Tenders Are Invited For Construction Site Supervision Services

Tender Detail

22494021
2019 S 170 415486
Self Funded
Tenders Are Invited For Construction Site Supervision Services
ICB
Eastern Europe
Balkans,European Union,G20
03-10-2019

Work Detail

Contract Notice Construction Site Supervision ServicesConsulting Services Construction Supervision During The Implementation Of The Site Construction Of The Marina Bar Road Deviation From The Republican Road I 6 Sofia RadomirDescription Exercise Construction Supervision During The Construction In Accordance With The Requirements Of The Spatial Planning Act Zut And By Laws Including Control Of The Construction Products Used In The Construction As Well As The Construction Works Performed Preparation And Signing Of All Acts And Protocols In Accordance With The Requirements Of The Legal Provisions Including Ordinance No 3 Of 31 7 2003 On The Drafting Of Acts And Protocols During The Construction Promulgated Sg As Subsequently Amended Completing All Necessary Documentation During The Construction Process Acts Protocols Tests And Measurements Certificates For Input Materials Declarations Of Conformity Etc And Informing The Contracting Authority Of Missing Documents As Well As Assistance In Obtaining Them Daily Control Of The Construction Process For Compliance Of The Construction With The Current Rules And Rules For The Execution Of Construction Works And For Compliance With The Requirements Of Art 169 Of The Spa And The Approved Investment Project As Well As In The Case Of Additional Construction Works Safety And Health Coordinator Activity During The Construction Phase In Accordance With The Minimum Requirements For Health And Safety At Work During The Construction And Installation Work Reporting On The Progress Of The Implementation Of The Contract And The Construction Works Carried Out Coordination Of The Construction Process Until The Putting Into Operation The Consultant Is Obliged To Execute Construction Supervision And To Coordinate The Implementation Of The Construction Of The Site Through Technically Competent Persons In Accordance With The Requirements Of Ordinance 02 20 25 Of 3 12 2012 On The Conditions And Procedure For Issuing A Certificate Of Entry In The Register Of Consultants For The Assessment Of The Conformity Of Investment Projects And Or The Exercise Of Construction Supervision The Staff Experts Of The Team Must Be On Site Throughout The Construction Period And Their Daily Attendance Must Be Fully Consistent With The Types Of Work That Will Be Performed On The Site According To The Construction Schedule Of The Construction Contract The Team Leader And The Safety And Health Coordinator Must Be On Site At All Times Throughout The Construction Period Construction Performance Management Project Management Certification Of Executive Documentation Drafting And Signing Of A Statement Of Findings In Accordance With Art 176 Para 1 Of The Spatial Development Act Which Certifies That The Construction Has Been Completed In Accordance With The Approved Investment Projects The Certified Executive Documentation The Requirements For The Construction Works Under Art 169 Para 1 And 3 Of The Spatial Planning Act And The Terms Of The Draft Contract Carrying Out Geodetic Surveying Of The Range Of The Road And The Facility Preparation Of Documentation And Provision Of A Certificate Under Art 54A Of The Cadastre And Property Register Act Assistance In Issuing All The Necessary Written Opinions From The Specialized Control Bodies The Contracts With The Operating Companies For Connection To The Technical Infrastructure Networks As Well As A Document From The Cadastre Agency For The Fulfillment Of The Requirements Under Art 175 Para 5 Of The Spa Preparation Of The Final Report On The Commissioning Of The Construction Preparation Of The Technical Passport Of The Building In Accordance With Ordinance No 5 28 12 2006 Take The Necessary Measures To Obtain A Permit To Use The Site In A Timely Manner Exercise Construction Supervision During The Repair Of Hidden Defects During The Warranty Period Fulfillment Of All Other Obligations Of The Consultant Stipulated In The Public Contract The Contract With The Contractor And The Legal Provisions Time Limit For Receipt Of Tenders Or Requests To Participate Date 03 10 2019 Local Time 16 30 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document

Key Value

Tender Value
Refer document
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail