Engineering Procurement and Construction EPC Contractors for Nineteen Multivillage Drinking Water Supply Systems MVWSS

Tender Detail

30377868
GOILOC 284 EBID Benin EPC 47
Yes Other Funding Agencies
Engineering Procurement and Construction EPC Contractors for Nineteen Multivillage Drinking Water Supply Systems MVWSS
ICB
Southern Asia
BRIC,G20,South Asian Association for Regional Cooperation (SAARC)
15-07-2020

Work Detail

Prequalifications are invited for Engineering Procurement and Construction EPC Contractors for Nineteen Multivillage Drinking Water Supply Systems MVWSS in Benin Application DocumentForPREQUALIFICATION OF ENGINEERING PROCUREMENT AND CONSTRUCTION EPC CONTRACTORS FOR NINETEEN MULTIVILLAGE DRINKING WATER SUPPLY SYSTEMS MVWSS IN BENINExport Import Bank of IndiaDate June 1 2020INVITATION FOR PREQUALIFICATION OF EPC CONTRACTORS FORGOVERNMENT OF INDIA LINE OF CREDIT LOC PROJECTThe Export Import Bank of India hereafter Exim Bank or the Bank on behalf of the Government of India GOI extends from time to time concessional credit facilities under the Indian Development and Economic Assistance Scheme IDEAS to overseas governments their nominated agencies in developing countries for financing projects involving procurement of goods civil works consultancy and non consultancy services to be contracted to Indian entities These Lines of Credit LOCs are governed by the Guidelines issued by the GOI from timeto time As per the extant guidelines issued vide letter No 21 3 2015 IDEAS dated December 7 2015 the Bank is required to carry out a prequalification exercise and provide a list of prequalified bidders to the Borrower for invitation of bids for specific contract packages under the project s financed by the LOCs In pursuance to the above the Bank invites Applications from eligible Indian entities for prequalification of Engineering Procurement and Construction EPC Contractors for nineteen multi village drinking water supply systems MVWSS in Benin An upfront and non refundable Processing Fee of INR 25 000 plus applicable GST presently 18 is payable through NEFT transfer as per details given below i Applicant Name Applicant Name ii Name of Beneficiary Export Import Bank of India iii Beneficiary s Bank Name Export Import Bank of India iv Account No HO00INR11011004 v IFSC Code EIBI0HO0001 vi GST Number 27AAACE2769D1ZS vii Narration to be inserted for NEFT GOILOC 284 EBID Benin EPC 47The preparation and submission of Application for Prequalification is required in dual mode on line as well as off line in accordance with the provisions of the Application Document Completed Applications off line in accordance with the provisions of the Application Document along with NEFT acknowledgement receipt should be delivered physically by 15 00 hours July 15 2020 at the following address Mr Ashok Kumar VartiaDeputy General ManagerExport Import Bank of IndiaOffice Block Tower 17th Floor Adjacent to Ring RoadKidwai Nagar East New Delhi 110023E mail eximloc eximbankindia inWebsite www eximbankindia inThis Application Document AD consists of the following Parts Part I Scope of EPCThis Part includes a summary description and other data on this prequalification process and of the prospective project to be contracted by the Borrower Government Procuring Entity subsequent to this prequalification Part II Instructions to Applicants ITA This Part provides information to the Applicants in preparing and submitting their Applications for Prequalification Applications and the procedures for this prequalification process Part III Data Sheet DS to ITAThis Part includes specific provisions that supplement Part II Instructions to Applicants Part IV Prequalification Criteria and RequirementsThis Part specifies the criteria and requirements and the procedure to be used to determine how Applicants shall be prequalified and later to be invited to bid by Borrower Government Procuring Entity Part V FormsThis Part includes the Application Submission Form and other forms required to be submitted with the Application Part VI Questionnaire for ApplicantsThis questionnaire requires the prospective Applicants to furnish certain basic information and confirm certain facts relating to their firm joint venture with respect to past performance and prospective engagement Application DocumentforPREQUALIFICATION OF ENGINEERING PROCUREMENT AND CONSTRUCTION EPC CONTRACTORS FOR NINETEEN MULTIVILLAGE DRINKING WATER SUPPLY SYSTEMS MVWSS IN BENINInvitation for PrequalificationNo GOILOC 284 EBID Benin EPC 47Issued on June 1 2020 ContentsApplication Document for Prequalification of EPC ContractorsPart I Scope of EPC 6Part II Instructions to Applicants ITA 110Part III Data Sheet DS to ITA 198Part IV Prequalification Criteria and Requirements 232Part V Forms 35Part VI Questionnaire for Applicants 59Part I Scope of EPC6Part I Scope of EPCThe Export Import Bank of India hereafter Exim Bank or the Bank on behalf of theGovernment of India GOI has approved financing of a project out of a Line of Creditextended to the Ecowas Bank for Investment and Development EBID Togo for NineteenMulti Village Drinking Water Supply Systems MVWSS in Benin for which Exim Bank nowseeks applications for prequalification from eligible Indian entities Refer Part II ITA 4 foreligibility provisions A Background and Major Components of the Project1 Site and other DataBenin officially the Republic of Benin is a country in West Africa bordered by Togo to thewest Nigeria to the east Burkina Faso and Niger to the north and the Atlantic Ocean tothe south It extends south to the Gulf of Guinea where the capital Cotonou is located Benin can be divided into four areas from the south to the north starting with the lowlying sandy coastal plain highest elevation 10 m which is at most 10 km wide Behindthe coast lies the Guinean forest savanna mosaic covered plateaus of southern Benin altitude between 20 and 200 m which are split by valleys running north to south alongthe Couffo Zou and Ou m Rivers An area of flat land dotted with rocky Collines whosealtitude seldom reaches 400 m extends around Nikki and Save A range of mountainsextends along the northwest border and into Togo Benin covers an area of approximately 114 763 km2 with a population of approximately 11million growing at 3 52 percent per year The official language is French Benin is a tropical sub Saharan nation highly dependent on agriculture with a climate that provides goodgrowing seasons Benin s climate is hot and humid Annual rainfall in the coastal areaaverages 1300 mm or about 51 inches Benin has two rainy and two dry seasons per year The principal rainy season is from April to late July with a shorter less intense rainy periodfrom late September to November The main dry season is from December to April with ashort cooler dry season from late July to early September Temperatures and humidity arehigh along the tropical coast In Cotonou the average maximum temperature is 31 C theminimum is 24 C Variations in temperature increase when moving north through savanna and plateautoward the Sahel A dry wind from the Sahara called the Harmattan blows from Decemberto March when grass dries up other vegetation turns reddish brown and a veil of fine dusthangs over the country It is also the season when farmers burn brush in the fields 2 Project backgroundThe project involves the construction of a drinking water supply system and therehabilitation upgrading expansion of existing networks involving construction of 19 MultiVillage Drinking Water Supply Systems MVWSS in Benin There are 82 administrativevillages connected to the 19 MVWSS distributed in 07 Departments of Benin The overall objective of the project is to improve access to drinking water in rural areaswithin the framework of universal access to drinking water by 2030 Specifically the project aims among other things to i ensure access to an improved drinking water source for the beneficiary populations ii ensure continuous and sustainable availability of drinking water and iii ensure quality drinking water on a permanent basis For the purpose of execution the project is bifurcated into two lots with details as under Lot1 Construction of nine 9 MVWSS in the north of BeninLot2 Construction of ten 10 MVWSS in the South and Central BeninPart I Scope of EPC7Project sites proposed to be covered under the Line of Credit to EBID are as below Districts Communities Number of Systemsper districtLOTALIBORI BANIKOARA 1LOT1ATACORA KOUANDE 1NDALI 2 7BEMBEREKEBORGOU SINENDEPERERE 3 COLLINES SAVE 1LOT2ZA KPOTAAGBANGNIZOUN 4DJIDJA 2 OUEME AKPRO MISSERETE 1SAKETEPLATEAU POBE 2 4KETOUThe Geographical Location of sites under Lot 1 and Lot 2 are depicted below 3 Scope of EPC For both Lot 1 and Lot 2 The construction of a multi village drinking water supply system in the aforementionedzones comprises the following components Details as under Major Components of the Project1 Elevated water tank Part I Scope of EPC8Construction of at least one elevated tank for every system 09 tanks for Lot1 and 10 tanksfor Lot2 in reinforced concrete The capacities of the tanks shall range from 100 to 500m3 and height from 12 to 24 meters performance of all civil works namely soil tests calculation notes and executionplans excavations and reinforced concrete

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail