Construction Site Supervision ServicesExercise of construction supervision during the implementation of repairs reconstruction of existing shore protection facilities for protection against abrasion on the beach in the area of the sea bay Aheloy stage I and IIDescription The selected consultant should exercise Construction Supervision in connection with Art 166 para 1 and Art 168 of the Spatial Planning Act SPA in volume and scope according to the provisions of the Spatial Development Act and the Ordinances issued by the Ministry of Regional Development and Public Works on the basis of the application of the law as well as all laws and regulations in the field of construction in BULGARIA The consultant should perform continuous control over the implementation of construction and installation works assigned under the PPL according to the technical designs and the requirements of Art 169 of the Spatial Development Act The consultant should be responsible for the lawful start of construction control over the construction products delivered and used in the construction the legality of all construction documentation incl control over the completeness and correct drawing up of the acts and protocols during the construction other construction documents incl inspection and certification of the executive documentation of the construction according to art 175 of the Spatial Development Act if necessary preparation of such preparation of technical passport and final report according to the Spatial Development Act coordination of the construction process until signing a protocol for control of the quantities quality and compliance of the performed construction and installation works with the contract for execution of the construction signing acts protocols for acceptance of performed construction and installation works control over the observance of the linear schedules for construction and installation works exercising control over the observance of the requirements for healthy and safe working conditions environmental protection control preventing damage to third parties and property as a result of construction and installation works Time limit for receipt of tenders or requests to participate Date 07 07 2020 Local time 17 00 Disclaimer The above text is machine translated For accurate information kindly refer the original document
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.