Elering AS plans to adjust the dimensions of the 110 kV overhead line L138B Alutaguse Kiikla at the permitted continuous load current at the phase conductor temperature 60 C Simultaneously with the adjustment of the line dimensions the insulation must be replaced and bird barriers must be installed on the line and 44 masts in unsatisfactory condition must be replaced on the line route Reconstruction activities are carried out on a turnkey basis which