Master Plan of Overall Rural Construction and Upgrading and Low Voltage Transmission Line and Transformer Stations in Tam Hoa Trung Dung Thong Nhat Wards in 2019
Master Plan of Overall Rural Construction and Upgrading and Low Voltage Transmission Line and Transformer Stations in Tam Hoa Trung Dung Thong Nhat Wards in 2019
Asia-Pacific Economic Cooperation, APEC,Association of Southeast Asian Nations, ASEAN
17-07-2020
Work Detail
Procurement Plan for Master Plan of Overall Rural Construction and Upgrading and Low Voltage Transmission Line and Transformer Stations in Tam Hoa Trung Dung Thong Nhat Wards in 2019Date Approval 17 04 2020Package 1Type WorksName Package No 3 Construction and installationPrice 2 098 182 845Package 2Type ConsultancyName Package No 4 Consulting construction supervision and installation of equipmentPrice 193 898 770Package 3Type ConsultancyName Package 5 Audit settlement of completed projectsPrice 121 864 959 Disclaimer The above text is machine translated For accurate information kindly refer the original document
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.