys As Built Drawings Etc Design To Be In Accordance With Applicable Federal State And Local Codes Asce Asme Ashrae Nfpa Jcaho Osha Va Design Guides And Master Specifications Etc Design Shall Be In Accordance With Program Guide Pg 18 15 And Volume C Of The Til Design To Identify Any Tasks That Require Extended Hours And Shall Detail The Requirements For The General Contractor

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail