Asia-Pacific Economic Cooperation, APEC,Association of Southeast Asian Nations, ASEAN
21-12-2020
Work Detail
Procurement Plan for On Contractor Selection Approval Implementation Stage Project New Construction of 110kv Cnc 2 Substation and Branching Date Approval 21 09 2020Package 1Type ConsultancyName Package 3 Consulting survey establishing technical design designing construction drawing preparing bidding documentsPrice 2 420 250 773Package 2Type ConsultancyName Package 4 Consulting design verification costingPrice 228 444 117Package 3Type Non ConsultancyName Package 5 Measuring and drawing the plotsPrice 363 000 000Package 4Type GoodsName Package 6 Supply and installation of the transformer supplies and equipment for transformer stationsPrice 87 118 569 017Package 5Type WorksName Package 7 Building stationPrice 17 455 109 679Package 6Type WorksName Package 8 Build underground 110kV cable line connecting line to the station Package 9 Construction supervision consultant Package 10 Transformer station calibration experiment Package 11 InsurancePrice 31 763 778 736Package 7Type ConsultancyName Package 9 Construction supervision consultantPrice 1 618 927 648Package 8Type WorksName Package 10 Transformer station calibration experimentPrice 2 799 727 954Package 9Type Non ConsultancyName Package 11 InsurancePrice 330 376 369 Disclaimer The above text is machine translated For accurate information kindly refer the original document
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.