Expressions Of Interest For Consultancy Services Project Preparation Study For The Construction Of The Choir Sainshand Transmission LineTheMongolian Transmission Network Suffers From Underinvestment With Old AndInefficient Infrastructure And Limited Capacity To Absorb Additional Power FromNew Sources Especially Variable Renewable Energy Vre Sources Like Pv AndWind Power Plants The Existing Choir Sainshand 110Kv Transmission Line In TheSouth Eastern Part Of The Country Is One Of The High Voltage Hv Lines That Needs An Urgent Upgrade With Additional Capacity In Order To ImproveThe Reliability Of The National Grid And Its Capacity To Absorb Vre The ProjectConsists Of The Construction Of The Approximately 230 Km Long Choir SainshandNew Double Circuit 220Kv Transmission Line And Construction Of The New220 110 35 Kv Substation At Sainshand A Detailed Feasibility Study Has BeenCarried Out In 2013 Covering A Wider Transmission Project The Choir Sainshand Zamiin Uud Transmission Line And Necessary Substations Of WhichThe Proposed Project Is A Significant Part
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.