Contract B SPDT Basement and Parcel 1 The Contracting Authority require an Architect led Single Point Design Team SPDT for the Design Procurement Construction and Delivery of the Project Opera Contract B Works which includes excavation and construction of the overall basement and construction of the Commercial Office Building over Retail Restaurant Caf Bar at ground floor referred to as Parcel 1 at the Project Opera Site The Project Opera site is a 3 7 acre site located in Limerick City between Rutland Street Patrick Street Ellen Street Michael Street and Bank Place The Services to be provided include Architect SPDT lead and Design Certifier Civil Structural Engineer Specialist Transport and Roads Engineer Resident Engineer if required and Ancillary Design Certifier Mechanical Electrical Engineer Ancillary Design Certifier Low Energy Building Simulation and NZEB compliance Fa ade Consulting Engineer Acoustic Engineer and Sustainability Consultant LEED Planning permission reference number ABP 304028 19 has been obtained however the full SPDT will be required to review the current design to ensure the design is fully coordinated prior to commencing detailed design stage The SPDT will be required to complete the Detailed Design stage in full with only the Technical Design being undertaken post novation to the Design Build Contractor On award of the Design Build Contract the Architect led SPDT will be novated to the Contractor to act as the Design Build Contractor s Design Team Refer to the Project Information and Requirements Memorandum and Outline Project Brief for further details on the current status of the overall Project and the services required from the SPDT br
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.