Belgrade WaterThe Remaining Component Covers The Design And Refurbishment Of Jezero Water Treatment Plant Located At Makis In Belgrade As Well As Design And Construction Of Facilities For Treatment Of Waste And Process Water From Production Plant Maki And Sludge Treatment Of Pre Settling Tank With The Accompanying Outer Piping System For Compensation And Recirculation Of Waste Water After Filter Backwash Of The Secondary Thickener And The Area For Container Storage And Of Waste Water Treatment UnitIn Addition The Consultancy Services Are Required For Piu Support And Supervision Of The Above Works Including In The Capacity Of The Engineer
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.