Work Detail

Quotation are invited for 1032002147 Flame Stabilizers Work HRSG 81 82 83 84 duct burner flame stabilizers replacement work at L 2stationTECHNICAL AND GENERAL SPECIFICATIONS OUTSOURCING WORK L STATION PHASE I JEBELALI NAME OF WORK SCOPE OF WORK FOR HRSG81 82 83 84 DUCT BURNER FLAME STABILIZERSREPLACEMENT WORK PERIOD OF WORK 5 DAYSDURING SHUT DOWN OF EACH HRSG TENTATIVEDATE OF SHUT DOWN PERIOD FROM 01 10 2020 TO 30 04 2021REPLACEMENT QUANTITY TOTAL 200 STABILIZERS 50 NOS HRSG IN 4 HRSGS MATERIAL SS 310 SCOPE OF WORK THE CONTRACTOR SHALL VISITTHE SITE AND MAKE HIMSELF FULLY FAMILIARWITH THE WORK SCOPE PLANT ACCESS FACILITIES COMPLEXITIES SAFETY MEASURES ETC BEFOREHE SUBMIT HIS BID THE SHUTDOWN PERIODWILL BE FROM 01 10 2020 TO 30 04 2021 PARTY WILL GET ONE UNIT AT A TIME THEREFORE PARTYHAS TO COME TO THE SITE FOUR TIMES TOEXECUTE THE JOB TO GET A PTW HWPCONTRACTOR HAS TO SUBMIT RISK ASSESSMENT FORMS AND METHOD STATEMENT PRIOR TO START THE WORK CHECK CONDITION SUITABLE TO CARRY OUTWORK CONDUCT SITE SURVEY AND SAFETY INSPECTION TOASSESS THE WORKING ENVIRONMENT A SAFETYMEETING WILL BE HELD TO EVALUATE THE RISKINVOLVED IN METHODS TO BE USED RISK ASSESSMENT ANDTOOLBOX TALK TO BE GIVEN TO THE EMPLOYEES MOBILIZE THE LABOR EQUIPMENT TOOLS ETC IMMEDIATELY AFTER GETTING THE PO OR MAILCONFIRMATION FROM DEWA ALL LIFTING ANDPOWER TOOLS SHALL BE TESTED AND TESTCERTIFICATE TO BE SUBMITTED TO DEWA BEFORE STARTINGANY WORK WELDER TEST CERTIFICATES TO BESUBMITTED TO DEWA BEFORE STARTING ANYWORK ALLMATERIALS ARE SS 310 VERIFY THATSCAFFOLDINGS ARE SAFE TO WORK PREPARETHE WELDING PROCEDURE PROCEDURE TO BEPROVIDED BY CONTRACTOR ALL MATERIALS ARE SS 310 JOINTINSPECTION WITH DEWA ENGINEER TO CONFIRMTHE QUANTITY AND LOCATION OF STABILIZERS TOBE REPLACED IN ALL ELEVATIONS TOTAL 5ELEVATIONS IDENTIFY THE STABILIZERS TO BEREPLACED WITH DEWA ENGINEER MARK THESTABILIZERS TO BE REPLACED EXTRA PRECAUTIONSHOULD BE TAKEN DURING REMOVAL INSTALLATION OF DAMAGED NEW STABILIZERSTHAT LEAD TO NO DAMAGE OF EXISTING PIPES BAFFLE PLATES AND OTHERSTABILIZERS INSPECTION OF THE BURNERELEMENT PIPE AND REPLACEMENT OF THE PIPEPORTION IF CRACK OBSERVED PIPE MATERIAL SS 310 APPROPRIATE WPS SHALL BE FOLLOWEDDURING THE PIPE REPLACEMENT AND WELDING INSTALL THE NEW STABILIZERS WHICH PROVIDED BY DEWA JOINT INSPECTION FOR ALIGNMENT OFSTABILIZERS TO BE DONE WITH DEWA ENGINEERSBEFORE WELSTANDARD TERMS CONDITIONS1 Prices should be DDP delivery duty paid at DEWA stores 2 Quotation to be submitted only in local currency U A E Dirhams3 DEWA Standard payment terms is 30 days credit from the date of acceptance of material4 No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company and your participation in DEWA tenders RFQs should not constitute a Conflict or perceived Conflict of Interest

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail