Tenders Are Invited For Installation Services Of Electricity Distribution And Control Equipment

Tender Detail

35166829
2020 S 232 573494
Self Funded
Tenders Are Invited For Installation Services Of Electricity Distribution And Control Equipment
ICB
Eastern Europe
Balkans,European Union
11-01-2021

Work Detail

Contract Notice Installation Services Of Electricity Distribution And Control EquipmentModernization Of 20 Kv Che Substation Bradi Or And 6 3 Si 20 Kv Che Substation Malaia Repair And Installation Services Of Equipment Description The Description Of The Services Object Of The Contract Is Enunciated In Chapter 3 Of The Specifications No 100051 28 9 2020 And Their Detail Is Presented In The Technical Projects No Eei Ptcs 503 2018 Modernization Of 20Kv Power Station Che Bradi Or And Eei Ptcs 504 2018 Modernization Of 6 3 Kv And 20 Kv Power Plant Malaia The Contract Will Be Developed In 2 Stages Stage 1 Preparation And Approval Of Dde Basic Design Approval Documentation And Execution Design Execution Documentation And Preparation Of The Execution Of Modernization Services Acquisition And Transport Of Primary And Secondary Equipment In The Power Station Seven Months The Stage Does Not Require The Decommissioning Of The Power Station And Implicitly Of The Hpp In This Stage The Technical Execution Documentation Dde Will Be Elaborated And Approved And The Logistical Stages Will Be Covered Acquisition Deliveries In Situ Of Equipment And Protection Cabinets Temporary Supply Of Protection Cabinets For Samples And Programming And Verification Of Protection Relays According To The Regulations Stage 2 The Actual Execution Of The Repairs And Modernizations Of The Stations Decommissioning Of The Power Station Handing Over To The Contractor The Effective Execution Of The Modernizations And Re Commissioning The Duration Of Stage 2 Is Maximum Project Values 14 Days For The 20 Kv Che Bradisor Substation 14 Days For The 6 3 Kv And 20 Kv Che Malaia Substation The Stage Involves The Decommissioning Of Che Bradisor For 0 Days And Of Che Malaia For 14 Days Between Stage 1 And Stage 2 There Will Be Stationary Points Of The Execution Schedule Stage 2 Of The Contract Execution Will Take Place Successively For The 2 Power Stations In The Calendar Periods Characterized By Small Water Flows Summer Months At Times Decided By The Beneficiary With The Consent Of The Energy Dispatcher If The Hydrological And Or Energetic Conditions Do Not Allow This The Parties Agree That The Total Duration Of The 2Nd Stage Established By The General Schedule To Be Extended By An Additional Act To The Contract Number Of Days Until Which Clarifications Can Be Requested Before The Deadline For Submission Of Tenders 15 Days Before The Deadline Set By The Tender Notice For Submission Of Tenders The Contracting Entity Will Respond Clearly And Completely To All Requests For Clarifications On The 11Th Day Before The Deadline Established By The Tender Notice For The Submission Of Tenders Only The Requests For Clarifications Addressed By Op Ec Within The Deadline Stated Above Time Limit For Receipt Of Tenders Or Requests To Participate Date 11 01 2021 Local Time 15 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail