Tenders Are Invited For Procurement Of Facade And Balcony Repair In Icheri Sheher

Tender Detail

24036071
Self Funded
Tenders Are Invited For Procurement Of Facade And Balcony Repair In Icheri Sheher
NCB
Western Asia
Commonwealth of Independent States, CIS
20-11-2019

Work Detail

Tenders Are Invited For Procurement Of Facade And Balcony Repair In Icheri Sheher Construction Waste Transport To 25 Km 0 14 62 TonBrickwork Of Caves 0 0 18 M 3 Waterproofing Of External Walls With Cement Mortar 0 119 1 M 2 Wall Painting With Facade Emulsion 0 139 1 M 2 Slate Roof Deck Removal 0 12 M 2 Demolition Of Wooden Porch On The Balcony 0 7 1 M 2 Destruction Of The Ceiling And Bottom Of The Balcony 0 27 M 2 Demolition Of Wooden Walls From The Balcony 0 3 5 M 2 Placing Wooden Borders On The Balcony 0 3 5 M 2 Replacing The Wooden Jockeys Of The Pilgrim 0 19 5 MDemolition Of Wooden Floors On The Balcony 0 18 M 2 Demolition Of Wooden Throws 0 0 65 M 3 Installation Of Wooden Throws 0 0 65 M 3 Inserting Six Boards To The Window 0 12 M 2 Window Glass Thickness 3Mm 0 63 M 2 Clean Old Windows And Paint Them With Oil Paint 0 50 M 2 Old Facade Wall Cleaning 0 202 M 2 Wall Printing 0 22 M 2 Removal Of Useless Plasterboard From The Wall 0 815 M 2 Installation Of Wooden Spots 0 18 M 2 Piping Of Water Pipes 0 4 MDemolition Of Wooden Doors 0 12 M 2 Decorating Wooden Doors 0 10 M 2 Installation Of European Type Wooden Door 0 10 M 2 Disposal Of A Daytime Polymer Carbonate Cover 0 2 M 2 Installation Of Wooden Frame At The Bottom Of The Balcony 0 103 M 2 Destroying The Iron Frame Of The Day 0 0 01 TonDemolition Of Air Conditioners 0 10 PiecesApply A Polymer Carbonate Coating Daily 0 2 M 2 Major Repair Of Wooden Door Units 0 2 PiecesInstallation Of Wooden Door Blocks 0 12 M 2 Oil Door Painting With Oil Paint 0 3 M 2 Installation Of Wooden Window Blocks 0 63 M 2 Framing Of The Frame With A Wooden Board 0 38 1 M 2 Installation Of Wooden Frame On The Ceiling And Bottom Of The Porch 0 37 M 2 Stacking Wood Flooring 36Mm 0 18 M 2 Installation Of Iron Frame Daily 0 0 01 TonPulling Of Naval Sheet From Galvanized Metal Sheet 0 5 MCopper Piping Insulation With Foam Glass 0 0 48 M 3 Installation And Dismantling Of External Iron Mats H 16M 0 562 M 2 Coloring The Adhesive Board With Oil Paint 0 38 M 2 Coloring The Wooden Balcony 0 93 M 2 Removal Of Useless Metal Grids 0 0 4 TonInstallation Of Metal Grille 0 0 4 TonPolishing Of Metal Grille And Astrologer 0 73 M 2 Applying Lining To Metal Grille And Mahogany 0 73 M 2 Oil Paint On Metal Grille And Mahogany 0 73 M 2 Demolition Of White Stones From The Facade 0 5 M 2 Flooring With Wooden Stone 0 5 M 2 Polishing Of Wall To Ceiling Panels 0 53 M 2 Disposal Of Unsuitable Electrical Wires 0 340 MMajor Repair Of Wooden Windows 0 10 PiecesRepair Of Iron Screwdriver 0 0 07 TonClean Old Wooden Balcony 0 147 M 2 Construction Waste Transport To 25 Km 0 16 2 TonOil Floor Painting With Oil Paint 0 18 M 2 Coloring Of Wooden Window Blocks 0 63 M 2 Coloring Of Wooden Door Blocks 0 22 M 2 Polishing Of Wooden Surfaces 0 55 6 M 2 Construction Waste Treatment 0 7 7 TonLoad Of Construction Waste From Self Cleaning Machines 0 7 7 TonConstruction Waste Transport To 25 Km 0 7 7 TonSlate Roof Deck Removal 0 16 M 2 Demolition Of Balcony Floor Ceiling 0 14 M 2 Demolition Of The Porch Wooden Porch 0 11 6 M 2 Demolition Of A Balcony Floor 0 14 M 2 Installation Of Air Conditioners 0 10 PiecesDestruction Of The Lower Part Of The Balcony 0 92 M 2 Installation Of Wooden Beams And Poles 0 0 5 M 3 Installation Of Wooden Spots 0 14 M 2 Stacking Wood Flooring 36Mm 0 14 M 2 D12x1 5Mm Copper Tubes Laying Attachment 0 120 MDemolition Of Metal Elements Over Walls 0 0 53 TonCleaning Old Wood Doors And Painting With Oil Paint 0 17 M 2 Installation Of Electrical Wires 0 340 MDemolition Of Wooden Throws And Poles 0 0 5 M 3 Replacement Of Iron Barrier From Water Drain 0 1 PiecesRoofing Of Sheet Metal 0 12 M 2 Demolition Of Wooden Window Blocks 0 63 M 2 Correcting A Wooden Frame On The Ceiling Of The Balcony 0 14 M 2 Framing Of The Frame With A Wooden Board 0 13 94 M 2 Demolition Of Wooden Doors 0 29 M 2 Demolition Of Wooden Window Blocks 0 112 M 2 Installation Of Wooden Door Blocks 0 28 72 M 2 Installation Of Wooden Window Blocks 0 122 13 M 2 Window Glass 0 122 M 2 Polishing Of Wooden Surfaces 0 452 21 M 2 Filling Of Wood Floor Surfaces 0 452 M 2 Wooden Doors Polishing 0 47 M 2 Wooden Windows Lacquering 0 250 M 2 Lacquer Boards Adhesive Boards 0 124 M 2 Wood Flooring Varnish 0 31 M 2 Demolition Of White Stones From The Facade 0 5 M 2 Installation And Dismantling Of Mattresses H 16M Long 0 340 M 2 Attachment Of Metal Roofing 0 16 M 2 Correction Of A Tree Network On The Balcony Roof 0 0 13 M 3 Major Repair Of Wooden Door Units 0 6 PiecesRepair Of Wooden Doors 0 3 PiecesCleaning Old Wood Poles 0 6 M 2 Coloring Of Wooden Poles With Oil Paint 0 6 M 2 Old Paint And Wood Paint On Wooden Balcony Doors 0 15 2 M 2 Cleaning Old Wood Doors And Painting With Oil Paint 0 24 5 M 2 Clean Old Windows And Paint Them With Oil Paint 0 51 1 M 2 Installation Of Metal Grille 0 1 21 TonFront Facade With White Stone 0 5 M 2 Load Of Construction Waste From Self Cleaning Machines 0 14 62 TonMetal Grilles Doors And Polish 0 199 34 M 2 Oil Paint On Metal Grilles Doors And Mahogany 0 199 M 2 Demolition Of Iron Elements Over The Wall 0 0 015 TonReplacement Locks 0 5 PiecesDismantling Of Water Pipes 0 70 MPiping Of Water Pipes 0 70 MMajor Repair Of 2 Piece Wooden Window Tiles 0 5 PiecesMajor Repair Of 2 Piece Wooden Windows 0 20 PiecesApplying Lining To Metal Grilles Doors And Door 0 199 M 2 Window Glass With Thickness Of 3Mm 0 54 M 2 Roofing Of Metal Sheets 0 7 M 2 Correcting A Wooden Frame On The Ceiling Of The Balcony 0 6 M 2 Removal Of Useless Plasterboard From The Wall 0 896 62 M 2 Wall Printing 0 506 M 2 Waterproofing Of External Walls With Cement Mortar 0 897 M 2 Repair Of Plastering Of Door And Window Slopes 0 4 M 2 Emulsion Painting Of Facade Walls 0 892 M 2 Slate Roof Deck Removal 0 7 M 2 Demolition Of The Porch Wooden Porch 0 6 12 M 2 Construction Waste Transport To 25 Km 0 6 2 TonDemolition Of A Balcony Floor 0 6 M 2 Installation Of Wooden Beams And Poles 0 0 3 M 3 Installation Of Wooden Spots 0 6 M 2 Stacking Wood Flooring 36Mm 0 6 M 2 Decorating A Wooden Frame At The Bottom Of The Balcony 0 9 M 2 Framing Of The Frame With A Wooden Board 0 23 2 M 2 Remodeling The Wooden Frame On The Balcony 0 23 M 2 Framing Of The Frame With A Wooden Board 0 103 43 M 2 Demolition Of Wooden Throws And Poles 0 0 3 M 3 Demolition Of Air Conditioners 0 18 PiecesLoad Of Construction Waste From Self Cleaning Machines 0 6 2 TonThe Balcony Wooden Frame Repair 0 12 M 2 Framing Of The Frame With A Wooden Board 0 5 76 M 2 Demolition Of Wooden Doors 0 9 M 2 Demolition Of Wooden Window Blocks 0 54 M 2 Installation Of Wooden Door Blocks 0 8 84 M 2 Installation Of Wooden Window Blocks 0 53 61 M 2 Polishing Of Wooden Surfaces 0 176 04 M 2 Construction Waste Treatment 0 6 2 TonFraming Of The Frame With A Wooden Board 0 8 8 M 2 Filling Of Wood Floor Surfaces 0 176 M 2 Wood Flooring Varnish 0 15 M 2 Wooden Doors Polishing 0 18 M 2 Wooden Windows Lacquering 0 107 M 2 Major Repair Of Wooden Door Units 0 2 PiecesRepair Of Wooden Doors 0 1 PiecesRepair Of Wooden Network For Balcony Roof 0 0 06 M 3 Wooden Floors 0 12 24 M 2 Lacquer Surface Polishing 0 36 M 2 Coloring Of Wooden Ceiling 0 20 M 2 D12x1 5Mm Copper Tubes Laying Attachment 0 216 MInstallation Of Air Conditioners 0 18 PiecesInstallation Of Metal Grille 0 1 64 TonInstallation Of Metal Saucer 0 0 09 TonMetal Grilles Doors And Polish 0 106 75 M 2 Applying Lining To Metal Grilles Doors And Door 0 107 M 2 Oil Paintings Of Metal Grille Doors And Mahogany 0 107 M 2 Demolition Of Iron Elements Over The Wall 0 183 KgClean Old Windows And Paint Them With Oil Paint 0 77 M 2 Demolition Of Agadad Stones From The Facade 0 5 M 2 Filling The Seams On The Wall With Cement Mortar 0 6 M 2 Disposal Of Unsuitable Electrical Wires 0 72 MInstallation Of Electrical Wires 0 72 MDisassembly Of Air Conditioning 0 1 PiecesD12x1 5 Mm Copper Tubes Laying Attachment 0 12 MColoring The Wooden Balcony With Oil Paint 0 51 M 2 Flooring With Aqadad Stone 0 5 M 2 Cleaning Old Wood Doors And Painting With Oil Paint 0 33 M 2 Insulation Of Copper Tubes With Foam Glass 0 0 05 M 3 Installation Of Air Conditioning 0 1 PiecesCopper Piping Insulation With Foam Glass 0 0 85 MWaterproofing The Walls And Ceilings With Cement Mortar 0 1168 M 2 Emulsion Coloring Of Walls And Balconies 0 1553 M 2 Repair Of Plastering Of Window Slopes 0 7 2 M 2 Demolition Of Wooden Window Blocks 0 34 M 2 Wooden Floors 0 40 9 M 2 Installation Of Wooden Door Blocks 0 13 53 M 2 Installation Of Wooden Window Blocks 0 33 5 M 2 Window Glass With Thickness Of 3Mm 0 34 M 2 Polishing Of Wooden Surfaces 0 149 45 M 2 Filling Of Wood Floor Surfaces 0 149 M 2 Painting Of Wooden Window Blocks With Oil Paint 0 74 M 2 Painting Of Wooden Door Blocks With Oil Paint 0 24 M 2 Cleaning The Site From Construction Waste 0 14 01 TonAccumulation And Dismantling Of The Outer Railings To H 16M 0 1031 M 2 Installation Of Metal Grille 0 0 68 TonPolishing Of Metal Grille And Astrologer 0 191 47 M 2 Demolition Of The Lambrium On The Exterior Of The Balcony 0 29 M 2 Slate Roof Deck Removal 0 14 M 2 Cleaning Old Wood Doors And Painting With Oil Paint 0 15 M 2 Clear Old Windows And Paint Them With Oil Paint 0 35 M 2 Installation Of Locks For Water Discharge 0 4 PiecesPiping Of Water Pipes 0 50 MDemolition Of Iron Elements Over Walls 0 78 KgDisposal Of Unsuitable Electrical Wires 0 55 MInstallation Of Electrical Wires 0 55 MAccumulation And Disassembly Of The Outer Railings Up To H 16M 0 1376 M 2 Cleaning The Site From Construction Waste 0 10 6 TonLoad Of Construction Waste From Self Cleaning Machines 0 10 6 TonConstruction Waste Transport To 25 Km 0 10 6 TonRemoval Of Useless Plasterboard From The Wall 0 937 M 2 Wall And Balcony Printing 0 700 M 2 Waterproofing The Walls And Ceilings With Cement Mortar 0 937 M 2 Major Repair Of Wooden Window Flooring 0 5 PiecesColoring Of Metal Grilles And Saffron Oils 0 191 M 2 Removal Of Useless Plasterboard From The Wall 0 1168 M 2 Emulsion Coloring Of The Wall And The Bottom Of The Porch 0 1238 M 2 Repair Of Plastering Of Window Slopes 0 25 8 M 2 Demolition Of The Porch Wooden Porch 0 9 2 M 2 Demolition Of Balcony Floor Ceiling 0 7 M 2 Destruction Of The Lower Part Of The Balcony 0 7 M 2 Demolition Of The Balcony Floor 0 14 M 2 Demolition Of Wooden Throws And Poles 0 0 4 M 3 Installation Of Wooden Beams And Poles 0 0 4 M 3 Installation Of Balcony Floor Coverings On Wooden Beams 0 13 5 M 2 Placing A Wooden Frame At The Bottom Of The Balcony 0 14 M 2 Framing Of The Frame With A Wooden Board 0 13 5 M 2 Repair Of Wooden Network For Balcony Roof 0 0 11 M 3 Roofing Of Sheet Metal 0 14 M 2 Correction Of Wooden Frame On Ceiling 0 14 M 2 Framing Of The Frame With A Wooden Board 0 13 5 M 2 Correction Of Wooden Frame Of Balcony 0 41 M 2 Demolition Of The Laminate From The Facade Wall 0 11 M 2 Applying Lining To Metal Grille And Mahogany 0 191 M 2 Construction Waste Transport To 25 Km 0 14 01 TonThe Wall And The Bottom Of The Porch 0 1085 M 2 Demolition Of Wooden Doors 0 14 M 2 Coloring The Wooden Balcony With Oil Paint 0 77 M 2 Polishing Of Wooden Surfaces 0 112 3 M 2 Filling Of Wood Floor Surfaces 0 112 M 2 Coloring Of Boards With Oil Paint 0 14 M 2 Oil Floor Painting With Oil Paint 0 14 M 2 Coloring Of Wooden Window Blocks 0 76 M 2 Coloring Of Wooden Door Blocks 0 9 M 2 Installation Of Metal Grille 0 1 26 TonPolishing Of Metal Grille And Astrologer 0 147 9 M 2 Applying Lining To Metal Grille And Mahogany 0 148 M 2 Coloring Of Metal Grilles And Saffron Oils 0 148 M 2 Installation Of Water Lock 0 2 PiecesDemolition Of A Balcony Floor 0 29 M 2 Construction Waste From Self Propelled Machines 0 14 01 TonInstallation Of Wooden Throws 0 0 95 M 3 Color Cleaning Of The Wooden Balcony 0 77 M 2 Coloring The Adhesive Board With Oil Paint 0 122 M 2 Installation Of Wooden Door Block 0 5 1 M 2 Replacement Of Chisels And Cornices From Galvanized Iron 0 10 MAccumulation And Dismantling Of The Outer Railings To H 16M 0 1126 M 2 Construction Waste Treatment 0 16 2 TonLoad Of Construction Waste From Self Cleaning Machines 0 16 2 TonRemoval Of Useless Plasterboard From The Wall 0 733 5 M 2 Installation Of Wooden Window Blocks 0 34 6 M 2 The Wall And The Bottom Of The Porch 0 456 M 2 Waterproofing The Outer Wall And The Bottom Of The Porch With Cement Mortar 0 749 M 2 Emulsion Painting Of Facade Walls And Bottom Of The Porch 0 842 M 2 Repair Of Plastering Of Window Slopes 0 30 1 M 2 Slate Roof Deck Removal 0 29 M 2 Demolition Of The Porch Wooden Porch 0 26 5 M 2 Breakdown Of The Balcony Ceiling 0 29 M 2 Installation Of Electrical Wires 0 280 MDisposal Of Unsuitable Electrical Wires 0 280 MDemolition Of Iron Elements Over Walls 0 354 TonDemolition Of Wooden Doors 0 5 M 2 Installation Of Metal Grille 0 86 M 2 Demolition Of Wooden Throws 0 0 95 M 3 Applying Lining To Metal Grille And Mahogany 0 110 M 2 Repairing My Wooden Network For Balcony Roof 0 0 23 M 3 Polishing Of Metal Grille And Astrologer 0 109 7 M 2 Correcting A Wooden Frame On The Ceiling Of The Balcony 0 29 M 2 Framing Of The Frame With A Wooden Board 0 28 6 M 2 Balcony Correction Of Wooden Frame 0 53 M 2 Wooden Floors 0 52 9 M 2 Demolition Of Wooden Window Block 0 56 M 2 Installation Of Wooden Window Block 0 55 6 M 2 Window Glass With Thickness Of 3Mm 0 56 M 2 Color Cleaning Of The Wooden Balcony 0 187 M 2 2 Sided Painting Of A Wooden Balcony 0 187 M 2 Polishing Of Wooden Surfaces 0 272 92 M 2 Window Glass With Thickness Of 3Mm 0 35 M 2 Demolition Of Wooden Window Blocks 0 250 M 2 Refreshing The Wooden Balcony 0 147 M 2 Framing Of The Frame With A Wooden Board 0 28 6 M 2 Decorating A Wooden Frame At The Bottom Of The Balcony 0 29 M 2 Roofing Of Metal Sheets 0 29 M 2 Filling Of Wood Floor Surfaces 0 273 M 2 Coloring Of Metal Grilles And Saffron Oils 0 110 M 2 Replacement Locks 0 2 PiecesReplacement Of Galvanized Iron And Cornice From Galvanized Iron 0 17 5 MDemolition Of Iron Elements Over Walls 0 534 KgStacking Wood Flooring 36Mm 0 29 M 2 Installation Of Electrical Wires 0 622 MDemolition Of Air Conditioners 0 12 PiecesDisconnected Power Cables 0 622 MCopper Piping Insulation With Foam Glass 0 0 57 M 3 Installation Of Air Conditioners 0 12 PiecesAccumulation And Dismantling Of The Outer Railings To H 16M 0 1028 M 2 Construction Waste Treatment 0 14 62 TonOil Floor Painting With Oil Paint 0 29 M 2 Painting Of Wooden Window Blocks With Oil Paint 0 122 M 2 Installation Of Floor Boards 0 29 M 2 D12x1 5Mm Copper Tubes Laying Attachment 0 144 MUnusual Color Cleaning On A Wooden Ceiling 0 20 M 2 Usl Code Category Date And Time Of The Open Tender18 10 2019 19 00The Deadline For Submission Of Required Documents12 11 2019 13 30The Last Date And Time For Submission Of The Bid20 11 2019 13 30Date And Time Of Opening Envelopes21 11 2019 13 30Participation Fee 150 AznBank Details Of The Procuring Entity To Pay For Participation In The Tender Score Az03aiib33050019443600287106Vat 9900003611Bank Icherisheher Branch Of Kapital BankCode 200060M H Az37nabz 01350100000000001944Swi Ft Aibbaz2xBudget Classification Code Delivery LocationIcheri SheherDelivery TimeDuring 2019Delivery TermsDdpPayment ConditionsBy TransferCurrency In Which The Bid Price Should Be Calculated And Expressed AznRequired DocumentsRequired Documents Certificate Of Absence Of Overdue Obligations On Taxes And Other Compulsory PaymentsDuring The Last One Year Until The Announcement Of The TenderRequisitesVat And Bank Details Of The ShipperCountry Of RegistrationRegistration Certificate Must Be SubmittedCharterTo Be PresentedNo Cases Of Non Fulfillment Of Taxpayers Duties Established By The Tax Code Of The Republic Of Azerbaijan During The Last Year Excluding The Period Of SuspensionDuring The Last One Year Until The Announcement Of The TenderBank Reference On Financial ConditionTaking Into Account The Term Of The Last YearCopy Of Financial Statements Approved By Tax AuthoritiesDuring The Last One Year Until The Announcement Of The TenderQualifications Text For Mentioned ProceduresTender OfferTechnical Offer 40 PointsApplicants Experience10Contracts Executed By Similar Bidders For The Last Three YearsStaffing Opportunities10Depending On Work Experience In Similar CasesTerm Of Execution Of The Contract10The Bid Shall Be Evaluated With A Maximum Score Of 0 10 The Financial Condition10Bidders Average Financial Turnover Over The Last 3 YearsPrice Offer 60 PointsBid60Bid Proposal Must Be Valid At Least 30 Banking Days After The Envelope Is Opened Bid Security Bank Guarantee In The Amount Of 1 Of The Bid PriceValidity Of The Offer The Envelope Shall Be Valid For At Least 60 Banking Days From The Date Of OpeningContract Security Bank Guarantee In The Amount Of 2 Of The Contract PriceText For Mentioned ProceduresOfficial S Of The Procuring Entity Which Provides Contact With Suppliers Contractors Without Intermediaries And Exchanges Information With ThemTender Proposal 30 Banking Days The Effective Date After The Envelope Is Opened Offer Security 60 Bank Days Warranty Period After Envelope Opening Date Mahir AhmadovEconomistMahir A Icherisheher Gov Az0124922427Number Of Claims Required 3 Information Exchange Is Carried Out Exclusively Through A Single Internet Portal Procurement Is Undertaken By The Procuring Entity To Protect Such Information During Procurement Related To Confidential Information Transmission Of Information To The Procuring Entity Or On Behalf Of The Consignor Contractor As Well As To The Procurement Contractor Organization Is Carried Out Exclusively Through A Single Web Portal Of Public Procurement Paper Submissions And Inquiries Will Not Be Considered Public Procurement Can Be Accessed Through A Single Internet Portal Submission Of Proposals Is Possible Through An Electronic Signature Or Easy Signature Electronic Procurement Is Closed Based On The Criteria Provided To Consignors Contractors In Accordance With Article 50 3 Of The Law Of The Republic Of Azerbaijan On Public ProcurementBids As Well As All Correspondence And Documents Must Be Drawn Up In Azerbaijani Foreign Bids Should Be Translated Into Azerbaijani Suppliers Contractors Must Submit Their Bids As Well As All Documents And Applications Through A Single Public Procurement Portal Documents And Proposals Submitted After The Deadline Will Not Be Accepted Authorized Representatives Of Consignors Contractors May Attend The Portal Tender Envelopes Tender Evaluation And All Procedures Are Conducted Electronically Through A Single Internet Portal The Contractor Must Have An Easy Signature Or Electronic Signature The Tender Procedure Will Be Conducted In Accordance With The Law On Public Procurement You Can Get Acquainted With The Law And Other Relevant Legal Acts In The Legislation Section Of The Portal Https Etender Gov Az Laws The Suppliers Contractors Can Get The Bidding Information Through The Question And Answer Section Of The Portal By Contacting The Procuring Entity Article Viii Of The Law Of The Republic Of Azerbaijan On Public Procurement Baku December 27 2001 No 245 Ii Q Declaring That The Procuring Entity Suffered Losses Or Damages As A Result Of Failure To Comply With Its Legal Obligations During The Tender To File Complaints In Accordance With The Procedure And Procedures Provided For By The Legislation Complaints Are Submitted Through The Portal In Case Of Open Tendering By Means Of E Procurement The Notice Provided In Article 40 1 Of This Law Shall Be Sent To The Consignor Contractor Who Submitted The Tender Through The Unified Internet Portal Of Public Procurement The Tender Contract For E Procurement Is Concluded Electronically Through A Single Web Portal Of Public Procurement With The Winner Of The Tender And Where Required By This Act Contract Execution Is Provided Through That Portal For The Purpose Of Concluding An Electronic Contract Through A Single Web Portal Of Public Procurement The Procuring Entity Shall Prepare And Sign A Procurement Contract Not Later Than 3 Banking Days After The Acceptance Of The Tender Contract The Shipper Contractor Shall Sign The Contract Within 5 Banking Days Failure To Sign A Purchase Contract Within The Stipulated Period Is Considered As A Waiver Of The Contract Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document

Key Value

Tender Value
Refer document
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail